Requirement of Additional Structures
Requirement of Additional Structures
The CD structures given in Schedule – B of the project road have been reviewed with respect to the
hydrological adequacy. The Google satellite imagery is used to identify the stream locations. The
30m SRTM data has been used for catchment delineation and accordingly the discharge has been
estimated as per provisions given in IRC:SP:13-2022. The plan & profile has also been reviewed for
additional culvert requirement.
Therefore, based on the above review methodology, following additional structures are required for
hydrologically adequate highway design;
Additional MNBs
1. 144+880 – 1x10m
2. 145+600 – 1x10m
3. 145+830 – 1x10m
4. 1+620 – 1x15m (there is railway bridge of 12m about 1.5 km u/s side)
5. 3+200 – 1x15m (there is railway bridge of 12m about 2 km u/s side)
6. 5+225 – 1x40m (there is railway bridge of 30m about 4 km u/s side)
1. 138+595 – 1x8.0m
2. 5+500 – 1x10m
3. 6+900 – 1x12m
4. 7+100 – 1x12m
Additional Culverts
1. 114+460 – 1x2x1.5m
2. 123+300 – 1x2x1.5m
3. 127+710 – 1x2x2.0m
4. 140+740 – 1x2x2.0m
5. 141+160 – 1x2x2.0m
6. 141+440 – 1x2x2.0m
7. 146+080 – 1x2x2.0m
8. 146+770 – 1x2x2.0m
9. 0+310 – 1x2x2.0m
10. 3+800 – 1x2x2.0m
11. 6+060 – 1x2x2.0m
Stream Realignment