Professional Documents
Culture Documents
Mambwe
Mambwe
Mambwe
2/1
BULKING CENTRE-STORAGE SHED
Preambles
To collection 9,657.60
2/2
BULKING CENTRE-STORAGE SHED
SUBSTRUCTURE
To collection 26,588.85
2/3
BULKING CENTRE-STORAGE SHED
SUBSTRUCTURE
To collection 15,271.05
SUBSTRUCTURE
COLLECTION
Page No 3/4
SUBSTRUCTURE -
TOTAL CARRIED TO SUMMARY 51,517.50
2/5
BULKING CENTRE-STORAGE SHED
CONCRETE WORK
2/6
BULKING CENTRE-STORAGE SHED
2/7
BULKING CENTRE-STORAGE SHED
ROOFING
ROOF - TOTAL
CARRIED TO SUMMARY 9,223.50
2/8
BULKING CENTRE-STORAGE SHED
Shelving
Rates for locks are to include for providing each lock with a -
pair of keys. Each key is to have an approved plastic or -
metal tag with the name of the room or other necesasry -
identification indelibly printed thereon and attached to the -
key with a split steel ring -
2/9
BULKING CENTRE-STORAGE SHED
-
D Three lever QS 8535 locks, complete with QS 2701 BTB -
MTRED T' handles fixed to rosewood doors 1 nr 30.00 30.00
0
0
-
-
-
STRUCTURAL STEELWORK
Preamble
2/10
BULKING CENTRE-STORAGE SHED
-
D 150 x 50 x 20 x 2.5mm Cold Formed Lipped Channels -
as purlins 284 m 9.70 2,755.75
-
The following in steel roof members, shop primed with first -
coat of red oxide before delivery, including hoisting in -
position, welding, jointing etc -
-
E 60 x 60 x 6mm steel angle line as bracings 1,274 kg 3.00 3,822.00
-
The following in steel roof members, shop primed -
with first coat of red oxide before delivery to site including -
hoisting in position, welding, jointing etc -
-
F 102 x 3.0mm circular hollow section as eaves beam 532 kg 3.00 1,596.51
-
G 76 x 50 x 3mm rectangular section as fly bracings 100 nr 50.00 5,000.00
-
H 90 x 65 x 6mm rectangular section as fly bracings 100 nr 65.00 6,500.00
-
J 823 x 154 x 18mm End plate 10 nr 30.00 300.00
-
K 520 x 150mm End plate 10 nr 30.00 300.00
STRUCTURAL STEELWORK -
TOTAL CARRIED TO SUMMARY 43,446.26
METAL WORK
-
E 4000 x 2000mm galvanised expanded metal gate to -
Architect's design 1 nr 1750.00 1,750.00
PLUMBING INSTALLATIONS
Gutters
Preambles
2/13
BULKING CENTRE-STORAGE SHED
To Collection 500.00
Distribution Board
Supply, Install and Connect all Conduits, Conduit Fittings,
Cables, Cable Connections and Chiselling from
Meter Box to Distribution Board
A Flush mounted Distribution Boards (DB1) labelled 16 way
SP & N free standing with all accessories which shall include:
C 50V, 60A Pulse Width Modulation (PWM) charge controller 1 nr 130.00 130.00
2/15
BULKING CENTRE-STORAGE SHED
To Collection 11,165.00
2/16
BULKING CENTRE-STORAGE SHED
To Collection 7,540.00
COLLECTION
A 30mm thick floor screed to receive terrazzo floor finish 307 m² 6.60 2,026.20
and non slip porcelain floor tiles
-
F 10mm thick x 100mm high skirting 10 m 2.00 20.00
-
15mm cement and sand (1:4) plaster with steel trowel -
internally as described on: -
-
H Blockwork walls 392 m2 4.80 1,881.60
-
J To returns and reveals, girth not exceeding 100mm 64 m 1.20 76.80
-
18mm cement and sand (1:4) plaster with steel trowel -
externally as described on: -
-
K Blockwork 255 m2 5.40 1,377.00
-
L To returns and reveals, girth not exceeding 100mm 64 m 1.40 89.60
-
FLOOR, WALL AND CEILING
FINISHINGS SUMMARY 17,350.00
GLAZING
GLAZING - TOTAL
CARRIED TO SUMMARY 2,160.00
2/18
BULKING CENTRE-STORAGE SHED
PAINTING
Painting - Externally
SUMMARY PAGE
2/21
CHANGE ROOM AND GUARD HOUSE
3/22
CHANGE ROOM AND GUARD HOUSE
Preambles
To collection 2,241.80
3/23
CHANGE ROOM AND GUARD HOUSE
To collection 7,630.05
3/24
CHANGE ROOM AND GUARD HOUSE
To collection 4,537.80
COLLECTION
3/25
CHANGE ROOM AND GUARD HOUSE
Page No 3/4
SUBSTRUCTURE -
TOTAL CARRIED TO SUMMARY 14,409.65
CONCRETE WORK
3/26
CHANGE ROOM AND GUARD HOUSE
3/27
CHANGE ROOM AND GUARD HOUSE
ROOFING
3/28
CHANGE ROOM AND GUARD HOUSE
ROOF - TOTAL
CARRIED TO SUMMARY 1,404.00
3/29
CHANGE ROOM AND GUARD HOUSE
To Collection 3,070.00
3/30
CHANGE ROOM AND GUARD HOUSE
-
C 25mm diameter Chromuim Plated toilet flip-up grab bar, -
750mm long fixed to concrete blockwork 3 nr 50.00 150.00
To Collection 950.00
COLLECTION
STRUCTURAL STEELWORK
Preamble
3/31
CHANGE ROOM AND GUARD HOUSE
METAL WORK
3/32
CHANGE ROOM AND GUARD HOUSE
-
B Type 2.0M nominal size 800 x 2000mm 3 nr 97.00 291.00
-
C Type 1.5M nominal size 1000 x 2000mm 3 nr 97.00 291.00
-
D Type 1M nominal size 800 x 2000mm 2 nr 75.00 150.00
-
Aluminum windows in Nuklip casement systems anodised -
complete with all required ironmongery,operating,gear, 6.38mm -
thick glazing and glazing beads all round and fixing to curtain -
wall frame,including cutting and pinning lugs supports as -
described -
-
WINDOWS -
-
E Window type W1 overall size 2200 x 1000mm 1 nr 360.00 360.00
-
F Window type W2 overall size 900 x 1000mm 2 nr 180.00 360.00
-
G Window type W3 overall size 600 x 600mm 6 nr 90.00 540.00
-
H Window type W4 overall size 1200 x 600mm 2 nr 180.00 360.00
PLUMBING INSTALLATIONS
Gutters
3/33
CHANGE ROOM AND GUARD HOUSE
To Collection 1,755.00
PLUMBING INSTALLATIONS
Sanitary Installation
3/34
CHANGE ROOM AND GUARD HOUSE
To collection 340.00
PLUMBING INSTALLATIONS
Sanitary Fittings
3/35
CHANGE ROOM AND GUARD HOUSE
To Collection 3,379.00
PLUMBING INSTALLATIONS
3/36
CHANGE ROOM AND GUARD HOUSE
To Collection 934.00
PLUMBING INSTALLATIONS
3/37
CHANGE ROOM AND GUARD HOUSE
2,220.00
COLLECTION
Preambles
3/38
CHANGE ROOM AND GUARD HOUSE
To Collection 300.00
Distribution Board
Supply, Install and Connect all Conduits, Conduit Fittings,
Cables, Cable Connections and Chiselling from
Meter Box to Distribution Board
A Flush mounted Distribution Boards (DB1) labelled 6 way
SP & N free standing with all accessories which shall include:
3/39
CHANGE ROOM AND GUARD HOUSE
TP Bus-bars
Inspection Box
1000x1000mm Earth mat
Surge protector
Inspection box
Earthing rods 1 nr 1,200.00 1,200.00
B Flush mounted Distribution Boards (DB2) labelled 6 way
SP & N free standing with all accessories which shall include:
3/40
CHANGE ROOM AND GUARD HOUSE
C 50V, 60A Maximum Power Point Tracking (MPPT) charge contr 1 nr 130.00 130.00
To Collection 4,132.00
3/41
CHANGE ROOM AND GUARD HOUSE
-
D 10A, 250V, 50Hz single phase two gang, one way switch 1 nr 22.00 22.00
-
E Allow for provision of safe house item 100 300.00
-
F 250V/50Hz Photo cell as "PHILIPS" or equal and -
approved make 1 nr 25.00 25.00
To Collection 2,008.00
COLLECTION
3/42
CHANGE ROOM AND GUARD HOUSE
To Collection 4,107.40
18mm cement and sand (1:4) plaster with wood float finish
externally as described on:
3/43
CHANGE ROOM AND GUARD HOUSE
To Collection 1,730.20
COLLECTION
GLAZING
GLAZING - TOTAL
CARRIED TO SUMMARY 40.00
3/44
CHANGE ROOM AND GUARD HOUSE
PAINTING
Painting - Externally
3/45
CHANGE ROOM AND GUARD HOUSE
SUMMARY PAGE
3/46
CHANGE ROOM AND GUARD HOUSE
3/47
DRAINAGE
4/48
DRAINAGE
To Collection 147.20
4/49
DRAINAGE
To Collection 2,944.80
4/50
DRAINAGE
To collection 2,578.00
4/51
DRAINAGE
4/52
DRAINAGE
To Collection 2,941.00
4/53
DRAINAGE
-
Q Boxing out 457 x 610mm size rebated hole through -
150mm reinforced concrete slab including any formwork 1 Nr 100.00 100.00
To Collection 2,845.60
To Collection 1,375.00
COLLECTION
4/54
DRAINAGE
4/55
DRAINAGE
SUMMARY PAGE
DRAINAGE -
TOTAL CARRIED TO GENERAL SUMMARY 14,573.60
4/56
DRAINAGE
4/57
EXTERNAL WORKS
5/58
EXTERNAL WORKS
5/59
EXTERNAL WORKS
WATER RETICULATION
5/60
EXTERNAL WORKS
5/61
EXTERNAL WORKS
-
D Filling; 200mm thick stabilised gravel with 5% cement -
as blinding laid to even across falls and well watered -
roll, compacted in 100mm layers and consolidated -
to 95 percent of modified AASHTO density 26 m² 20.00 520.00
-
E Blinding; 150mm thick stabilised crushed stones with -
5% cement laid to even across falls and well watered -
roll, compacted in 150mm layers and consolidated -
to 93 percent of modified AASHTO density 26 m² 20.00 520.00
-
Hardcore or gravel to be obtained offsite -
-
F Filling; 350mm thick bed of gravel as sub base -
laid to even across falls and well watered roll, -
compacted in 150mm layers and consolidated -
to 98 percent of modified AASHTO density 15 m² 20.00 300.00
-
Reinforced In-situ Concrete Grade C30 as described -
-
G Bases 5 m3 135.00 675.00
-
H Stub columns 1 m3 135.00 135.00
-
J Ground beams 2 m3 135.00 270.00
To Collection 4,180.00
5/62
EXTERNAL WORKS
To Collection 3,114.00
STRUCTURAL STEEL
5/63
EXTERNAL WORKS
-
B IPE 120 x 64 x 10kg Universal Beam 156 Kg 3.00 468.00
-
C 100 x 50 x 10kg Parallel Frange Beam 528 Kg 3.00 1,584.00
-
D 50 x 25mm diameter angle lines as handrails, ladder -
protection, welded to Y25 Bar risers 104 m 3.00 312.00
-
E Y25 Bar risers to engineers details 90 Kg 3.00 270.00
-
G 300 x 300 x16mm thick mild steel Base Plate 6 nr 50.00 300.00
-
H 250 x 150 x10mm thick mild steel Gusset Plate 30 nr 3.00 90.00
-
J 210 x 150 x12mm thick mild steel End Plate 30 nr 3.00 90.00
-
K M24, grade 8.8 J-bolts 900mm long 6 nr 5.00 30.00
-
L M16, grade 8.8 bolts 68 nr 0.75 51.00
-
M M20, grade 8.8 bolts 24 nr 0.75 18.00
-
N Allow for grouting welded joints and undersides of base plates item 100.00 100.00
-
Timber Decking -
-
P Hard wood timber decking size 7800X225X75mm 38 m2 13.00 494.00
Generally
To Collection 4,569.00
STRUCTURAL STEEL
COLLECTION
5/64
EXTERNAL WORKS
SUMMARY PAGE
5/65
EXTERNAL WORKS
EXTERNAL WORKS -
TOTAL CARRIED TO GENERAL SUMMARY 25,714.40
5/66
PROVISIONAL AND PRIME COST SUMS - MARKET WATERBORNE
TOILET BLOCK TYPE 1
Labour
Materials
To Collection 233.50
6/67
PROVISIONAL AND PRIME COST SUMS - MARKET WATERBORNE
TOILET BLOCK TYPE 1
To Collection 14,258.30
COLLECTION
6/68
ITEM DESCRIPTION UNIT QTY RATE/USD AMOUNT
BILLS OF QUANTITIES
FOR
MINISTRY OF AGRICULTURE
GENERAL SUMMARY
(i)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
Brought Forward
Name of Firm:…………………………………………………………………
Address:…………………………………………………………………………..
Date:………………………………………………………………………………….
Client
P.O.BOX
LUSAKA
(ii)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
BILLS OF QUANTITIES
VOLUME 1 - REHABILITATION OF
INFRASTRUCTURE AND CONSTRUCTION OF
TRAINING FARM COMPRISING: MAIN BUILDING,
FARM SHED, POULTRY HOUSE, PIGGERY,
HORTICULTURE SHED, GUARD HOUSE, DAIRY
UNIT, ABLUTION BLOCK TYPE 1, VETERINARY
CLINIC, COW PADDOCK, MILKING PARLOUR AND
ASSOCIATED EXTERNAL WORKS; 1x8No.
CLASSROOM BLOCK; LIBRARY AND
ASSOCIATED EXTERNAL WORKS AT
NATURAL RESOURCES DEVELOPMENT
COLLEGE IN LUSAKA
FOR
MINISTRY OF AGRICULTURE
VOLUME 1 SUMMARY
(iii)