Mahinda Rajapaksa International Stadium Homagama
Mahinda Rajapaksa International Stadium Homagama
Group 03
Supervisors:
Mr. Buddhika Weerasinghe
Prof. Udeni P. Nawagamuwa
2.2 Objectives
● Identifying a suitable plan for the Sports University which consists of lecture rooms,
research and training centers, restrooms, indoor sports complex, outdoor grounds,
pavilion, hostels, and other accommodation facilities, etc.
● Developing structural designs for the main university building and other related
facilities for the proposed Sports University complex
● Developing architectural designs for the university building, pavilion, and other related
buildings.
● Developing building services designs and drainage designs for the proposed facilities
● Performing financial analysis for the proposed work including operations and
maintenance cost and revenue.
● Preparing BOQ
1
3 Scope of Work, Tasks and Deliverables
3.1 Reconnaissance Survey
● Obtaining permission from relevant authorities.
● Determining reconnaissance route.
● Undertake observation and documentation of bio-physical characteristics.
● Undertake observation and documentation of socio-economic features.
● Undertake observation and documentation of issues, problems, threats, and
opportunities.
● Undertake observation and documentation of concerns not mentioned in literature or
interviews.
2
3.5.2 Social Feasibility
● Identification and elaboration of the social attributes of the location
● Assessing the social impacts of each alternative concerning the social attributes of the
region
3
● Proposed Features
▪ Architectural Features
▪ Green Features
▪ Sustainable Features
▪ Disaster Resilient Features
▪ Utility Features
❑ Water Supply Network
❑ Electricity Supply Network
❑ Road Network and Accessibility
❑ Lighting and Ventilation
❑ Fire Safety
❑ Lightning Protection
❑ Telecommunication and IT
❑ Waste Management and Sewerage
● Materials and Properties
● Superstructure Design
● Substructure Design
● Building Services Design
● Design of Finishes
● Arrangement of Equipment and Other aspects
● Drainage management plan
● Waste management plan
▪ Wastewater and Solid waste management
4
● Traffic management plan
● Safety Plan
● Emergency plan
3.11 Deliverables
● 3 Alternative designs
● Feasibility study reports
▪ Environmental Feasibility
▪ Socio-economic Feasibility
▪ Technical Feasibility
● Environmental Impact assessment report
● Detailed design drawings
▪ Architectural design drawings
▪ Structural design drawings
▪ Finishes drawings
▪ MEP Drawings
● 3D architectural model of the project area
● Detailed structural analysis with SAP 2000/Midas Gen for super-structure of the
building
● Bill of quantities
● Drainage management plan
● Operational plans
▪ Traffic management plan
▪ Safety management plan
▪ Emergency plan