Date: 07 Feb.

2024

Attn: Philippine Registry of Shipping


Inspector

Subject Phil Registry of Shipping (PRS) Corrective Action

Dear sir,
Pleasant good morning sir. On behalf of the owner, OSM Ship Management were
sending the following corrective action as per attached as follows:

A: Wing Tank Class 3


1. Upper wing tanks no.1 S.

-Deck plating found with spot of corrosion


-Side shell plating stiffeners welding found with some cravice corrosion
-Flushed manhole found corroded inside and outside

Corrective Action: Marine Manager advise Master to chipping inside and outside
painting completed. See pictures below.

1 Page
- Wing tank No. 3, 4 & 6 Flushed manhole found corroded (inside and outside)
Corrective Action: Marine Manager advise Master to chipping inside and outside
painting completed. See pictures below.

Wing Tank No.3S Wing Tank No.4S

Wing Tank No.6S

2 Page
- Wing tank No. 5 S
Web frame and vertical stiffener found cutted
Frame no.84 web frame upper portion found cutted
Frame no.75-80 framing lower portion found cutted
Deck plate found corroded.
flushed manhole found corroded (inside and outside)

Pending Action: Request certified welder needed when installing the frame to pass the
Class PRS inspection our crew not expert to do this job and type kind
of
ship welding.
Wing tank No. 5 S

3 Page
- Wingtank No. 7
Deck plating found with spot corrosion and flushed manhole found corroded (inside
and outside)
Corrective Action: Marine Manager advise Master to chipping inside and outside
painting completed. See pictures below.

Wing tank No.7 S

-Wing tank No. 2 and 8 Closed at time of survey.

SCorrective Ation: The Marine Manager instucted the chipping and painting
inside and outside completed. See pictures below.

Wing Tank No.2S Wing Tank No.8 S

4 Page
-Wing tank No. 2,3 and 6
Flushed manhole found corroded (inside and outside)
Deck Plating found with spot of corrosion

Corrective Action: Marine Manager advise Master to chipping inside and outside
painting completed. See pictures below.

Wing Tank No.2 P Wing Tank No.3 P

Wing Tank No.6 P

5 Page
-Wing Tank no. 4 portside..
Side shell plating and stiffeners found with bulging
(Approximately frame number 80-95 )
Deck plating found with spot of corrosion

Corrective Action: Marine Manager instructed Master to do chipping and painting of


Deck plating and tank transverse bulkhead. Chipping and painting
completed. See pictures below.

Wing Tank no.4 P

6 Page
Before After

-Wing Tank no.5 portside.


Fushed manhole found not painted at time of survey

Corrective Action: Marine Manager instructed to do chipping and painting


on flushed manhole of Wing Tank No. 5 Portside.
Chipping and painting completed. See pictures below.

Wing Tank no.5 portside.


Before After

- Wing tank No. 7


Flushed manhole found not painted at the time of survey.
7 Page
Deck plating found corroded with spot and corrosion
Corrective Action: Marine Manager advise Master to chipping and painting of flushed
manhole. Chipping and painting completed. See pictures below.
Wing Tank 7 Port

B: Pumprrom Aft (P/S) Class 3

1. Pumproom (S)
- Engine(for sand suction:
- Pump and pipeline found with spot corrosion.

Corrective Action: Marine Manager instructed Master to chipping and painting of


pumproom (S) enigine (sand suctio) and pump and pipeline found with spot
corrosion. Derusting, cleaning and painting completed. See pictures below.

Pump No.1 (for water discharge)


External, pipeline and valves with spot corrosion.
- Main Suction Pump
Externals, pipeline and valves with corrosion
Corrective Action: Marine Manager instructedchipping and painting of Pump No.1 external,
8 Page
pipe;ineand valves and Main Suction Pump external, pipeline and valves.
See painting and painting vompleted. See picture below.

2. Pumproopm (P)
- Pumproom No. 1 & 2 (for water discharge)
External, pipeline and valves with spot corrosion.
- Main Suction Pump
External, pipeline and valves with spot corrosion.

Corrective Action: Marine Manager instructedchipping and painting of Pumproom (P)


No. 1 & 2 (for water discharge) extenal, pipeline and valves and Main
Suction Pump external, pipeline and valves. Chipping and painting
Completed. See pictures below.