Professional Documents
Culture Documents
Rigger Log
Rigger Log
* Lifting cables must be re-torqued after one (1) week of service and then every three (3) months.
** If GFCI is installed for crane power it should be checked at regular intervals during the shift.
*** Coordinate with crane operator.
Maintenance Required/Completed:
Comments:
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
_____________
______________________________________________________________________________________________________________
__________
______________________________________________________________________________________________________________
__________
______________________________________________________________________________________________________________
_____________
______________________________________________________________________________________________________________
__________
SUPERVISOR REVIEWED RIGGER HSE ADVISOR
1 of 1
Cemrock Construction Ltd.