BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

BULKING CENTRE-STORAGE SHED

Note: The Contractor's attention is drawn particulary


to Bill Nr 2 and specifications which contain, in addition
of further items, preambles descriptions of materials
and workmanship, further information that will
considerably affect his/her rates for the measured works,
and it is most important that he/she reads and fully
acquaints himself/herself (and his/her Sub-Contractors
and Suppliers) with all the information and requirements
that are contained therein.

2/1
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE (All PROVISIONAL)

Preambles

The substructure has been measured up to and


including the Concrete Floor Bed.

The site is assumed to be level and the


substructure has been measured accordingly

A Treating surface to hardcore filling, under floor bed,


bottoms and sides of excavations with approved
ant-termite as described 800 m2 2.50 2,000.00
-
B Excavating vegetable soil average depth 150mm -
and dispose offsite 500 m² 0.72 360.00
-
C Excavating foundation trenches starting from reduced level -
and depth not exceeding 1.50m 110 m³ 3.60 396.00
-
D Excavating pits starting from reduced level -
and depth not exceeding 1.50m 36 m³ 3.60 129.60
-
E Extra over for excavating in hard rock as described 15 m³ 20.00 292.00
-
F Backfilling around foundations with excavated material 100 m³ 12.00 1,200.00
-
G Disposal of excavated material off site 46 m³ 12.00 552.00
-
H Levelling and compacting bottoms of excavations 120 m2 2.40 288.00
-
J 300mm thick hardcore filling laid level, well watered, -
roll compacted and consolidated in layers of 100mm thick -
to 95 percent of modified AASHTO density as described 320 m2 12.00 3,840.00
-
K Keep all excavations free from general water Item 300.00 300.00
-
L Provide all necessary planking and strutting to faces -
of excavations as described Item 300.00 300.00
-

To collection 9,657.60

2/2
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE

Plain in-situ concrete Grade C15 as described

A 50mm thick Blinding in foundation trenches 94 m³ 123.00 11,562.00


-
Reinforced in-situ concrete Grade C30 as described -
-
B Foundation Footing 23 m³ 135.00 3,105.00
-
C Foundation Bases 7 m³ 135.00 945.00
-
D Stub Columns 3 m³ 135.00 405.00
-
E 150mm thick Floor bed 320 m2 20.25 6,480.00
-
F 100mm thick Ramps 15 m2 20.25 303.75
-
G Stairs 2 m2 20.25 40.50
-
High yield steel deformed bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWG annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
H 16mm diameter bar 594 kg 1.80 1,069.20
-
J 8mm diameter bar 148 kg 1.80 266.40
-
K Conforce mesh No. '257' fabric reinforcement with -
150mm side and end laps including all necessary -
tying wire and distance blocks (measured net no -
allowance made for laps) 335 m² 7.20 2,412.00
-

To collection 26,588.85

2/3
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE

Sawn formwork to reinforced in-situ concrete as described

A To edges of Floor Bed not exceeding 100mm high 72 m 30.00 2,160.00


-
B To sides of Ramps not exceeding 100mm high 10 m 30.00 300.00
-
C To sides of Stub Columns 23 m² 30.00 690.00
-
D To sides of Stairs 15 m² 30.00 450.00
-
D 500 gauge 2ply polythene damp proof membrane laid -
on blinded hardcore with 150mm side and end laps -
with approved adhesive tape both sides -
(no allowance made for laps) 320 m² 3.60 1,152.00
-
Precast concrete hollow blocks type A (5.0N/mm2) -
filled solid with plain in-situ concrete Grade C12 bedded -
in cement and sand (1:4) mortar as described -
-
E 200mm walls 291 m² 28.80 8,380.80
-
Brick force laid horizontally every second course as described -
-
F 200mm wide (no allowance made for laps) 479 m 0.75 359.25
-
Expansion Joint -
-
G Forming 20mm wide cavity in hollow walls and concrete floor -
bed, filled with flexel or other equal and approved cavity filler -
for expansion joint and pointed with mastic 23 m2 30.00 690.00
-
H 20 x 20mm mastic pointing to vertical and horizontal -
ends of 20mm wide expansion joint 3 m 15.00 45.00
-
18mm cement and sand (1:4) plaster with wood float finish -
as described on: -
-
J Plinth of concrete Blockwork and Concrete Floor Bed 60 m² 7.20 432.00
-
2/4
BULKING CENTRE-STORAGE SHED

K Prepare and apply three coats black bituminous paint as -


described on plastered walls 60 m² 10.20 612.00

To collection 15,271.05

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE

COLLECTION

Page No 3/1 9,657.60

Page No 3/2 26,588.85

Page No 3/3 15,271.05

Page No 3/4

SUBSTRUCTURE -
TOTAL CARRIED TO SUMMARY 51,517.50

2/5
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

CONCRETE WORK

Reinforced in-situ Concrete Grade C25 as described

A Ring Beam 3 m3 135.00 405.00


-
C Roof Pads 1 m3 135.00 135.00
-
Sawn formwork to reinforced in-situ concrete as described -
-
F Sides and soffits of Ring Beam 33 m2 30.00 990.00
-
H Sides of Roof Pads 28 m2 30.00 840.00

High yield steel deformed bar reinforcement as described


including all cutting bending; hooking and cranking
assembly etc. in accordance with drawings and wiring
including No. 16 SWA annealed iron bending wire and
hoisting and lowering and fixing in position

J 16mm diameter bar 504 kg 1.80 907.20


-
High yield steel round bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWA annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
K 8mm diameter bar 139 kg 1.80 250.20
-
-
CONCRETE WORK - TOTAL -
CARRIED TO SUMMARY 3,527.40
-
-
-

2/6
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

BLOCKWORK AND BRICKWORK

Precast concrete hollow block Type 'A' (2.5N/mm2)


bedded in cement and sand mortar (1:4) as described

A 150mm thick wall 15 m2 15.00 225.00


-
B 200mm thick wall 290 m2 22.00 6,380.00
-
Brickforce laid horizontally every third course as described -
-
C 150mm wide brickforce (No allowance made for laps) 20 m 0.75 15.00
-
D 200mm wide brickforce (No allowance made for laps) 479 m 0.75 359.25

Three ply bituminous felt damp proof course as described


bedded and pointed in cement and sand (1:4) mortar
lapped 75mm in the running length and the full width at
angles

E 150mm wide (No allowance made for laps) 5 m 0.50 2.50


-
F 200mm wide (No allowance made for laps) 70 m 0.50 35.00
-
G 200 x 200mm precast concrete air bricks finished -
flush with plaster both externally and internally 86 nr 4.00 344.00

BLOCKWORK AND BRICKWORK - TOTAL


CARRIED TO SUMMARY 7,360.75

2/7
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

ROOFING

0.6mm thick Chromadek pre-coated IBR corrugated


galvanised steel roofing sheets with approved end and
side lapping fixed accordance with manufacturers
recommendations as described

A Roof sheets fixed to Lipped Channels


(measured seperately) with self tapping screws 357 m2 19.50 6,961.50
-
B Roof sheets with bull nose fixed to Lipped Channels -
(measured seperately) with self tapping screws 61 m2 19.50 1,189.50
-
C Roof sheets as side cladding fixed to Lipped Channels -
(measured seperately) with self tapping screws 55 m2 19.50 1,072.50
-

ROOF - TOTAL
CARRIED TO SUMMARY 9,223.50

2/8
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

CARPENTRY,JOINERY AND IRONMONGERY

44mm internal quality Flush door suitable for


painting fixed to steel frame complete with
architrave (Measured Seperately)

A Door size 1725 x 1960mm as Door type 3 1 nr 100.00 100.00

Shelving

B 22mm thick Double Faced Laminated Medium Density 0


Fibre board in shelving fixed to 400 x 400mm mild steel 0
bracketsat 1000mm centres (measured seperately) 4 m² 45.00 180.00
0
Bulletin board of approved manufacturer comprising cork-filled -
polymers eastomet composite board or other equal and -
approved including hardwood frame fixed appropriately to -
walls as described -
-
C Bulletin board size 2400 x 1240mm 1 nr 150.00 150.00
-
Ironmongery

Rates for locks are to include for providing each lock with a -
pair of keys. Each key is to have an approved plastic or -
metal tag with the name of the room or other necesasry -
identification indelibly printed thereon and attached to the -
key with a split steel ring -
2/9
BULKING CENTRE-STORAGE SHED

-
D Three lever QS 8535 locks, complete with QS 2701 BTB -
MTRED T' handles fixed to rosewood doors 1 nr 30.00 30.00
0
0
-
-
-

CARPENTRY,JOINERY AND IRONMONGERY -


TOTAL CARRED TO SUMMARY 460.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

STRUCTURAL STEELWORK

Preamble

(i) All steel to be Grade 43

(ii) Steelwork should be prefabricated in selections by an


approved steel fabricator

(iii) All welds to be 6mm minimum fillet welds unless


otherwise

The following in structural steel members, shop primed with


first coat of red oxide before delivery, including hoisting in
position, welding, jointing etc

A 203 x 133 x 25kg/m Universal Beams as Rafters 1,900 kg 3.00 5,700.00


-
B 152 x 155 x 31kg/m Universal Beams as Colums 2,604 kg 3.00 7,812.00
-
C 203 x 203 x 46kg/m Universal Beams as Eaves Beam 3,220 kg 3.00 9,660.00
-
The following in Cold Formed Lipped Channels shop primed -
before delivery including hoisting, jointing, welding and -
mounting in position, embeded in concrete roof pads -
as described -

2/10
BULKING CENTRE-STORAGE SHED

-
D 150 x 50 x 20 x 2.5mm Cold Formed Lipped Channels -
as purlins 284 m 9.70 2,755.75
-
The following in steel roof members, shop primed with first -
coat of red oxide before delivery, including hoisting in -
position, welding, jointing etc -
-
E 60 x 60 x 6mm steel angle line as bracings 1,274 kg 3.00 3,822.00
-
The following in steel roof members, shop primed -
with first coat of red oxide before delivery to site including -
hoisting in position, welding, jointing etc -
-
F 102 x 3.0mm circular hollow section as eaves beam 532 kg 3.00 1,596.51
-
G 76 x 50 x 3mm rectangular section as fly bracings 100 nr 50.00 5,000.00
-
H 90 x 65 x 6mm rectangular section as fly bracings 100 nr 65.00 6,500.00
-
J 823 x 154 x 18mm End plate 10 nr 30.00 300.00
-
K 520 x 150mm End plate 10 nr 30.00 300.00

STRUCTURAL STEELWORK -
TOTAL CARRIED TO SUMMARY 43,446.26

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

METAL WORK

Zam 100 rebated pressed steel door frames as manufactured


by Zambezi Steel Limited or other equal and approved including
one pair of butt hinge welded on adjustable striker plate and
rubber buffers primed with one coat of red oxide before delivery,
building in lugs to blockwork as described

A Type 2M nominal size 4000 x 3000mm 1 nr 250.00 250.00


-
B Type 2M nominal size 1800 x 2000mm 1 nr 187.00 187.00
-
Supply and fix standard cottage window section as Zambezi -
Steel Limited or other equal and approved make primed -
before delivery including Y12 mild steel barglar bars and all -
necessary couplings, assembling, cutting and pinning or -
plugging and screwing, building into wall and pointed all round -
-
C Type W1 overall size 3000 x 1000 mm movable louvres 8 nr 465.00 3,720.00
-
Trellidor gate or other equal and approved security -
door as described

D 4000 x 3000mm steel shutter door to Architect's design 1 nr 2000.00 2,000.00


2/11
BULKING CENTRE-STORAGE SHED

-
E 4000 x 2000mm galvanised expanded metal gate to -
Architect's design 1 nr 1750.00 1,750.00

METAL WORK - TOTAL


CARRIED TO SUMMARY 7,907.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

Gutters

A 150mm diameter half round PVC gutter fixed to eaves with


PVC clumps every 1500mm interval 40 m 16.00 640.00
-
UPVC rain water down pipes fixed to structural steel as -
described -
-
B 100mm diameter rain water down pipe 36 m 12.00 432.00
-
C Extra over 100mm rain water down pipe for 100mm -
diameter horse shoe 10 nr 25.00 250.00
-
D Extra over 100mm rain water down pipe for 100mm -
diameter PVC grating down pipe inlet 10 nr 22.00 220.00
-
E Extra over 100mm rain water down pipe for swan neck 10 nr 22.00 220.00
-
PLUMBING INSTALLATION - TOTAL
CARRIED TO SUMMARY 1,762.00
2/12
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT AMOUNT

SOLAR ELECTRICAL INSTALLATION

Preambles

The Contractor is deemed to have included in his


rates for the following;-

i Cutting or forming holes, chases and other


general wwork required including making good
finishings and other works disturbed

ii Constant supervision by a supervisor


possessing approved qualifications

iii Protection of installation until handed over our for


taking requisite precautions to protect workmen
and the public from electric shocks or burns

2/13
BULKING CENTRE-STORAGE SHED

iv Comply with all necessary by laws and rules


with which the installation shall be required
to comply

v Allow for bonding all roofs, water pipes, waste


pipes, sinks etc

vi All services are to be sub - contracted to


specialised service, providers as per relevant
National Council for construction category

To Collection 500.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Distribution Board
Supply, Install and Connect all Conduits, Conduit Fittings,
Cables, Cable Connections and Chiselling from
Meter Box to Distribution Board
A Flush mounted Distribution Boards (DB1) labelled 16 way
SP & N free standing with all accessories which shall include:

1No. 80A TP MCB (Incoming)


2No. 60A SP MCB
6No. 30A SP MCB
10No. 10A SP MCB
4No. Spares
Neutral Bar
TP Bus-bars
Inspection Box
1000x1000mm Earth mat
Surge protector
Inspection box
2/14
BULKING CENTRE-STORAGE SHED

Earthing rods 1 nr 1200.00 1,200.00


B Flush mounted Distribution Boards (DB2) labelled 6 way
SP & N free standing with all accessories which shall include:

1No. 60A 2P Direct Current MCB


2No. 10A 2P Direct Current MCB
1No. 65kA 2P Direct Current Surge protection device
2No. Spares
Inspection box 1 nr 500.00 500.00

C Solis Mini 4G series inverter or other equal and


approved brand with the following
ratings:-
Capacity : 700W
AC Voltage out put : 230 V
DC Voltage input : 12V
Output frequency : 50 Hz I 0.05%
Out put wave form: Pure sine wave including
Overload protection
Overvoltage protection
protection function: Overload
: Overcharge
: Low battery Voltage
: High frequency
(These stop constant current , constant voltage
and float charging) 1 No. 500.00 500.00
To Collection 2,200.00
ITEM DESCRIPTION QTY UNIT AMOUNT

SOLAR ELECTRICAL INSTALLATION

Supply, install and connect all conduits, conduit fittings,


UV solar PV cables, battery cables, flexi cables and
cable connections from the Solar Panels to
Distribution Board to supply points, connected
conduit installations, switches and light fittings
(measured separately)

A 1005 x 670 x 35mm monocrystalline Solar panel module


330W PV array, 22V, 7.06A Isc with 14.8% efficiency
complete with roof mounting structure, PV Connectors
and all necessary accessories 10 nr 350.00 3,500.00

B 12 V - 200AH Lithium Ion Drop in battery with D.O.D


18% and 90% efficiency complete with battery rack
cabinet and all other necesarry accessories 10 nr 495.00 4,950.00

C 50V, 60A Pulse Width Modulation (PWM) charge controller 1 nr 130.00 130.00

2/15
BULKING CENTRE-STORAGE SHED

D 10A, 250V 2P direct current (DC) (PV) isolater as Legrand


or equal and approved 2 nr 50.00 100.00

Supply, install and connect all conduits, conduit fittings,


cables and cable connections from Distribution Board to
supply points, connected conduit installations, switches and
light fittings (measured separately)

E Single surface mounted light point on one gang one way


switch 79 nr 27.00 2,133.00

F Single surface mounted light point on two gang one way


switch 16 nr 22.00 352.00

To Collection 11,165.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Supply, install and connect the following light fittings, fixing in


accordance with manufacturers' instructions; Philips range
or other equal and approved

A 1x20W LED 1250mm long ceiling mounted, complete with


tri proof milk frosted cover and all necessary accessories 79 nr 75.00 5,925.00
-
B 1 x 18W, outdoor LED surface mounted fluorescent light -
fitting complete with all accessories 18 nr 65.00 1,170.00
-
Flush mounted 'LEGRAND' or other equal and approved -
light switches -
-
C 10A, 250V, 50Hz single phase one gang, one way switch 6 nr 20.00 120.00
-
D Allow for provision of safe house item 300.00 300.00
-
E 250V/50Hz Photo cell as "PHILIPS" or equal and -

2/16
BULKING CENTRE-STORAGE SHED

approved make 1 nr 25.00 25.00

To Collection 7,540.00

COLLECTION

Page 2/13 500.00

Page 2/14 2,200.00

Page 2/15 11,165.00

Page 2/16 7,540.00

SOLAR ELECTRICAL INSTALLATION - TOTAL


CARRIED TO SUMMARY 21,405.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

FLOOR AND WALL FINISHINGS

Cement and sand (1:3) screed finished to floor finish


(measured seperately) as described

A 30mm thick floor screed to receive terrazzo floor finish 307 m² 6.60 2,026.20
and non slip porcelain floor tiles

Terrazo paving comprising water repellant cement tinted grey


and white marble chippings (1:2) laid on cement and sand
screed (measured seperately) complete with dividers -
-
B 25mm Paving to floor screed (measured seperately) 307 m2 36.00 11,052.00
-
C 100mm high x 10mm thick Terrazo skirting 65 m 3.60 234.00
-
D 30mm thick polished paving laid on ramps and stairs 15 m2 36.00 540.00
-
Full bodied Non Slip Porcelain floor tiles fixed with -
approved adhesive to cement and sand screed -
(measured separately) and pointed in white cement -
-
E 600 x 600 x 10mm thick 8 m2 6.60 52.80
2/17
BULKING CENTRE-STORAGE SHED

-
F 10mm thick x 100mm high skirting 10 m 2.00 20.00
-
15mm cement and sand (1:4) plaster with steel trowel -
internally as described on: -
-
H Blockwork walls 392 m2 4.80 1,881.60
-
J To returns and reveals, girth not exceeding 100mm 64 m 1.20 76.80
-
18mm cement and sand (1:4) plaster with steel trowel -
externally as described on: -
-
K Blockwork 255 m2 5.40 1,377.00
-
L To returns and reveals, girth not exceeding 100mm 64 m 1.40 89.60
-
FLOOR, WALL AND CEILING
FINISHINGS SUMMARY 17,350.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

GLAZING

Glazing to metal frame with putty as described

A 6.38mm thick clear glass in window


exceeding 0.1m² not exceeding 0.5m² fixed with putty 24 m2 90.00 2,160.00

GLAZING - TOTAL
CARRIED TO SUMMARY 2,160.00

2/18
BULKING CENTRE-STORAGE SHED

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PAINTING

Painting - Externally

Prepare and apply one undercoat and two coats Plascon


"MARROCCA TEXTURE" paint to manufacturer's
specifications to the following surfaces

A To plastered walls 255 m2 6.20 1,581.00


-
B To returns and reveals, girth not exceeding 100mm 85 m 1.00 85.00
-
Painting - Internally -
-
Prepare and apply one undercoat and two coats of -
washable PVA emulsion paint as described -
-
D To plastered walls 392 m2 7.20 2,822.40
-
2/19
BULKING CENTRE-STORAGE SHED

E To returns and reveals, girth not exceeding 100mm 52 m 1.30 67.60


-
Touch up primer and apply one undercoat and two gloss -
finish to surfaces as described as Plascon or -
equal and approved -
-
F To steel primed structural members exceeding 200mm -
but not exceeding 300mm 3,137 m 1.20 3,764.40
-
G To steel primed door frames girth exceeding 200mm -
but not exceeding 300mm 20 m 1.20 24.00
-
H To steel primed window frames 14 m2 7.20 100.80
-
J To steel primed burglar bars 48 m2 7.20 345.60
-
-
-

PAINTING AND DECORATING


CARRIED TO SUMMARY 8,790.80

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUMMARY PAGE

SUBSTRUCTURE 2/5 51,517.50

CONCRETE WORK 2/6 3,527.40

BRICKWORK AND BLOCKWORK 2/7 7,360.75

ROOFING 2/8 9,223.50

CARPENTRY, JOINERY & IRONMONGREY 2/9 460.00

STRUCTURAL STEELWORK 2/10 43,446.26

METAL WORK 2/11 7,907.00

PLUMBING INSTALLATION 2/12 1,762.00


2/20
BULKING CENTRE-STORAGE SHED

SOLAR ELECTRICAL INSTALLATION 2/16 21,405.00

FLOOR, WALL AND CEILING FINISHINGS 2/17 17,350.00

GLAZING 2/18 2,160.00

PAINTING AND DECORATIONS 2/19 8,790.80

BULKING CENTRE-STORAGE SHED TOTAL


CARRIED TO GENERAL SUMMARY 174,910.21

2/21
CHANGE ROOM AND GUARD HOUSE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

GUARD HOUSE AND ABLUTION BLOCK

Note: The Contractor's attention is drawn particulary


to Bill Nr 2 and specifications which contain, in addition
of further items, preambles descriptions of materials
and workmanship, further information that will
considerably affect his/her rates for the measured works,
and it is most important that he/she reads and fully
acquaints himself/herself (and his/her Sub-Contractors
and Suppliers) with all the information and requirements
that are contained therein.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

3/22
CHANGE ROOM AND GUARD HOUSE

SUBSTRUCTURE (All PROVISIONAL)

Preambles

The substructure has been measured up to and


including the concrete bed.

The site is assumed to be level and the


substructure has been measured accordingly

A Treating surface to hardcore filling under floor bed,


bottoms and sides of excavations with approved
ant-termite as described 202 m2 2.50 505.00

B Excavating vegetable soil average depth 150mm


and dispose offsite 60 m² 0.72 43.20
-
C Excavating foundation trenches starting from reduced level -
and depth not exceeding 1.50m 33 m³ 3.60 118.80
-
D Extra over for excavating in hard rock as described 3 m³ 20.00 66.00
-
E Backfilling around foundations with excavated material 25 m³ 12.00 300.00
-
F Disposal of excavated material off site 8 m³ 12.00 96.00
-
G Levelling and compacting bottoms of excavations 37 m2 2.40 88.80
-
H 300mm thick hardcore filling laid level, well watered, -
roll compacted and consolidated in layers of 100mm thick -
to 98 percent of modified AASHTO density as described 52 m2 12.00 624.00
-
J Keep all excavations free from general water 1 Item 200.00 200.00
-
K Provide all necessary planking and strutting to faces -
of excavations as described 1 Item 200.00 200.00
-

To collection 2,241.80

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE (All PROVISIONAL)

3/23
CHANGE ROOM AND GUARD HOUSE

Plain In-situ Concrete Grade C12 as described

A 50mm thick Blinding in foundation trenches 2 m³ 123.00 246.00

Reinforced In-situ Concrete Grade C25 as described

B Foundation Footing 7 m³ 135.00

C 100mm thick Floor Bed 52 m2 135.00 7,020.00


-
D 100mm thick Ramps 2 m2 135.00 270.00
-
E Column stub 1 m³ 20.25 20.25
-
High yield steel deformed bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWG annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
D 10mm diameter Bar 15 kg 1.80 27.00
-
High yield steel round bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWG annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
E 6mm diameter Bar 26 kg 1.80 46.80
-

To collection 7,630.05

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE (All PROVISIONAL)

3/24
CHANGE ROOM AND GUARD HOUSE

A Conforce mesh No. '86' fabric reinforcement with


150mm side and end laps including all necessary
tying wire and distance blocks (measured net no
allowance made for laps) 54 m² 4.20 226.80

Sawn formwork to reinforced in-situ concrete as described


-
B To edges of Floor Bed and Ramp not exceeding 100mm high 42 m 3.00 126.00
-
C To sides of Column Stub 3 m² 30.00 90.00
-
D 500 Gauge 2ply polythene Damp Proof Membrane laid -
on blinded hardcore with 150mm side and end laps -
with approved adhesive tape both sides -
(no allowance made for laps) 54 m² 30.00 1,620.00
-
Precast Concrete hollow Blocks type A (5.0N/mm2) -
filled solid with plain in-situ concrete Grade C15 bedded -
in cement and sand (1:4) mortar as described -
-
E 200mm walls 56 m² 30.00 1,680.00
-
Brick force laid horizontally every second course as -
described -
-
F 200mm wide (no allowance made for laps) 125 m 0.60 75.00
-
18mm cement and sand (1:4) plaster with wood float finish -
as described on: -
-
G Plinth of concrete blockwork and concrete floor bed 12 m² 30.00 360.00
-
H Prepare and apply three coats malfold Bituminous damp -
proofing Paint as described on plastered walls 12 m² 30.00 360.00
-

To collection 4,537.80

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUBSTRUCTURE (All PROVISIONAL)

COLLECTION

3/25
CHANGE ROOM AND GUARD HOUSE

Page No 3/1 2,241.80

Page No 3/2 7,630.05

Page No 3/3 4,537.80

Page No 3/4

SUBSTRUCTURE -
TOTAL CARRIED TO SUMMARY 14,409.65

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

CONCRETE WORK

Reinforced in-situ Concrete Grade C25 as described

3/26
CHANGE ROOM AND GUARD HOUSE

A Ring Beam and Lintols 3 m3 135.00 405.00


-
B Roof Pads 1 m3 135.00 135.00
-
C 100mm thick worktop to receive cemcrete top -
(Measured Separately) 4 m2 13.50 54.00
-
D 250 x 75mm Precast Window Cill throated once and fixed on -
top of wall 10 m 2.00 20.00
-
Sawn formwork to reinforced in-situ concrete as described -
-
E Sides and soffits of Ring Beam and Lintols 25 m2 13.50 337.50
-
F Sides of Roof Pads 3 m2 13.50 40.50
-
G Sides of Concrete Worktop not exceeding 100mm high 5 m 2.00 10.00
-
H Soffits of Concrete Worktop 5 m2 13.50 67.50
-
High yield steel deformed bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWG annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
J 12mm diameter Bar 220 kg 1.80 396.00
-
High yield steel round bar reinforcement as described -
including all cutting bending; hooking and cranking -
assembly etc. in accordance with drawings and wiring -
including No. 16 SWG annealed iron bending wire and -
hoisting and lowering and fixing in position -
-
K 8mm diameter Bar 100 kg 1.80 180.00

CONCRETE WORK - TOTAL


CARRIED TO SUMMARY 1,645.50

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

BLOCKWORK AND BRICKWORK

Precast Concrete hollow block Type 'A' (2.5N/mm2)


bedded in cement and sand (1:4) mortar as described

3/27
CHANGE ROOM AND GUARD HOUSE

A 100mm thick wall 20 m2 10.00 200.00


-
B 150mm thick wall 50 m2 15.00 750.00
-
C 200mm thick wall 150 m2 20.00 3,000.00
-
Brickforce laid horizontally every third course as described -
-
D 100mm wide brickforce (No allowance made for laps) 30 m 0.75 22.50
-
E 150mm wide brickforce (No allowance made for laps) 90 m 0.75 67.50
-
E 200mm wide brickforce (No allowance made for laps) 276 m 0.75 207.00
-
Polyshield Heavy Duty damp proof course as described -
bedded and pointed in cement and sand (1:4) mortar -
lapped 75mm in the running length and the full width at -
angles -
-
F 100mm wide (No allowance made for laps) 10 m 0.50 5.00
-
G 150mm wide (No allowance made for laps) 20 m 0.50 10.00
-
H 200mm wide (No allowance made for laps) 40 m 0.50 20.00
-
J 200 x 200mm Precast Concrete Air Bricks finished -
flush with plaster both externally and internally 22 nr 4.00 88.00
-
BLOCKWORK AND BRICKWORK - TOTAL
CARRIED TO SUMMARY 4,370.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

ROOFING

0.5mm thick Chromadek pre-coated IBR corrugate galvanised


steel roofing sheets with approved end and side lapping fixed
accordance with manufacturers recommendations as described

3/28
CHANGE ROOM AND GUARD HOUSE

A Roof sheets fixed to Lipped Channels


(measured seperately) with self tapping screws 72 m2 19.50 1,404.00

ROOF - TOTAL
CARRIED TO SUMMARY 1,404.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

CARPENTRY,JOINERY AND IRONMONGERY

44mm internal quality Rosewood door with engravings


suitable for varnishing fixed to pressed steel frame
(Measured Seperately)

3/29
CHANGE ROOM AND GUARD HOUSE

A Door size 725 x 1960mm 6 nr 225.00 1,350.00


-
B Purpose made Door size 1125 x 1960mm 1 nr 300.00 300.00
-
44mm external quality Rosewood door with engravings -
suitable for varnishing fixed to pressed steel frame -
(Measured Seperately) -
-
C Door size 825 x 1960mm 3 nr 225.00 675.00
-
IRONMONGERY -
-
Rates for locks are to include for providing each lock with a -
pair of keys. Each key is to have an approved plastic or -
metal tag with the name of the room or other necesasry -
identification indelibly printed thereon and attached to the -
key with a split steel ring -
-
D Indicator bolt lock complete with "Vacant" and "Occupied" -
engravings as "Union" or equal and approved 7 nr 50.00 350.00
-
E Three lever QS "COUPE' NAMSOS locks fixed to -
rosewood doors 3 nr 50.00 150.00
-
F Three lever QS 8535 locks, complete with QS 2701 BTB -
MTRED T' handles fixed to rosewood doors 4 nr 50.00 200.00
-
G Male Sex Symbol, 76mm diameter fixed to Rosewood doors 1 nr 15.00 15.00
-
H Female Sex Symbol, 76mm diameter, fixed to Rosewood door 1 nr 15.00 15.00
-
J Guard Symbol, 76mm diameter, fixed to Rosewood doors 1 nr 15.00 15.00

To Collection 3,070.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

CARPENTRY,JOINERY AND IRONMONGERY

A 25mm diameter Chromuim Plated toilet flip-up grab bar,


1600mm long fixed to concrete blockwork 3 nr 75.00 225.00
-
B 25mm diameter Chromuim Plated toilet flip-up grab bar, -
1200mm long fixed to concrete blockwork 3 nr 50.00 150.00

3/30
CHANGE ROOM AND GUARD HOUSE

-
C 25mm diameter Chromuim Plated toilet flip-up grab bar, -
750mm long fixed to concrete blockwork 3 nr 50.00 150.00

D Stainless Steel "Franke" heavy duty wall mounted double


Toilet Roll Holder with spindle system, stainless steel,
surface to be satin finished, front with Inoxplus surface
refinement, material thickness 2.0mm 14 gauge, curved
front cover, cylinder lock with "Franke" Standard key, for
2 toilet rolls with max diameter 120mm, reserve roll not
visible, fixed with stainless steel screws and dowels
overal size 156x303x141mm fixed to the wall 3 nr 75.00 225.00
-
E Soap Dispenser Unit of approved model 5 nr 30.00 150.00
-
F 38mm diameter Rubber Door Stop plugged and screwed -
to floor 10 nr 5.00 50.00

To Collection 950.00

COLLECTION

Page No 3/9 3,070.00

Page No 3/10 950.00

CARPENTRY,JOINERY AND IRONMONGERY -


TOTAL CARRED TO SUMMARY 4,020.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

STRUCTURAL STEELWORK

Preamble

(i) All steel to be Grade 43

(ii) Steelwork should be prefabricated in selections by an


approved Steel Fabricator

3/31
CHANGE ROOM AND GUARD HOUSE

(iii) All welds to be 6mm minimum fillet welds unless


otherwise

The following in Cold Formed Lipped Channels shop primed


before delivery including hoisting, jointing, welding and
mounting in position, embeded in Concrete Roof Pads
as described

A 100 x 50 x 20 x 2.0mm Cold Formed Lipped Channels 86 m 9.00 774.00

B 50 x 50 x 3 Equal Angle 44 m 8.00 352.00


-
C 60 x 60 x 3 Equal Angle 62 m 7.00 434.00

STRUCTURAL STEELWORK - TOTAL CARRIED TO


SUMMARY 1,560.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

METAL WORK

ZAM 100 Single rebated pressed steel door frame


as manufactured by Zambezi Steel Limited, or other equal
and approved supplier including one pair of butt hinge welded
on adjustable striker plate rubber buffers primed with
one coat of red oxide before delivery

A Type 2.0M nominal size 1200 x 2000mm 1 nr 187.00 187.00

3/32
CHANGE ROOM AND GUARD HOUSE

-
B Type 2.0M nominal size 800 x 2000mm 3 nr 97.00 291.00
-
C Type 1.5M nominal size 1000 x 2000mm 3 nr 97.00 291.00
-
D Type 1M nominal size 800 x 2000mm 2 nr 75.00 150.00
-
Aluminum windows in Nuklip casement systems anodised -
complete with all required ironmongery,operating,gear, 6.38mm -
thick glazing and glazing beads all round and fixing to curtain -
wall frame,including cutting and pinning lugs supports as -
described -
-
WINDOWS -
-
E Window type W1 overall size 2200 x 1000mm 1 nr 360.00 360.00
-
F Window type W2 overall size 900 x 1000mm 2 nr 180.00 360.00
-
G Window type W3 overall size 600 x 600mm 6 nr 90.00 540.00
-
H Window type W4 overall size 1200 x 600mm 2 nr 180.00 360.00

METAL WORK - TOTAL


CARRIED TO SUMMARY 2,539.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

Gutters

A 150mm diameter half round PVC Gutter fixed to Eaves with


PVC Clumps at 1500mm centre to centre 14 m 25.00 350.00
-
UPVC rain water down pipes fixed to structural steel as -
described -
-

3/33
CHANGE ROOM AND GUARD HOUSE

B 100mm diameter Rain Water Down Pipe 7 m 35.00 245.00


-
C Extra over 100mm Rain Water Down Pipe for 100mm -
diameter Horse Shoe 2 nr 30.00 60.00
-
D Extra over 100mm Rain Water Down Pipe for 100mm -
diameter PVC Grating Down Pipe inlet 2 nr 30.00 60.00
-
E Extra over 100mm Rain Water Down Pipe for Swan Neck 2 nr 30.00 60.00
-
Sanitary Installation -
-
UPVC pipes, fittings, jointing and fixing as described -
-
F 100mm diameter Vent pipe fixed to blockwork with holder -
bats, cut and pinned 8 m 25.00 200.00
-
G Extra over 100mm diameter pipe for Bend with bolted -
Inspection Cover 11 nr 20.00 220.00
-
H Extra over 100mm diameter pipe for Pan Connector and -
joint to water closet outlet 11 nr 20.00 220.00
-
J Extra over 100mm diameter pipe for Gully Trap 3 nr 20.00 60.00
-
K Extra over 100mm diameter pipe for plain Bend 11 nr 20.00 220.00
-
L Vent valve to suit 100mm Vent Pipe 3 nr 20.00 60.00

To Collection 1,755.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

Sanitary Installation

UPVC pipes, fittings, jointing and fixing as described

A 32mm diameter waste pipe fixed to wall with holder bats,cut


and pinned 4 m 10.00 40.00
-
B 38mm diameter waste pipe fixed to blockwork with holder -

3/34
CHANGE ROOM AND GUARD HOUSE

bats, cut and pinned 10 m 10.00 100.00


-
C Extra over 32mm diameter pipe for Inspection Bend 4 nr 4.00 16.00
-
D Extra over 32mm diameter waste pipe for Plain Bend 2 nr 4.00 8.00
-
E Extra over 32mm diameter Cross Tee waste pipe 2 nr 4.00 8.00
-
F Extra over 32mm diameter Plain Tee waste pipe 2 nr -
-
G Extra over 38mm diameter waste pipe for Equal Tee 6 nr 4.00 24.00
-
H Extra over 38 diameter waste pipe for Bend with Inspection 3 nr 4.00 12.00
-
J Extra over 38 diameter waste pipe for 38mm diameter Plain -
Bend 6 nr 4.00 24.00
-
Rubber Fittings as described -
-
K P' trap, 32mm inlet, 32mm outlet 8 nr 4.00 32.00
-
L P' trap, 38mm inlet, 38mm outlet 6 nr 4.00 24.00
-
M S' trap, 38mm inlet, 38mm outlet 5 nr 4.00 20.00
-
N S' trap, 50mm inlet, 50mm outlet 5 nr 4.00 20.00
-
Supply and fix the following sanitary fittings including -
assembling forming all joints and connections in -
accordance with the manufacturer's instructions, building -
in cutting pinning or plugging and screwing to walls/floors -
making good as described -
-
P 900 x 900mm gloss enamelled Shower Tray complete -
with 38mm shower trap, shower mixer including riser and -
shower rose the whole mounted to floor and wall 3 nr 4.00 12.00

To collection 340.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

Sanitary Fittings

Supply and fix the following sanitary fittings including


assembling forming all joints and connections in
accordance with the manufacturer's instructions, building
in cutting pinning or plugging and screwing to walls/floors
making good as described

A "Vaal" or other equal and approved white sanitary ware

3/35
CHANGE ROOM AND GUARD HOUSE

vitreous china low level wash down Water Closet Suite


reference No. V243 to BS3402 comprising V1214 wash
down water closet 'with orchid back inlet, concealed
bottom outlet at back with vent, "Hibiscus" duct cistern
with side supply and over flow, with lid, fitments, push
button mechanism, duct flush pipe, Orchid back inlet,
with side supply and over flow; 5328 Armithene water
waste preventing "freeflo" plastic syphon fitting with 13mm
side supply ball valve, 19mm side overflow, flush bend, 811
simple inlet connection and concealed seat and cover,
plugged and screwed to wall and floor. 3 nr 533.00 1,599.00
-
B "Vaal" or other equal and approved white sanitary ware -
vitreous china ceramic fire clay Wash Hand Basin "Cameo" -
product code: 7028 overall size 595 x 455mm, oval self -
rimming vanity basin with three semi punched tap holes -
and chainstay hole through the center complete with -
overflow, complete with 32mm chromium plated wash -
hand basin mixer, including concealed cast iron brackets -
plugged and screwed to wall, complete with pedestal 3 nr 370.00 1,110.00
-
C Vaal" or other equal and approved white sanitary ware -
vitreous china wall hung bowl Lavatera" Urinal with top inlet, -
product code 705426 or back inlet code 705427, overal -
size 600 x 385 x 280mm complete with spreaders, -
flush pipe, 38mm domical grating, 20mm diameter thread -
bowl, fixing bowl cistern and pipe with concealed brackets -
to masonry with screws 1 nr 370.00 370.00
-
D "Vaal" or other equal and approved white Shower tray with -
38mm shower mixer including riser and shower -
rose as described 1 nr 300.00 300.00

To Collection 3,379.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

A 100x100mm "ROFO" or other equal and approved stainless


steel floor drain with 50mm diameter outlet laid flush on
Terrazo floor finish 5 nr 100.00 500.00
-
Hot and Cold Water Installation -
-
Polypropylene Random Copolymer (PPR) Pipes including -
fittings, jointing and fixing as described -
-

3/36
CHANGE ROOM AND GUARD HOUSE

B 13mm diameter pipe fixed to blockwork with holder bats, -


cut and pinned 8 m 10.00 80.00
-
C 19mm diameter pipe fixed to blockwork with holder bats, -
and pinned 10 m 10.00 100.00
-
C 25mm diameter pipe fixed to blockwork with holder bats, cut -
and 'pinned 6 m 15.00 90.00
-
'Extra over Polypropelene Random Copolymer (PPR) pipes -
for the following fittings -
-
D 13mm Bend 4 nr 4.00 16.00
-
E 19mm Bend 2 nr 4.00 8.00
-
F 25mm Bend 6 nr 4.00 24.00
-
E 19mm diameter Socket 2 nr 4.00 8.00
-
F 25 x 13mm diameter Reducing Bend 5 nr 4.00 20.00
-
F 25 x 19mm diameter Reducing Bend 4 nr 4.00 16.00
-
G 25 x 25 x 13mm diameter Reducing Tee 12 nr 4.00 48.00
-
G 25 x 25 x 19mm diameter Reducing Tee 6 nr 4.00 24.00
-
Steel braided fittings, jointed and fixed as described -
-
H 13mm diameter steel braided connector 1000mm long,bend -
as required with one end jointed to PPR pipe, cistern or -
taps 39 nr -

To Collection 934.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PLUMBING INSTALLATIONS

Supply and fix the following valves obtained from


approved manufacturers, including jointing to pipes as
described

A 19mm PPR 'Leso' Ball Valves 10 nr 30.00 300.00


-
B 13mm chromium plated angle valves 32 nr 35.00 1,120.00
-
Fire Services -
-

3/37
CHANGE ROOM AND GUARD HOUSE

C 9kg dry powder Fire Extingusher complete with 'hose with -


squeeze grip, nozzle and recharge warning indicator and -
fix on and including bracket plugged and screwd to wall 1 nr 140.00 140.00
-
D Allow for testing the complete plumbing installation as -
described 1 item 20.00 20.00
-
E Allow for sterilisation of all pipe work and storage vessels -
as described 1 item 100.00 100.00
-
Builders work in connection with plumbing -
installation -
-
F Hole through 150mm thick blockwork for large pipes and -
make good disturbed works 11 nr 10.00 110.00
-
G Hole through 150mm thick blockwork for small pipes and -
make good disturbed works 43 nr 10.00 430.00

2,220.00
COLLECTION

Page No 3/13 1,755.00

Page No 3/14 340.00

Page No 3/15 3,379.00

Page No 3/16 934.00

Page No 3/17 2,220.00

PLUMBING INSTALLATION - TOTAL


CARRIED TO SUMMARY 8,628.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Preambles

The Contractor is deemed to have included in his


rates for the following;-

i Cutting or forming holes, chases and other


general wwork required including making good
finishings and other works disturbed

ii Constant supervision by a supervisor

3/38
CHANGE ROOM AND GUARD HOUSE

possessing approved qualifications

iii Protection of installation until handed over our for


taking requisite precautions to protect workmen
and the public from electric shocks or burns

iv Comply with all necessary by laws and rules


with which the installation shall be required
to comply

v Allow for bonding all roofs, water pipes, waste


pipes, sinks etc

vi All services are to be sub - contracted to


specialised service, providers as per relevant
National Council for construction category

To Collection 300.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Distribution Board
Supply, Install and Connect all Conduits, Conduit Fittings,
Cables, Cable Connections and Chiselling from
Meter Box to Distribution Board
A Flush mounted Distribution Boards (DB1) labelled 6 way
SP & N free standing with all accessories which shall include:

1No. 60A SP MCB (Incoming)


1No. 40A SP MCB
1No. 30A SP MCB
2No. 10A SP MCB
2No. Spares
Neutral Bar

3/39
CHANGE ROOM AND GUARD HOUSE

TP Bus-bars
Inspection Box
1000x1000mm Earth mat
Surge protector
Inspection box
Earthing rods 1 nr 1,200.00 1,200.00
B Flush mounted Distribution Boards (DB2) labelled 6 way
SP & N free standing with all accessories which shall include:

1No. 40A 2P Direct Current MCB


2No. 10A 2P Direct Current MCB
1No. 65kA 2P Direct Current Surge protection device
2No. Spares
Inspection box 1 nr 500.00 500.00

C Solis Mini 4G series inverter or other equal and


approved brand with the following
ratings:-
Capacity : 700W
AC Voltage out put : 230 V
DC Voltage input : 12V
Output frequency : 50 Hz I 0.05%
Out put wave form: Pure sine wave including
Overload protection
Overvoltage protection
protection function: Overload
: Overcharge
: Low battery Voltage
: High frequency
(These stop constant current , constant voltage
and float charging) 1 No. 500.00 500.00
2,200.00
To Collection

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Supply, install and connect all conduits, conduit fittings,


UV solar PV cables, battery cables, flexi cables and
cable connections from the Solar Panels to
Distribution Board to supply points, connected
conduit installations, switches and light fittings
(measured separately)

A 1005 x 670 x 35mm monocrystalline Solar panel module


330W PV array, 22V, 7.06A Isc with 14.8% efficiency
complete with roof mounting structure, PV Connectors
and all necessary accessories 4 nr 350.00 1,400.00

B 12 V - 200AH Lithium Ion Drop in battery with D.O.D

3/40
CHANGE ROOM AND GUARD HOUSE

18% and 90% efficiency complete with battery rack


cabinet and all other necesarry accessories 4 nr 495.00 1,980.00

C 50V, 60A Maximum Power Point Tracking (MPPT) charge contr 1 nr 130.00 130.00

D 10A, 250V 2P direct current (DC) (PV) isolater as Legrand


or equal and approved 2 nr 50.00 100.00

Supply, install and connect all conduits, conduit fittings,


cables and cable connections from Distribution Board to
supply points, connected conduit installations, switches and
light fittings (measured separately)

E Single surface mounted light point on one gang one way


switch 12 nr 27.00 324.00

F Single surface mounted light point on two gang one way


switch 9 nr 22.00 198.00

To Collection 4,132.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOLAR ELECTRICAL INSTALLATION

Supply, install and connect the following light fittings, fixing in


accordance with manufacturers' instructions; Philips range
or other equal and approved

A 1x20W LED 1250mm long ceiling mounted, complete with


tri proof milk frosted cover and all necessary accessories 12 nr 75.00 900.00
-
B 1 x 18W, outdoor LED surface mounted fluorescent light -
fitting complete with all accessories 9 nr 65.00 585.00
-
Flush mounted 'LEGRAND' or other equal and approved -
light switches -
-
C 10A, 250V, 50Hz single phase one gang, one way switch 8 nr 22.00 176.00

3/41
CHANGE ROOM AND GUARD HOUSE

-
D 10A, 250V, 50Hz single phase two gang, one way switch 1 nr 22.00 22.00
-
E Allow for provision of safe house item 100 300.00
-
F 250V/50Hz Photo cell as "PHILIPS" or equal and -
approved make 1 nr 25.00 25.00

To Collection 2,008.00

COLLECTION

Page 3/18 300.00

Page 3/19 2,200.00

Page 3/20 4,132.00

Page 3/21 2,008.00

SOLAR ELECTRICAL INSTALLATION - TOTAL


CARRIED TO SUMMARY 8,640.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

FLOOR, WALL AND CEILING FINISHINGS

Cement and sand (1:3) screed finished to receive Terrazo


floor (measured seperately) as described

A 30mm thick Floor Screed 52 m² 6.60 343.20


-
Terrazo paving comprising water repellant cement tinted grey -
and white marble chippings (1:2) laid on cement and sand -
screed (measured seperately) complete with dividers -
-
B 25mm Paving to floor screed (measured seperately) 48 m2 36.00 1,728.00
-
C 100mm thick x 10mm high Terrazo skirting 112 m 3.60 403.20
-
D 30mm thick polished paving laid on ramps 4 m2 36.00 144.00
-

3/42
CHANGE ROOM AND GUARD HOUSE

Cemcrete polished concrete slab (measured separately) -


-
E 30mm thick polished Cemcrete Finish as worktops 5 m2 36.00 180.00
-
15mm cement and sand (1:4) plaster backing to receive tiles -
internally as described on: -
-
F Blockwork 155 m2 6.60 1,023.00
-
G To returns and reveals, girth not exceeding 100mm 12 m 1.00 12.00
-
15mm cement and sand (1:4) plaster with steel trowel -
finish internally as described on: -
-
H Blockwork 40 m2 6.60 264.00
-
J To returns and reveals, girth not exceeding 100mm 10 m 1.00 10.00

To Collection 4,107.40

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

FLOOR, WALL AND CEILING FINISHINGS

18mm cement and sand (1:4) plaster with wood float finish
externally as described on:

A Blockwork 102 m2 6.60 673.20


-
B To returns and reveals, girth not exceeding 100mm 22 m 1.00 22.00
-
Full bodied polished ceramic wall tiles fixed with approved -
adhesive to plastered wall backing and pointed in white -
cement as described -
-
C 600 x 300 x 10mm thick 155 m2 6.60 1,023.00
-
D To returns and reveals, girth not exceeding 100mm 12 m 1.00 12.00

3/43
CHANGE ROOM AND GUARD HOUSE

To Collection 1,730.20

COLLECTION

Page No 3/22 4,107.40

Page No 3/23 1,730.20

FLOOR, WALL AND CEILING


FINISHINGS SUMMARY 5,837.60

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

GLAZING

Glazing to metal with putty as described

BS152 clear float mirror, SG silvered and protected with


copper backing, undercoat paint and stoved enamel 6mm
thick polished, fixing to walls with chromuim plated,
domical covers rubber sleeves and washers

A Size 600 x 800mm 4 nr 10.00 40.00

GLAZING - TOTAL
CARRIED TO SUMMARY 40.00

3/44
CHANGE ROOM AND GUARD HOUSE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

PAINTING

Painting - Externally

Prepare and apply Plascon "MARROCCA TEXTURE" paint


to manufacturer's specifications to the following surfaces

A To plastered walls 102 m2 6.20 632.40


-
B To returns and reveals, girth not exceeding 100mm 22 m 1.00 22.00
-
Painting - Internally -
-
Prepare and apply one undercoat and two coats of -
gloss paint Internally as described -
-
C To plastered walls 80 m2 6.20 496.00
-
D To returns and reveals, girth not exceeding 100mm 10 m 1.00 10.00
-

3/45
CHANGE ROOM AND GUARD HOUSE

E To flush doors 36 m2 6.20 223.20


-
Touch up primer and apply one undercoat and two gloss -
finish to surfaces as described as Plascon or -
equal and approved -
-
F To steel primed structural members girth exceeding 100mm 192 m 1.00 192.00
but not exceeding 200mm -
-
G To steel primed door frames girth exceeding 200mm -
but not exceeding 300mm 48 m 1.00 48.00
-
H To steel primed window frames 20 m2 6.20 124.00

PAINTING AND DECORATING


CARRIED TO SUMMARY 1,747.60

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUMMARY PAGE

SUBSTRUCTURE 3/5 14,409.65

CONCRETE WORK 3/6 1,645.50

BRICKWORK AND BLOCKWORK 3/7 4,370.00

ROOFING 3/8 1,404.00

CARPENTRY, JOINERY & IRONMONGREY 3/10 4,020.00

STRUCTURAL STEELWORK 3/11 1,560.00

METAL WORK 3/12 2,539.00

PLUMBING INSTALLATION 3/17 8,628.00

SOLAR ELECTRICAL INSTALLATION 3/22 8,640.00

FLOOR, WALL AND CEILING FINISHINGS 3/23 5,837.60

3/46
CHANGE ROOM AND GUARD HOUSE

GLAZING 3/24 40.00

PAINTING AND DECORATIONS 3/25 1,747.60

GUARD HOUSE AND ABLUTION BLOCK -


TOTAL CARRIED TO GENERAL SUMMARY 54,841.35

3/47
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

DRAINAGE - (ALL PROVISIONAL)

Note: The Contractor's attention is drawn particulary


to Bill Nr 2 and specifications which contain, in addition
of further items, preambles descriptions of materials
and workmanship, further information that will
considerably affect his/her rates for the measured works,
and it is most important that he/she reads and fully
acquaints himself/herself (and his/her Sub-Contractors
and Suppliers) with all the information and requirements
that are contained therein.

4/48
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOIL DRAINAGE (ALL PROVISIONAL)

A Excavating trenches not exceeding 1.50m deep and


average depth of 600mm starting from existing ground level
to receive pipes not exceeding, 150mm diameter including
grading bottoms, earthwork supports backfilling with
excavated material and disposing of surplus excavated
material off site 15 m 1.00 15.00

B Excavating trenches not exceeding 1.50m deep and


average depth of 600mm starting from existing ground level
to receive pipes not exceeding, 200mm diameter including
grading bottoms, earthwork supports backfilling with
excavated material and disposing of surplus excavated
material off site 10 m 1.00 10.00

C Extra over for excavating in hard rock 2 m³ 20.00 40.00


-
D 75mm thick compacted bed of selected Gravel to -
pipes in trenches including additional excavations 25 m 2.00 50.00
-
E Plain in-situ concrete Grade C20 around 100mm diameter -
drain pipe in trenches including additional excavation and -
any necessary formwork 2 m³ 3.60 7.20
-
F 110mm diameter UPVC Pipes as described Pipe including -
laying and jointing in trenches 15 m 1.00 15.00
-
G 160mm diameter UPVC Pipes as described Pipe including -
laying and jointing in trenches 10 m 1.00 10.00

To Collection 147.20

4/49
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOIL DRAINAGE (ALL PROVISIONAL)

A 450 x 450mm PVC Gully Trap with 280mm


diameter vertical bulk inlet, 250mm diameter P-trap outlet
and 350 x 350mm grating including jointing to drain and
setting in around plain insitu concrete Grade C20 and all
necessary fittings and all necessary excavation and
formwork 5 nr 10.00 50.00

The following in 8No. Manholes:

B Excavating Pit starting from existing ground level


and depth not exceeding 1.50m 17 m³ 3.60 61.20
-
C Extra over for excavating in hard rock 2 m³ 20.00 34.00
-
D Backfilling with excavated material 2 m³ 12.00 24.00
-
E Disposal of excavated material off site 15 m³ 12.00 180.00
-
F Levelling and compacting bottoms of excavations 12 m² 2.40 28.80
-
G Keep all excavations free from general water 1 Item 300.00 300.00
-
H Provide all necessary planking and strutting to faces of -
excavations as described 1 Item 300.00 300.00
-
Plain in-situ concrete Grade C20 as described -
-
J 100mm thick concrete to bottoms of manholes 12 m² 12.00 144.00
-
K 200mm (average) thick Benching to bottoms of manhole -
size 900 x 900mm finished to steep falls and rendered in -
cement and sand (1:3) screed trowelled hard and -
smooth including making good to main and branch -
channels 8 nr 150.00 1,200.00
-
Reinforced in-situ concrete Grade C25 as described -
-
L 150mm thick Slab 12 m² 20.25 243.00
-
M 12mm diameter round mild steel reinforcement Bars 11 kg 1.80 19.80
-
N Sawn formwork to Soffit of Slabs 12 m² 30.00 360.00
` -

To Collection 2,944.80

4/50
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOIL DRAINAGE (ALL PROVISIONAL)

The following in 8No. Manholes:

A Sawn formwork to edges of slabs, depth not


exceeding 100mm 38 m 3.00 114.00
-
B Form hole in 150mm thick reinforcement in-situ -
concrete slabs for 457 x 610mm manhole -
cover (measured elsewhere) 8 nr 50.00 400.00
-
Precast concrete hollow blocks type A (5.0Nmm²) -
as described filled solid with plain in-situ concrete -
Grade C20 bedded in cement and sand (1:3) mortar -
-
C 150mm thick wall 28 m² 20.00 560.00
-
D Build in end of soil pipe to 150mm thick wall of manhole -
and make good 8 nr 30.00 240.00
-
E 457 x 610mm single seal Cast Iron Inspection Cover and -
Frame complying with BS 497 including bedding and -
flauching frame on top of half brick kerb and sealing cover -
in grease and sand 8 nr 50.00 400.00
-
15mm cement and sand (1:3) plaster with wood float -
finish as described -
-
F Concrete Blockwork walls and edges of concrete slabs 30 m² 28.80 864.00
-

To collection 2,578.00

4/51
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOIL DRAINAGE (All PROVISIONAL)

The following in 1No. Septic Tank:

A Excavating Pit not exceeding 1.5m deep commencing at


ground level 36 m³ 0.50 18.00
-
B Excavating Pit exceeding 1.5m deep but not exceeding -
3.0m 27 m³ 3.60 97.20
-
C Extra over for excavating in hard rock 3 m³ 20.00 60.00
-
D Backfilling with excavated material 12 m³ 12.00 144.00
-
E Disposal of surplus excavated material off site 51 m³ 12.00 612.00
-
F 150mm thick Reinforced Concrete Grade C25 Base 17 m² 13.50 229.50
-
G Layer of Conforce 86 or other equal and approved fabric -
Reinforcement as described 17 m² 13.50 229.50
-
H 200mm thick Solid concrete blockwork bedded in cement -
and sand (1:4) mortar 33 m² 13.50 445.50
-
J 150mm thick Reinforced Concrete Grade C25 cover Slab 11 m² 13.50 148.50
-
K Mild steel reinforcement of various diameters in -
suspended slab (measured separately) 71 Kg 1.80 127.80
-
L Sawn formwork to edge of Slab exceeding 100mm but not -
exceeding 200mm high 23 m 3.00 69.00
-
M Sawn formwork to soffits of cover Slab 17 m² 30.00 510.00
-
N Boxing out rebated hole size 457 x 610mm -
including all formwork 2 Nr 50.00 100.00
-
P 457 x 610mm size single seal Cast Iron heavy duty -

4/52
DRAINAGE

Manhole Cover and Frame including bedding and sealing -


cover in Grease and Sand 2 Nr 75.00 150.00

To Collection 2,941.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SOIL DRAINAGE (All PROVISIONAL)

The following in 1No. Septic Tank:

A One coat cement and sand (1:4) rendering to


brick walls trowelled smooth 33 m² 30.00 990.00
-
B 100mm diameter PVC pipe inlet and outlet Tee Junction -
with one end embedded in 200mm wall including hole -
through 200mm wall 2 Nr 30.00 60.00
-
The following in 1No. Soakaway: -
-
C Excavating Pit not exceeding 1.5m deep commencing at -
ground level 18 m³ 20.00 360.00
-
D Excavating Pit exceeding 1.5m deep but not -
exceeding 3.0m 18 m³ 20.00 360.00
-
E Extra over for excavating in hard rock 5 m³ 20.00 100.00
-
F Backfilling with excavated material 10 m³ 20.00 200.00
-
G Disposal of surplus excavated material off site 26 m³ 20.00 520.00
-
H 200mm thick solid concrete blockwork bedded in cement 4 m² 2.00 8.00
and sand (1:4) mortar -
-
J Ditto honey comb ditto 14 m² 2.00 28.00
-
K 150mm Insitu Concrete Bed Grade C20 2 m² 2.00 4.00
-
L 150mm thick Reinforced Insitu Concrete Slab Grade C20 2 m² 2.00 4.00
-
M Reinforcement bars of various sizes as described 32 Kg 1.80 57.60
-
N Sawn formwork to Soffit of Slab 1 m² 30.00 30.00
-
P Sawn formwork to edge of slab 150mm deep 8 m 3.00 24.00

4/53
DRAINAGE

-
Q Boxing out 457 x 610mm size rebated hole through -
150mm reinforced concrete slab including any formwork 1 Nr 100.00 100.00

To Collection 2,845.60

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

The following in 1No. Soakaway:

A Form 150mm hole through 200mm blockwork 1 Nr 100.00 100.00


-
B Fill Soakaway with Stone of various sizes -
up to the level as directed by Project Manager 11 m³ 75.00 825.00
-
C 457 x 610mm Cast Iron Heavy Duty Manhole Cover with -
Frame placed and sealed 1 Nr 75.00 75.00
-
D Layer of polyptopolene woven sheeting laid on top of rocks 5 m² 15.00 75.00
-
Generally -
-
E Include for testing the whole of the drainage -
system by means of water pressure test -
to the complete satification of the Director of Public -
Infrastructure and Local Authority for making -
good any work nor approved at the Contractor' -
s expense and for re-testing and making -
good any work nor approved at the Contractor' 1 item 300.00 300.00

To Collection 1,375.00

COLLECTION

Page No. 4/2 147.20

Page No. 4/3 2,944.80

Page No. 4/4 2,578.00

Page No. 4/5 2,941.00

Page No. 4/6 2,845.60

Page No. 4/7 1,375.00

4/54
DRAINAGE

SOIL DRAINAGE - TOTAL


CARRIED TO SUMMARY 12,831.60

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

STORM WATER DRAINAGE (ALL PROVISIONAL)

Three brick spoon drain

A Excavating 150mm deep to remove top soil and


disposal off site 30 m² 2.00 60.00

B Levelling, compacting and blinding bottoms of -


excavations with 50mm thick sand as described 30 m² 2.00 60.00
-
C Selected Common Clay Bricks set in Cement and Sand -
(1:3) mortar with flush pointed joint, the three brick -
spoon drain to be positioned correctly in relation to -
drip from the roof rim and have run - off minimum -
1:60 include for 100mm thick concrete base Grade C20 -
backfill of excavated material at surface to match 51 m 2.00 102.00
existing Terrain levels -
-
Apron and Paving -
-
D Apron in 600 x 600 x 50mm thick Precast Concrete -
Pavings laid to slopes all round 51 m 20.00 1,020.00
-
Generally
-
E Include for connecting spoon drain to existing storm -
water drainage system and make good to all works -
disturbed 1 Item 500.00 500.00
STORM WATER DRAINAGE
TOTAL CARRIED TO SUMMARY 1,742.00

4/55
DRAINAGE

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUMMARY PAGE

SOIL DRAINAGE 4/7 12,831.60

STORM WATER DRAINAGE 4/8 1,742.00

DRAINAGE -
TOTAL CARRIED TO GENERAL SUMMARY 14,573.60

4/56
DRAINAGE

4/57
EXTERNAL WORKS

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

EXTERNAL WORKS - (ALL PROVISIONAL)

Note: The Contractor's attention is drawn particulary


to Bill Nr 2 and specifications which contain, in addition
of further items, preambles descriptions of materials
and workmanship, further information that will
considerably affect his/her rates for the measured works,
and it is most important that he/she reads and fully
acquaints himself/herself (and his/her Sub-Contractors
and Suppliers) with all the information and requirements
that are contained therein.

5/58
EXTERNAL WORKS

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SITE PREPARATION (All PROVISIONAL)

A Clear the whole of the Site of all Rubbish, Bushes, Shrubs,


undergrowth and the like, cut down trees not exceeding
600mm girth, grub up all roots, load and dispose off site,
fill in all holes with clean earth from excavations, well
watered, rammed and consolidated in layers 6000 m2 0.92 5,520.00

SITE PREPARATION - TOTAL


CARRIED TO SUMMARY 5,520.00

5/59
EXTERNAL WORKS

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

WATER RETICULATION

A Excavating trenches not exceeding 1.50m deep and


average depth 900mm starting from existing ground level
to receive service pipes, including grading bottoms,
earthwork supports, backfilling with excavated material,
disposing of surplus excavated material off site 40 m 1.00 40.00
-
B Extra over excavating in hard rock 4 m³ 3.60 14.40
-
Medium duty Gavanised mild steel pipes, fittings -
and jointing as described -
-
C 19mm diameter, 900mm pipe set vertical in Garden stand -
pipe 5 nr 25.00 125.00
-
High Density Polyethylene pipes, Fittings and jointing as -
described -
-
D 75mm diameter pipe and laying in trench and to overhead -
Tank 40 m 5.00 200.00
-
E 75mm diameter Bend 4 nr 1.50 6.00
-
F 75mm diameter Equal Tee 4 nr 1.50 6.00
-
G 75mm diameter Gate valve 2 nr 10.00 20.00
-
H 75mm diameter Non Return Valve 2 nr 10.00 20.00
-
J 5,000 litres polyethylen-water tank mounted on 10m -
high steel tank stand (measured separately) complete with -
automation including float switch,ball valves and connecting -
pipes as described 1 nr 750.00 750.00
-
BOREHOLE -
-
K Site, drill and equip 70m deep borehole complete with -
control panel, 5HP submersible pump and cables including -
all necessary accessories 1 nr 1,800.00 1,800.00
-
-
Mobilisise / demobilise drilling equipment / materials to site
including clearing of access and operatin area measuring
40 x 40m and including intersite movement
L (all sites within 1km or each other) 1 lump 1,000.00 1,000.00
-
Mobilisise / demobilise test pumping equipment to site
including intersite movement (all sites within 1km or each
M other) 1 lump 500.00 500.00
-

5/60
EXTERNAL WORKS

Register the site at Water Resources Management Agency


(WARMA) including the final borehole construction, water
N quality and pumping tests details 1 lump 300.00 300.00
-
O Drill 6” pilot hole from surface up to 100m depth 100 m 10.00 1,000.00
-
P Reaming 10” up to 100m depth (good yield BHs) 100 m 10.00 1,000.00
-
Supply/install 150mm ID (6”) PVC plain flush-threaded casing
Q with end cap on bottom piece (1) 30 m 10.00 300.00
-
R Supply/install 150mm ID (6”) PVC slotted casing (1mm slot) 70 m 5.00 350.00
-
S Supply/install washed river gravel – gravel pack (3-5mm) 1 BH 100.00 100.00
-
T Clean and develop borehole with polypipe / jetting sonde 3 hour 100.00 300.00
-
5 x 30 minute step test 0.5 to 3.0 l/s, recording DWL within
U an installed dipper conduit to prescribed time schedule 1 test 100.00 100.00
-
12hr pumping test at up to 3 l/s, recording DWL within an
V installed dipper conduit to prescribed time schedule 1 test 100.00 100.00
-
12hr recovery test (pump off), recording DWL within an
W installed dipper conduit to prescribed time schedule 1 test 100.00 100.00
-
Water quality analysis (major cations and anions, including
X Fluoride and the trace metal Arsenic 1 lump 100.00 100.00
-
Provide locking cap on 1m piece steel casing which fits ove
r PVC production casing. Provide C25 concrete block
measuring 1m x 1m x 800m depth (100mm above, 500mm
Y below) 1 lump 100.00 100.00
-
-
To Collection
8,331.40

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

WATER TANK STAND

A Excavating Base Pits commencing at reduced level depth not


exceeding 1.5m deep 40 m3 3.60 144.00
-
B Excavating vegetable soil average depth 150mm, -
load, wheel not exceeding 100 metres and 47 m2 1.00 47.00
deposit in spoil heaps as described -
-
C Excavating trenches to receive concrete bed starting -
from reduced level and depth not exceeding 1.50m 13 m3 3.60 46.80
-
B Extra over excavating in hard rock as described 2 m3 20.00 40.00
-
C Levelling and compacting bottoms of excavations 26 m2 10.00 260.00

5/61
EXTERNAL WORKS

-
D Filling; 200mm thick stabilised gravel with 5% cement -
as blinding laid to even across falls and well watered -
roll, compacted in 100mm layers and consolidated -
to 95 percent of modified AASHTO density 26 m² 20.00 520.00
-
E Blinding; 150mm thick stabilised crushed stones with -
5% cement laid to even across falls and well watered -
roll, compacted in 150mm layers and consolidated -
to 93 percent of modified AASHTO density 26 m² 20.00 520.00
-
Hardcore or gravel to be obtained offsite -
-
F Filling; 350mm thick bed of gravel as sub base -
laid to even across falls and well watered roll, -
compacted in 150mm layers and consolidated -
to 98 percent of modified AASHTO density 15 m² 20.00 300.00
-
Reinforced In-situ Concrete Grade C30 as described -
-
G Bases 5 m3 135.00 675.00
-
H Stub columns 1 m3 135.00 135.00
-
J Ground beams 2 m3 135.00 270.00

High yield steel deformed bar reinforcement as described


including all cutting bending, hooking and cranking,
assembling etc, in accordance with the drawings and wiring
with and including No. 16 SWG annealed iron binding wire
and hoisting and lowering and fixing in position

K 20mm diameter bar 110 Kg 1.80 198.00


-
L 16mm diameter bar 569 Kg 1.80 1,024.20

To Collection 4,180.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

WATER TANK STAND

High yield steel round bar reinforcement as described


including all cutting bending, hooking and cranking,
assembling etc, in accordance with the drawings and wiring
with and including No. 16 SWG annealed iron binding wire

5/62
EXTERNAL WORKS

and hoisting and lowering and fixing in position

A 10mm diameter bar 85 Kg 1.80 153.00


-
Sawn formwork to reinforced in-situ concrete -
as described -
-
B To sides of bases 13 m2 30.00 390.00
-
C To sides of stub columns 11 m 2
30.00 330.00
-
Sawn formwork to reinforced in-situ concrete -
as described -
-
D To sides of ground beams 14 m2 30.00 420.00
-
STRUCTURAL STEEL -
-
Preamble -
-
(i) All steel to be grade 43 -
-
(ii) Steel shall be prefabricated in sections by an approved -
steel fabricator as shown on the structural drawings -
-
(iii) All welds to be 8mm minimum fillet welds unless otherwise -
specified -
-
Steel Girder Truss -
-
The following members in Steel Girder Truss, shop primed -
before delivery including hoisting, jointing and welding in -
position -
-
E IPE 120 x 64 x 10kg Universal Column 400 Kg 3.00 1,200.00
-
F 100 x 100 x 6mm Angle Lines as Columns 20 m 3.00 60.00
-
G 60 x 60 x 6mm Angle Lines as bracing welded to 10mm -
gusset plate (measured separately) 187 m 3.00 561.00

To Collection 3,114.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

STRUCTURAL STEEL

A 80 x 80 x 6mm Angle Lines as beams welded to


gusset plate welded to column and angle bracing
(measured separately) 54 m 3.00 162.00

5/63
EXTERNAL WORKS

-
B IPE 120 x 64 x 10kg Universal Beam 156 Kg 3.00 468.00
-
C 100 x 50 x 10kg Parallel Frange Beam 528 Kg 3.00 1,584.00
-
D 50 x 25mm diameter angle lines as handrails, ladder -
protection, welded to Y25 Bar risers 104 m 3.00 312.00
-
E Y25 Bar risers to engineers details 90 Kg 3.00 270.00
-
G 300 x 300 x16mm thick mild steel Base Plate 6 nr 50.00 300.00
-
H 250 x 150 x10mm thick mild steel Gusset Plate 30 nr 3.00 90.00
-
J 210 x 150 x12mm thick mild steel End Plate 30 nr 3.00 90.00
-
K M24, grade 8.8 J-bolts 900mm long 6 nr 5.00 30.00
-
L M16, grade 8.8 bolts 68 nr 0.75 51.00
-
M M20, grade 8.8 bolts 24 nr 0.75 18.00
-
N Allow for grouting welded joints and undersides of base plates item 100.00 100.00
-
Timber Decking -
-
P Hard wood timber decking size 7800X225X75mm 38 m2 13.00 494.00

Generally

Q Include for keeping excavation free from water,


mud and silt and for cleaning bottoms of all
excavations prior to pouring concrete Item 300.00 300.00

R Include for testing, Chlorinating and flushing out


the whole of the water reticulation system to
the entire satification of the Architect and Local
Authority Item 300.00 300.00

To Collection 4,569.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

STRUCTURAL STEEL

COLLECTION

5/64
EXTERNAL WORKS

Page No. 3/2

Page No. 3/3 4,180.00

Page No. 3/4 3,114.00

Page No. 3/5 4,569.00

WATER TANK STAND - TOTAL


CARRIED TO SUMMARY 11,863.00

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

SUMMARY PAGE

SITE PREPARATION 5/2 5,520.00

5/65
EXTERNAL WORKS

WATER RETICULATION AND BOREHOLE 5/3 8,331.40

WATER TANK STAND 5/7 11,863.00

EXTERNAL WORKS -
TOTAL CARRIED TO GENERAL SUMMARY 25,714.40

5/66
PROVISIONAL AND PRIME COST SUMS - MARKET WATERBORNE
TOILET BLOCK TYPE 1

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Include the following NET Provisional Sums


to be expended by Ministry of Agriculture
or omitted if not expended without any claim for loss
of profit

Labour

A Allow the Provisional Sum of One Thousand


Kwacha (USD $50.00) for net cost of
labour employed on authorised daywork cost
based on the statutory minimum rates
of wages to workmen as laid down under
Industrial Relations Act- Volume X Cap 517 50 50.00

B Add Percentage allowance for the cost of


statutory and other obligations expenses
and allowance arising out of the employment of
the labour and including for all relevant
contractor's overheads and profit % 37% 68.50

Materials

C Allow the Provisional Sum of One Thousand


Kwacha only (USD $50.00) for net cost of
materials and articles incorporated in
authorised daywork at invoice rates including
for a maximum of 5% cash discount if due
to the contractor 50 50.00

D Add Percentage allowance to cover complete


cost of incorporating materials into the
works including delivery of materials to site,
off-loading, storing, checking replacing defective
items, establishment charges all transport and
for installation of materials on site and all
contractor's overheads and profit % 30% 65.00

To Collection 233.50

6/67
PROVISIONAL AND PRIME COST SUMS - MARKET WATERBORNE
TOILET BLOCK TYPE 1

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Include the following Prime Cost Sums for works


to be excuted by Nominated Sub-Contractors or
omitted if not expended without any claim for loss of
profit

A Solar Electrical - Ten Thousand kwacha


only (USD $438.00) Item 438.00

B Add for Profit % 0.25 109.50

C Add for Attendance Item 0.1 43.80

D Provisional Sum or Contingencies to be expended by


Ministry of Agriculture or deducted in whole or part
as required - Three Hundred Thousand Kwacha
only (USD $13,200.00) Item 13,200.00

To Collection 14,258.30

COLLECTION

Page No 6/1 233.50

Page No 6/2 14,258.30

PROVISIONAL AND PRIME COST SUMS


TOTAL CARRIED TO SUMMARY 14,491.80

6/68
ITEM DESCRIPTION UNIT QTY RATE/USD AMOUNT

BILLS OF QUANTITIES

For the Proposed

CONSTRUCTION OF BULKING CENTRE SHED,


GUARD ROOM AND ABLUTION BLOCK WITH
ASSOCCIATED EXTERNAL WORKS
IN KAZUNGULA DISTRICT, SOUTHERN
PROVINCE

FOR

MINISTRY OF AGRICULTURE

GENERAL SUMMARY

BILL NR. 1 PRELIMINARIES AND GENERAL 25,000.00


ITEMS

BILL NR. 2 BULKING CENTRE 174,910.21


SHED

BILL NR. 3 GUARD ROOM AND ABLUTION 54,841.35


BLOCK

BILL NR. 4 DRAINAGE 14,573.60

BILL NR. 5 EXTERNAL WORKS 25,714.40

Carried Forward 295,039.56

(i)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Brought Forward

Add for the following in accordance with


provisions of the contract (if not included within
the body of the Bills)

All insurance item

All Statutory orders and Regulations item

Water for the Works item

Any other Matters item

Should the Contractor desire to make any general


increase or decrease on the above total, it is to be
made here and the amount will be treated as a
percentage of the total as above. The rates inserted
by the contractor against the items through out this
tender will be deemed to be adjusted accordingly
by this percentage . %

BILL NR. 6 PROVISIONAL AND PRIME COST SUMS


14,491.80

TOTAL CARRIED TO CONTRACTOR'S BID FORM 309,531.36

Signature of Contractor :………………………………………………

Name of Firm:…………………………………………………………………

Address:…………………………………………………………………………..

Date:………………………………………………………………………………….

Client
P.O.BOX
LUSAKA

(ii)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BILLS OF QUANTITIES

For the proposed

VOLUME 1 - REHABILITATION OF
INFRASTRUCTURE AND CONSTRUCTION OF
TRAINING FARM COMPRISING: MAIN BUILDING,
FARM SHED, POULTRY HOUSE, PIGGERY,
HORTICULTURE SHED, GUARD HOUSE, DAIRY
UNIT, ABLUTION BLOCK TYPE 1, VETERINARY
CLINIC, COW PADDOCK, MILKING PARLOUR AND
ASSOCIATED EXTERNAL WORKS; 1x8No.
CLASSROOM BLOCK; LIBRARY AND
ASSOCIATED EXTERNAL WORKS AT
NATURAL RESOURCES DEVELOPMENT
COLLEGE IN LUSAKA

FOR

MINISTRY OF AGRICULTURE

VOLUME 1 SUMMARY

BILL NR. 1 PRELIMINARIES AND GENERAL ITEMS K #REF!

BILL NR. 2 DESCRIPTION OF


MATERIALS & WORKMANSHIP K

BILL NR. 3 TRAINING FARM MAIN FARM BUILDING K #REF!

BILL NR. 4 MAIN FARM BUILDING DRAINAGE K #REF!

BILL NR. 5 TRAINING FARM MAIN FARM SHED K #REF!

BILL NR. 6 MAIN FARM SHED DRAINAGE K #REF!

BILL NR. 7 TRAINING FARM POULTRY HOUSE K #REF!

BILL NR. 8 POULTRY HOUSE DRAINAGE K #REF!

BILL NR. 9 TRAINING FARM PIGGERY K #REF!

Carried Forward K #REF!


(i)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Brought Forward K #REF!

BILL NR. 10 PIGGERY DRAINAGE K #REF!

BILL NR. 11 TRAINING FARM HORTICULTURE SHED K #REF!

BILL NR. 12 HORTICULTURE SHED DRAINAGE K #REF!

BILL NR. 13 TRAINING FARM GUARD HOUSE K #REF!

BILL NR. 14 GUARD HOUSE DRAINAGE K #REF!

BILL NR. 15 TRAINING FARM DAIRY UNIT K #REF!

BILL NR. 16 DAIRY UNIT DRAINAGE K #REF!

BILL NR. 17 TRAINING FARM ABLUTION BLOCK K 54,841.35

BILL NR. 18 ABLUTION DRAINAGE K #REF!

BILL NR. 19 TRAINING FARM VETERINARY CLINIC K #REF!

BILL NR. 20 VETERINARY CLINIC DRAINAGE K #REF!

BILL NR. 21 TRAINING FARM COW PADDOCK K #REF!

BILL NR. 22 COW PADDOCK DRAINAGE K #REF!

BILL NR. 23 TRAINING FARM MILKING PARLOUR K #REF!

BILL NR. 24 MILKING PARLOUR DRAINAGE K #REF!

BILL NR. 25 TRAINING FARM EXTERNAL WORKS K #REF!

BILL NR. 26 1 X 8No. CLASSROOM BLOCK K #REF!

BILL NR. 27 1 X 8No.CLASSROOM BLOCK DRAINAGE K #REF!

BILL NR. 28 1 X 8No.CLASSROOM BLOCK EXTERNAL WORKS K #REF!

BILL NR. 29 LIBRARY K #REF!

BILL NR. 30 LIBRARY DRAINAGE K #REF!

Carried Forward K #REF!


(ii)
ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Brought Forward K #REF!

BILL NR. 31 LIBRARY EXTERNAL WORKS K #REF!

BILL NR. 32 PRIME COST SUMS K #REF!

Carried To General Summary K #REF!