PROCEDURES MANUAL JOB NO: SP-PJ-0446

DESIGN CONTROL REVISION: R0


HOLLOW CORE SLABS PAGE: 1
HCS SLAB LIST DATE: 18/02/2018

PROJECT: - LABOR ACCOMMODATION BUILDING DESIGNED: MS

SLAB TYPE SIGN:

BUILDING: - LABOR ACCOMMODATION BUILDING CHECKED: TM

200 FLOOR: - FIRST FLOOR SIGN:

0.099 LOCATION: - AL WAKRA LOGISTICS PARK


DRAWN: MIH

G-50 CUSTOMER: - AL SEAL TRADING & CONTRACTING CO. SIGN:

SLAB DIMENSIONS (MM) STRAND (NOS) / 1.2m WIDTH NET AREA (M2) NET WEIGHT (TON) VOL (M3)
CUT-OUT REMARKS
12.7 MM
MARK NOS WIDTH LENGTH EACH TOTAL EACH TOTAL TOTAL
(BOTTOM)

LAB-FF-20-01 1 690 5790 7 4.00 4.00 0.99 0.99 0.40 √


LAB-FF-20-02 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-03 1 730 5790 7 4.23 4.23 1.05 1.05 0.42 √
LAB-FF-20-04 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-05 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-06 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-07 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-08 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-09 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-10 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-11 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-12 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-13 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-14 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-15 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √
LAB-FF-20-16 1 1200 5790 7 6.95 6.95 1.72 1.72 0.69 √

TOTAL 16 105.49 26.11 10.44

√ -- this issuance for fabrication


Drawing Transmittal
SPC-DES-F-005 | 30-Jul-17 | V2.0

REFERENCE NO. : SP-TF-17138


DATE : 2/8/2024
ACTION:
ISSUED FOR CONSTRUCTION ISSUED FOR RECTIFICATION

ISSUED FOR FABRICATION √ ISSUED FOR INFORMATION

ISSUED FOR MOULD FABRICATION ISSUED FOR MOCK UP

CUSTOMER DETAILS:

JOB NUMBER : SP-PJ-1019

CUSTOMER : AL MEERA

PROJECT : PROPOSED AL MEERA HYPERMARKET & MIXED-USE DEVELOPMENT (G)

LOCATION :

DESCRIPTION:

NAME OF PRODUCT: HOLLOW CORE SLAB (265mm THK)


A1 MAIN BUILDING MAIN ROOF FLOOR
ENCLOSED DRAWINGS:
SP-PJ-1019-A1MB-MRF-HC-265-01
HCS SLAB LIST
HCS ELONGATION

VOLUME (HCS): = 3.10 M³


AREA (HCS): = 112.28 M²
ISSUED BY: SL

CHECKED BY: SA / ME

APPROVED BY: EA

ISSUED TO:
SIGNATURE RECEIPT DATE
√ PRODUCTION MANAGER :

√ PLANNING MANAGER :

√ TECHNICAL MANAGER :

√ ERECTION ENGINEER (SITE) :

√ STOCKYARD SUPERVISOR :

√ ERP/DOCUMENT CONTROLLER :

√ LOGISTICS DEPARTMENT :

√ DESIGN FILE :

Page 2 of 3
PROJECT: -
SLAB TYPE
BUILDING: -
150 FLOOR: -
0.085 LOCATION: -

G-50 CUSTOMER: -
HOLLOW CORE SLAB CUTTING LIST FOR 150mm THICK (TYPE-1)
DIMENSIONS (mm) CUT-OUT NET AREA (M2) NET WEIGHT (TON) VOL (M3)
SLAB MARKING REMARKS
NOS WIDTH LENGTH EACH TOTAL EACH TOTAL EACH

1067-HC-T1-15-001 24 1200 2320 2.78 66.82 0.59 14.20 0.24

1067-HC-T1-15-002 1 410 2320 0.95 0.95 0.20 0.20 0.08

1067-HC-T1-15-003 1 900 2320 2.09 2.09 0.44 0.44 0.18

1067-HC-T1-15-004 1 510 2320 1.18 1.18 0.25 0.25 0.10

1067-HC-T1-15-005 1 435 2320 1.01 1.01 0.21 0.21 0.09

1067-HC-T1-15-006 1 405 2320 0.94 0.94 0.20 0.20 0.08

1067-HC-T1-15-007 1 1000 1435 1.44 1.44 0.30 0.30 0.12

1067-HC-T1-15-008 1 1125 2320 2.61 2.61 0.55 0.55 0.22

1067-HC-T1-15-009 1 805 2320 1.87 1.87 0.40 0.40 0.16

1067-HC-T1-15-010 1 765 1570 1.20 1.20 0.26 0.26 0.10

1067-HC-T1-15-011 1 705 2320 1.64 1.64 0.35 0.35 0.14

1067-HC-T1-15-012 1 1200 2320 * 2.78 2.78 0.59 0.59 0.24

1067-HC-T1-15-013 1 1200 2320 * 2.78 2.78 0.59 0.59 0.24

1067-HC-T1-15-014 1 910 2320 2.11 2.11 0.45 0.45 0.18

1067-HC-T1-15-015 1 350 2320 0.81 0.81 0.17 0.17 0.07

1067-HC-T1-15-016 1 900 2320 2.09 2.09 0.44 0.44 0.18

1067-HC-T1-15-017 1 485 2320 1.13 1.13 0.24 0.24 0.10

1067-HC-T1-15-018 4 1200 3270 3.92 15.70 0.83 3.34 0.33

1067-HC-T1-15-019 1 960 3270 3.14 3.14 0.67 0.67 0.27

TOTAL QTY. 45 107.5 112.28 3.10