1 Contractor onboard*
100% 63.72%
A. Job Activity Before Shutdwon 4% 100% 4%
A.1.1 Lifting point hook for drive motor 4% 100% 0.16% 0.2% 0.00% Done
A.1.2 Move New Motor DCR1, DCR2, , 1LOR to 2nd Floor 5% 100% 0.20% 0.2% 0.20% Done 0 0 0
A.1.3 Assymble Lifting Beam DCR Roll 4% 100% 0.16% 0.2% 0.16% Done 0 0 0 0
A.1.4 Move DCR Roll to Rewinder area and Check the condition 3% 0.12% 0.0% 0.00% -
A.1.5 Fabricate Motor DCR Roll Base Frame, and remaining 15 motor stand 5% 100% 0.20% 0.2% 0.20% Done 0 0 0 0 0
A.1.6 Assymble Vacuum Roll Bearing 4% 100% 0.16% 0.2% 0.16% Done 0 0 0 0
A.1.7 Assymble Canvas Roll Coupling 4% 100% 0.16% 0.2% 0.16% Done 0 0 0 0
A.1.8 Move New Motor 2LOR, 3MR13, 3MR16, 3MR19, 3LOR, 4MR24, 4MR27, 4MR30,
5% 4LOR to 2nd Floor
100% 0.20% 0.2% 0.20% Done 0
A.1.9 Move New Motor 5MR36, 6MR43, 6MR44, 6MR47, 6LOR to 2nd Floor 5% 100% 0.20% 0.2% 0.20% Done 0
A.1.10 Assymble gearbox Dryer #1 Goldsun 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.11 Pre Assymble Pope Reel 9% 100% 0.36% 0.4% 0.36% Done 0
A.1.12 Dis Assymble Pope Reel 6% 100% 0.24% 0.2% 0.24% Done 0 0 0
A.1.13 Remove Calender piping 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.14 Pre-install soleplate Calender 6% 100% 0.24% 0.2% 0.24% Done 0 0 0 0 0
A.1.15 Marking Drill And Tap Sole Plate 5% 100% 0.20% 0.2% 0.20% Done 0 0
A.1.16 Marking Parts Reuse or scrap 5% 100% 0.20% 0.2% 0.20% Done 0
A.1.17 Prepare Panel Distribution Single And Three Phase 5% 100% 0.20% 0.2% 0.20% Done 0 0 0 0 0
A.1.18 Prepare Gear Puller Tool 5% 100% 0.20% 0.2% 0.20% Done 0 0
A.1.19 Open and check box packing list 4% 75% 0.16% 0.1% 0.12% 0 0
A.1.20 Assymble gearbox +Coupling Cyl#1 2% 100% 0.08% 0.1% 0.08% Done 0 0
A.1.21 PV Roll FS Bearing Assembly (8 Set) 2% 100% 0.08% 0.1% 0.08% Done 0 0
A.1.22 PV Roll BS Bearing Assembly (8 Set) 2% 100% 0.08% 0.1% 0.08% Done 0 0
A.1.23 Assembly Bearing Wire Top Former (4 Set) 2% 100% 0.08% 0.1% 0.08% 9 des% 0
B. PM building – 2nd floor 22
B.1. Wire 5% 4% 5
B.1.1 Dismantling existing 5 pcs roll top former 9% 100% 0.45% 0.4% 0.45% Done 1 0
B.1.2 Dismantling existing guide roll frame 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.1.3 Dismantling top foil blade 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.1.4 Install Inlet Roll / lead in roll 8% 50% 0.40% 0.2% 0.20% Bearing 11 des 1 0
B.1.5 Install Inlet vacuum box 9% 100% 0.45% 0.4% 0.45% 1 0
B.1.6 Install CIVB ceramics 9% 50% 0.45% 0.2% 0.22% By Process 1 0 0
B.1.7 Install CIVB lifting equipment 9% 100% 0.45% 0.4% 0.45% 1 0
B.1.8 Install turning roll / lead out roll 8% 80% 0.40% 0.3% 0.32% Bearing 11 des 1 0 0
B.1.9 Install stretcher roll save all 8% 80% 0.40% 0.3% 0.32% Bearing 11 des 1 0 0
B.1.10 Install stretcher roll 8% 80% 0.40% 0.3% 0.96% Bearing 11 des 1 0 0 0
B.1.11 Install guide roll assembly and roll 8% 80% 0.40% 0.3% 0.64% Bearing 11 des 1 0 0
B.1.12 Convert low vac to isoflow unit 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.2. Press & Dryer 1 21% 15% 22
B.2.1 Dismantling felt roll 3P ( 6pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.2 Dismantling uhle box (1 pcs ) 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.3 Dismantling roll 3P , include doctor & save all 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.4 Dismantling frame 3p and cantilever 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.5 Dismantling roll 4P top, include doctor 4% 100% 0.84% 0.8% 0.84% Done 1 0
B.2.6 Dismantling roll 4P bottom and doctor 4% 100% 0.84% 0.8% 0.84% Done 1 0
B.2.7 Dismantling felt roll 4P ( 2nd 3pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.8 Dismantling frame 4P 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.9 Dismantling center roll , doctor 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.10 Dismantling frame center roll 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.11 Dismantling felt roll 1P ( 2pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.12 Dismantling frame 1P bottom 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.13 Dismantling service plat form TS-DS 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.14 Dismantling cross walk way press 3 and 4 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.15 Install frame felt roll 1P relocation 2% 50% 0.42% 0.2% 0.21% 1 0
B.2.16 Dismantle cylinder dryer#1
Cyl l#1 (Spare Cyl) 1.5% 100% 0.31% 0.3% 0.31% Done 0
Cyl l#2 ( Renstall to Cyl #5) 1.5% 100% 0.31% 0.3% 0.31% Done 0
B.2.17 Dismatling vacuum roll 2 set -
VR #1 (No Use) 1.5% 100% 0.31% 0.3% 0.31% Done 0
VR#2 (No Use) 1.5% 100% 0.31% 0.3% 0.31% Done 0
Dismatling Doctor -
Cyl l#1 (Reuse) 1% 100% 0.21% 0.2% 0.21% Done 0
Cyl l#2 (Reuse) 1% 100% 0.21% 0.2% 0.21% Done 0
Dismantling Frame -
Cyl l#1 0.5% 100% 0.11% 0.1% 0.11% Done 0
Cyl l#2 0.5% 100% 0.11% 0.1% 0.11% Done 0
VR #1 0.5% 100% 0.11% 0.1% 0.11% Done 0
VR#2 0.5% 100% 0.11% 0.1% 0.11% Done 0
B.2.18 Marking drill and tap new frame dryer 3% 90% 0.63% 0.6% 2.27% 2 0 0 0 0
B.2.19 Install new frame ,save all,walk way 3% 20% 0.63% 0.1% 0.13% 2
B.2.20 Install frame dryer 1 – 4 2
DS Support (item 2) + TS Support (Item 1) 0.6% 30.0% 0.13% 0.0% 0.04% 0 0
Controller Support (Item 28) + Bracket (item 18) 0.6% 30.0% 0.13% 0.0% 0.04% 0 0
Stand 1 DS (Item 6) + Stand 1 TS (Item 8) 0.6% 30.0% 0.13% 0.0% 0.04% 0 0
Bracket (Item 18) + Bracket (Item 18) 0.6% 30.0% 0.13% 0.0% 0.04% 0 0
Stand 2 DS (Item No 7) + Stand 2 TS (Item no.5) 0.6% 30.0% 0.13% 0.0% 0.04% 0 0
B.2.21 Install vacuum roll 2
VR #1 1.7% 100.0% 0.35% 0.4% 0.35% 0 0
VR #2 1.7% 100.0% 0.35% 0.4% 0.35% 0 0
VR #3 1.7% 100.0% 0.35% 0.4% 0.35% 0 0
B.2.22 Install cylinder dryer 1- 4 5% 80% 1.05% 0.8% 0.84% 2 0 0 0
B.2.23 Install doctor dryer 1 – 4 2% 90% 0.42% 0.4% 0.25% 1
B.2.24 Install deflector and doctor 1P 2% 90% 0.42% 0.4% 0.25% 2
B.2.25 Install steam box 2% 90% 0.42% 0.4% 0.25% 1
W P A Plan Actual total Manpower OKTOBER NOVEMBER DEC
Duration
Act no Activity Remark
% % (days) MP 28 29 30 31 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec
C.1.6 Modification frame bottom felt 1P 10% 75% 0.50% 0.4% 0.75% 2 0 0
C.1.7 Cutting frame and save all 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.1.8 Install save all 5% 70% 0.25% 0.2% 0.88% 1 0 0 0 0 0
C.1.9 Install embedded plate for felt roll 5% 0% 0.25% 0.0% 0.00% 1
C.1.10 Install felt roll 6% 0% 0.30% 0.0% 0.00% 1
C.1.11 Install embedded plate for guide roll 5% 0% 0.25% 0.0% 0.00% 1
C.1.12 Install felt guide roll 7% 0% 0.35% 0.0% 0.00% 1
C.1.13 Dismantling uhle box existing 6% 100% 0.30% 0.3% 0.30% Done 1 0
C.1.14 Install new frame for uhle box 6% 0% 0.30% 0.0% 0.00% 1
C.2. Dryer 2 3
C.2.1 Dismantling all canvas roll 2D bottom 5% 100% 0.25% 0.3% 0.25% Done 1 0 0
C.2.2 Dismantling stretcher frame 5% 100% 0.25% 0.3% 0.25% Done 1 0 0
C.2.3 Move canvas cleaner to 3D bottom 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.3. Dryer 3 2
C.3.1 Relocation position canvas roll (1 Roll) 5% 0% 0.25% 0.0% 0.00% 2
C.4. Dryer 4
C.5. Dryer 5 3% 1% 10
C.5.1 Relocation frame stretcher 12% 50% 0.36% 0.2% 0.18% 2 0
C.5.2 Install canvas roll 20% 60% 0.60% 0.4% 0.36% 1 0
C.5.3 Install guide roll 18% 0% 0.54% 0.0% 0.00% 1
C.6. Dryer 6
C.6.1 Relocation frame stretcher 12% 30% 0.36% 0.1% 0.11% 2 0
C.6.2 Install short canvas roll 20% 0% 0.60% 0.0% 0.00% 1
C.6.3 Install guide roll 18% 0% 0.54% 0.0% 0.00% 1
D. PM Drives 22
D.1. Press 5% 4% 14
D.1.1 Dismantling motor 3P 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.2 Dismantling gear box 3P 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.3 Dismantling universal joint 3P roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.4 Dismantling motor 3P paper roll 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.5 Dismantling motor 4P top 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.6 Dismantling motor 4P bottom 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.7 Dismantling motor 4P paper roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.8 Dismantling gear box 4P top 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.9 Dismantling gear box 4P bottom 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.10 Dismantling universal joint 4P top roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.11 Dismantling universal joint 4P bottom roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
CIVIL JOB
D.1.12 Install 1st motor n sole plate shoe press 6% 0% 0.30% 0.0% 0.00% 1
D.1.13 Install 2nd motor n sole plate shoe press 6% 0% 0.30% 0.0% 0.00% 1
D.1.14 Install universal joint 1 6% 0% 0.30% 0.0% 0.00% 1
D.1.15 Install universal joint 2 6% 0% 0.30% 0.0% 0.00% 1
CIVIL JOB
D.2. Dryer 1 3% 0% 2
D.2.1 Install motor n sole plate dryer 1 30% 0% 0.90% 0.0% 0.00% 1 -
D.2.2 Install universal joint dryer 1 20% 0% 0.60% 0.0% 0.00% 1 -
D.2.3 Install motor n sole plate canvas drive D1 30% 0% 0.90% 0.0% 0.00% 1 -
D.2.4 Install universal joint canvas drive D1 20% 0% 0.60% 0.0% 0.00% 1 -
D.3. Dryer 2 ( EXISTING USED NO ACTION ) 3% 3% 3
D.3.1 Dismantling motor 2D existing 30% 100% 0.90% 0.9% 0.90% 1 0
D.3.2 Dismantling gear box 2D existing 20% 100% 0.60% 0.6% 0.60% 1 0
D.3.3 Dismantling floating shaft 2D 10% 100% 0.30% 0.3% 0.30% 1 0
D.3.4 Install motor n sole plate canvas drive 2D 30% 100% 0.90% 0.9% 0.90% 1 0
D.3.5 Install floating shaft 2D 10% 100% 0.30% 0.3% 0.30% 1 0
D.4. Dryer 3 4% 3% 22
D.4.1 Dismantling motor 3D existing 11% 100% 0.44% 0.4% 0.44% 1 0
D.4.2 Dismantling gear box 3D 11% 100% 0.44% 0.4% 0.44% 1 0
D.4.3 Dismantling floating shaft 3D 11% 100% 0.44% 0.4% 0.44% 1 0
CIVIL JOB
D.4.4 Install motor and sole plate top lead in roll 14% 75% 0.56% 0.4% 0.42% 1
D.4.5 Install motor and sole plate top lead out roll 14% 75% 0.56% 0.4% 0.42% 1
D.4.6 Install motor and sole plate bottom lead in roll 14% 75% 0.56% 0.4% 0.42% 1
D.4.7 Install motor and sole plate bottom lead out roll 14% 75% 0.56% 0.4% 0.42% 1
D.4.8 Install floating shaft 3D 11% 0.44% 0.0% 0.00% 1
D.5. Dryer 4 3% 2% 6
D.5.1 Dismantling motor 4D existing 11% 100% 0.33% 0.3% 0.33% 1 0
D.5.2 Dismantling gear box 4D 11% 100% 0.33% 0.3% 0.33% 1 0
D.5.3 Dismantling floating shaft 4D 11% 100% 0.33% 0.3% 0.33% 1 0
CIVIL JOB
D.5.4 Install motor top inner roll 14% 75% 0.42% 0.3% 0.32% 1
D.5.5 Install motor and sole plate top lead out roll 14% 75% 0.42% 0.3% 0.32% 1
D.5.6 Install motor and sole plate bottom lead in roll 14% 75% 0.42% 0.3% 0.32% 1
D.5.7 Install motor and sole plate bottom lead out roll 14% 0.42% 0.0% 0.00% 1
D.5.8 Install floating shaft 4D 11% 0.33% 0.0% 0.00% 1
D.6. Dryer 5 6% 5% 9
D.6.1 Dismantling motor 5D existing A 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.2 Dismantling gear box 5D A 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.3 Dismantling floating shaft 5D A 4% 100% 0.24% 0.2% 0.24% 1 0
D.6.4 Dismantling motor 5D existing B 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.5 Dismantling gear box 5D B 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.6 Dismantling floating shaft 5D B 4% 100% 0.24% 0.2% 0.24% 1 0
D.6.7 Dismantling motor 5D existing C 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.8 Dismantling gear box 5D C 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.9 Dismantling floating shaft 5D C 4% 100% 0.24% 0.2% 0.24% 1 0
CIVIL JOB
D.6.10 Install motor n sole plate canvas drive 32d 8% 75% 0.48% 0.4% 1.08% 1 0
D.6.11 Install floating shaft 32D single drive 5% 75% 0.30% 0.2% 0.68% 1
D.6.12 Install motor and sole plate top lead in roll 8% 75% 0.48% 0.4% 0.36% 1
D.6.13 Install motor and sole plate top lead out roll 8% 75% 0.48% 0.4% 0.36% 1
W P A Plan Actual total Manpower OKTOBER NOVEMBER DEC
Duration
Act no Activity Remark
% % (days) MP 28 29 30 31 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec
D.6.14 Install motor and sole plate bottom lead in roll 8% 75% 0.48% 0.4% 0.36% 1
D.6.15 Install motor and sole plate bottom lead out roll 8% 75% 0.48% 0.4% 0.36% 1
D.6.16 Install floating shaft 5D 4% 0.24% 0.0% 0.00% 1
D.7. Dryer 6 3% 2% 6
D.7.1 Dismantling motor calender's top 13% 100% 0.39% 0.4% 0.39% 1 0
D.7.2 Dismantling gear box calender’s 13% 100% 0.39% 0.4% 0.39% 1 0
D.7.3 Install motor and sole plate top lead in roll 16% 75% 0.48% 0.4% 0.36% 1 0
D.7.4 Install motor and sole plate top lead out roll 16% 75% 0.48% 0.4% 0.36% 1 0
D.7.5 Install motor and sole plate bottom lead in roll 16% 75% 0.48% 0.4% 0.36% 1 0
D.7.6 Install motor and sole plate top lead out roll 16% 75% 0.48% 0.4% 0.36% 1 0
D.7.7 Install floating shaft 6D 10% 0.30% 0.0% 0.00% 1 -
REVISION :1
DATE : 12/December/2019
DECEMBER Jan
16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0 0
0 0
0 0
DECEMBER Jan
16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
-
-
0
0
DECEMBER Jan
16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
0
0
0
0
0
0 0
0 0 0
0
0
DECEMBER Jan
16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
PD3 - PHASE 2 - INSTALLATION PLAN
DEPARTMENT : MECHANICAL
EQUIPMENT :
1 Contractor onboard*
100% 53.72%
A. Job Activity Before Shutdwon 4% 100% 4%
A.1.1 Lifting point hook for drive motor 4% 100% 0.16% 0.2% 0.00% Done
A.1.2 Move New Motor DCR1, DCR2, , 1LOR to 2nd Floor 5% 100% 0.20% 0.2% 0.20% Done 0 0
A.1.3 Assymble Lifting Beam DCR Roll 4% 100% 0.16% 0.2% 0.16% Done 0 0 0
A.1.4 Move DCR Roll to Rewinder area and Check the condition 3% 0.12% 0.0% 0.12% 0
A.1.5 Fabricate Motor DCR Roll Base Frame, and remaining 15 motor stand 5% 100% 0.20% 0.2% 0.20% Done 0 0 0 0 0
A.1.6 Assymble Vacuum Roll Bearing 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.7 Assymble Canvas Roll Coupling 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.8 Move New Motor 2LOR, 3MR13, 3MR16, 3MR19, 3LOR, 4MR24, 4MR27, 4MR30,
5% 4LOR to 2nd Floor
100% 0.20% 0.2% 0.20% Done 0
A.1.9 Move New Motor 5MR36, 6MR43, 6MR44, 6MR47, 6LOR to 2nd Floor 5% 100% 0.20% 0.2% 0.20% Done 0
A.1.10 Assymble gearbox Dryer #1 Goldsun 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.11 Pre Assymble Pope Reel 9% 100% 0.36% 0.4% 0.36% Done 0
A.1.12 Dis Assymble Pope Reel 6% 100% 0.24% 0.2% 0.24% Done 0 0
A.1.13 Remove Calender piping 4% 100% 0.16% 0.2% 0.16% Done 0
A.1.14 Pre-install soleplate Calender 6% 100% 0.24% 0.2% 0.24% Done 0 0 0 0
A.1.15 Marking Drill And Tap Sole Plate 5% 100% 0.20% 0.2% 0.20% Done 0 0
A.1.16 Marking Parts Reuse or scrap 5% 100% 0.20% 0.2% 0.20% Done 0
A.1.17 Prepare Panel Distribution Single And Three Phase 5% 100% 0.20% 0.2% 0.20% Done 0 0 0 0 0
A.1.18 Prepare Gear Puller Tool 5% 100% 0.20% 0.2% 0.20% Done 0 0 0 0
A.1.19 Open and check box packing list 4% 75% 0.16% 0.1% 0.16% 0 0 0
A.1.20 Assymble gearbox +Coupling Cyl#1 2% 100% 0.08% 0.1% 0.08% Done 0
A.1.21 PV Roll FS Bearing Assembly (8 Set) 2% 100% 0.08% 0.1% 0.08% Done 0 0 0
A.1.22 PV Roll BS Bearing Assembly (8 Set) 2% 100% 0.08% 0.1% 0.08% Done 0 0 0
A.1.23 Assembly Bearing Wire Top Former (4 Set) 2% 0.08% 0.0% 0.08% 9 des% 0
B. PM building – 2nd floor 22
B.1. Wire 5% 4% 5
B.1.1 Dismantling existing 5 pcs roll top former 9% 100% 0.45% 0.4% 0.45% Done 1 0
B.1.2 Dismantling existing guide roll frame 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.1.3 Dismantling top foil blade 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.1.4 Install Inlet Roll / lead in roll 8% 50% 0.40% 0.2% 0.40% Bearing 11 des 1 0
B.1.5 Install Inlet vacuum box 9% 100% 0.45% 0.4% 0.45% 1 0
B.1.6 Install CIVB ceramics 9% 50% 0.45% 0.2% 0.45% By Process 1 0
B.1.7 Install CIVB lifting equipment 9% 100% 0.45% 0.4% 0.45% 1 0
B.1.8 Install turning roll / lead out roll 8% 50% 0.40% 0.2% 0.40% Bearing 11 des 1 0
B.1.9 Install stretcher roll save all 8% 50% 0.40% 0.2% 0.40% Bearing 11 des 1 0
B.1.10 Install stretcher roll 8% 50% 0.40% 0.2% 0.40% Bearing 11 des 1 0
B.1.11 Install guide roll assembly and roll 8% 50% 0.40% 0.2% 0.40% Bearing 11 des 1 0
B.1.12 Convert low vac to isoflow unit 8% 100% 0.40% 0.4% 0.40% Done 1 0
B.2. Press & Dryer 1 21% 13% 22
B.2.1 Dismantling felt roll 3P ( 6pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.2 Dismantling uhle box (1 pcs ) 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.3 Dismantling roll 3P , include doctor & save all 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.4 Dismantling frame 3p and cantilever 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.5 Dismantling roll 4P top, include doctor 4% 100% 0.84% 0.8% 0.84% Done 1 0
B.2.6 Dismantling roll 4P bottom and doctor 4% 100% 0.84% 0.8% 0.84% Done 1 0
B.2.7 Dismantling felt roll 4P ( 2nd 3pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.8 Dismantling frame 4P 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.9 Dismantling center roll , doctor 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.10 Dismantling frame center roll 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.11 Dismantling felt roll 1P ( 2pcs ) 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.12 Dismantling frame 1P bottom 3% 100% 0.63% 0.6% 0.63% Done 1 0
B.2.13 Dismantling service plat form TS-DS 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.14 Dismantling cross walk way press 3 and 4 2% 100% 0.42% 0.4% 0.42% Done 1 0
B.2.15 Install frame felt roll 1P relocation 2% 50% 0.42% 0.2% 0.42% 1 0
B.2.16 Dismantle cylinder dryer#1
Cyl l#1 (Spare Cyl) 1.5% 100% 0.31% 0.3% 0.31% Done 0
Cyl l#2 ( Renstall to Cyl #5) 1.5% 100% 0.31% 0.3% 0.31% Done 0
B.2.17 Dismatling vacuum roll 2 set
B.2.18 Marking drill and tap new frame dryer 3% 95% 0.63% 0.6% 0.63% Done 2 0 0
B.2.19 Install new frame ,save all,walk way 3% 0.63% 0.0% 0.63% 2 0 0
B.2.20 Install frame dryer 1 – 4 2
DS Support (item 2) + TS Support (Item 1) 0.6% 30.0% 0.13% 0.0% 0.13% 0 0
Controller Support (Item 28) + Bracket (item 18) 0.6% 30.0% 0.13% 0.0% 0.13% 0 0
Stand 1 DS (Item 6) + Stand 1 TS (Item 8) 0.6% 30.0% 0.13% 0.0% 0.13% 0 0
Bracket (Item 18) + Bracket (Item 18) 0.6% 30.0% 0.13% 0.0% 0.13% 0 0
Stand 2 DS (Item No 7) + Stand 2 TS (Item no.5) 0.6% 30.0% 0.13% 0.0% 0.13% 0 0
B.2.21 Install vacuum roll 2
VR #1 1.7% 90.0% 0.35% 0.3% 0.35% 0 0
VR #2 1.7% 90.0% 0.35% 0.3% 0.35% 0 0
VR #3 1.7% 90.0% 0.35% 0.3% 0.35% 0 0
B.2.22 Install cylinder dryer 1- 4 5% 1.05% 0.0% 1.05% 2 0
B.2.23 Install doctor dryer 1 – 4 2% 0.42% 0.0% 0.42% 1
B.2.24 Install deflector and doctor 1P 2% 0.42% 0.0% 0.42% 2
B.2.25 Install steam box 2% 0.42% 0.0% 0.42% 1
W P A Plan Actual total Manpower OKTOBER NOVEMBER
Duration
Act no Activity Remark
% % (days) MP 28 29 30 31 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec
C.1.6 Modification frame bottom felt 1P 10% 75% 0.50% 0.4% 0.50% 2 0 0
C.1.7 Cutting frame and save all 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.1.8 Install save all 5% 70% 0.25% 0.2% 0.25% 1 0
C.1.9 Install embedded plate for felt roll 5% 0% 0.25% 0.0% 0.25% 1 0
C.1.10 Install felt roll 6% 0% 0.30% 0.0% 0.30% 1
C.1.11 Install embedded plate for guide roll 5% 0% 0.25% 0.0% 0.25% 1
C.1.12 Install felt guide roll 7% 0% 0.35% 0.0% 0.35% 1
C.1.13 Dismantling uhle box existing 6% 100% 0.30% 0.3% 0.30% Done 1
C.1.14 Install new frame for uhle box 6% 0% 0.30% 0.0% 0.30% 1
C.2. Dryer 2 3
C.2.1 Dismantling all canvas roll 2D bottom 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.2.2 Dismantling stretcher frame 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.2.3 Move canvas cleaner to 3D bottom 5% 100% 0.25% 0.3% 0.25% Done 1 0
C.3. Dryer 3 2
C.3.1 Relocation position canvas roll (1 Roll) 5% 0% 0.25% 0.0% 0.25% 2 0 0
C.4. Dryer 4
C.5. Dryer 5 3% 0% 10
C.5.1 Relocation frame stretcher 12% 50% 0.36% 0.2% 0.36% 2 0 0
C.5.2 Install canvas roll 20% 0% 0.60% 0.0% 0.60% 1 0
C.5.3 Install guide roll 18% 0% 0.54% 0.0% 0.54% 1 0
C.6. Dryer 6
C.6.1 Relocation frame stretcher 12% 30% 0.36% 0.1% 0.36% 2 0
C.6.2 Install short canvas roll 20% 0% 0.60% 0.0% 0.60% 1
C.6.3 Install guide roll 18% 0% 0.54% 0.0% 0.54% 1
D. PM Drives 22
D.1. Press 5% 4% 14
D.1.1 Dismantling motor 3P 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.2 Dismantling gear box 3P 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.3 Dismantling universal joint 3P roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.4 Dismantling motor 3P paper roll 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.5 Dismantling motor 4P top 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.6 Dismantling motor 4P bottom 8% 100% 0.40% 0.4% 0.40% Done 1 0
D.1.7 Dismantling motor 4P paper roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.8 Dismantling gear box 4P top 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.9 Dismantling gear box 4P bottom 7% 100% 0.35% 0.4% 0.35% Done 1 0
D.1.10 Dismantling universal joint 4P top roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
D.1.11 Dismantling universal joint 4P bottom roll 6% 100% 0.30% 0.3% 0.30% Done 1 0
CIVIL JOB
D.1.12 Install 1st motor n sole plate shoe press 6% 0% 0.30% 0.0% 0.30% 1 0
D.1.13 Install 2nd motor n sole plate shoe press 6% 0% 0.30% 0.0% 0.30% 1 0
D.1.14 Install universal joint 1 6% 0% 0.30% 0.0% 0.30% 1 0
D.1.15 Install universal joint 2 6% 0% 0.30% 0.0% 0.30% 1 0
CIVIL JOB
D.2. Dryer 1 3% 0% 2
D.2.1 Install motor n sole plate dryer 1 30% 0% 0.90% 0.0% 0.90% 1 0
D.2.2 Install universal joint dryer 1 20% 0% 0.60% 0.0% 0.60% 1 0
D.2.3 Install motor n sole plate canvas drive D1 30% 0% 0.90% 0.0% 0.90% 1 0
D.2.4 Install universal joint canvas drive D1 20% 0% 0.60% 0.0% 0.60% 1 0
D.3. Dryer 2 ( EXISTING USED NO ACTION ) 3% 3% 3
D.3.1 Dismantling motor 2D existing 30% 100% 0.90% 0.9% 0.90% 1 0
D.3.2 Dismantling gear box 2D existing 20% 100% 0.60% 0.6% 0.60% 1 0
D.3.3 Dismantling floating shaft 2D 10% 100% 0.30% 0.3% 0.30% 1 0
D.3.4 Install motor n sole plate canvas drive 2D 30% 100% 0.90% 0.9% 0.90% 1 0
D.3.5 Install floating shaft 2D 10% 100% 0.30% 0.3% 0.30% 1 0
D.4. Dryer 3 4% 1% 22
D.4.1 Dismantling motor 3D existing 11% 100% 0.44% 0.4% 0.44% 1 0
D.4.2 Dismantling gear box 3D 11% 100% 0.44% 0.4% 0.44% 1 0
D.4.3 Dismantling floating shaft 3D 11% 100% 0.44% 0.4% 0.44% 1 0
CIVIL JOB
D.4.4 Install motor and sole plate top lead in roll 14% 0.56% 0.0% 0.56% 1 0
D.4.5 Install motor and sole plate top lead out roll 14% 0.56% 0.0% 0.56% 1 0
D.4.6 Install motor and sole plate bottom lead in roll 14% 0.56% 0.0% 0.56% 1
D.4.7 Install motor and sole plate bottom lead out roll 14% 0.56% 0.0% 0.56% 1
D.4.8 Install floating shaft 3D 11% 0.44% 0.0% 0.44% 1
D.5. Dryer 4 3% 1% 6
D.5.1 Dismantling motor 4D existing 11% 100% 0.33% 0.3% 0.33% 1 0
D.5.2 Dismantling gear box 4D 11% 100% 0.33% 0.3% 0.33% 1 0
D.5.3 Dismantling floating shaft 4D 11% 100% 0.33% 0.3% 0.33% 1 0
CIVIL JOB
D.5.4 Install motor top inner roll 14% 0.42% 0.0% 0.42% 1 0
D.5.5 Install motor and sole plate top lead out roll 14% 0.42% 0.0% 0.42% 1 0
D.5.6 Install motor and sole plate bottom lead in roll 14% 0.42% 0.0% 0.42% 1
D.5.7 Install motor and sole plate bottom lead out roll 14% 0.42% 0.0% 0.42% 1
D.5.8 Install floating shaft 4D 11% 0.33% 0.0% 0.33% 1
D.6. Dryer 5 6% 3% 9
D.6.1 Dismantling motor 5D existing A 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.2 Dismantling gear box 5D A 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.3 Dismantling floating shaft 5D A 4% 100% 0.24% 0.2% 0.24% 1 0
D.6.4 Dismantling motor 5D existing B 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.5 Dismantling gear box 5D B 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.6 Dismantling floating shaft 5D B 4% 100% 0.24% 0.2% 0.24% 1 0
D.6.7 Dismantling motor 5D existing C 7% 100% 0.42% 0.4% 0.42% 1 0
D.6.8 Dismantling gear box 5D C 6% 100% 0.36% 0.4% 0.36% 1 0
D.6.9 Dismantling floating shaft 5D C 4% 100% 0.24% 0.2% 0.24% 1 0
CIVIL JOB
D.6.10 Install motor n sole plate canvas drive 32d 8% 0.48% 0.0% 0.48% 1
D.6.11 Install floating shaft 32D single drive 5% 0.30% 0.0% 0.30% 1
D.6.12 Install motor and sole plate top lead in roll 8% 0.48% 0.0% 0.48% 1
D.6.13 Install motor and sole plate top lead out roll 8% 0.48% 0.0% 0.48% 1
W P A Plan Actual total Manpower OKTOBER NOVEMBER
Duration
Act no Activity Remark
% % (days) MP 28 29 30 31 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec
D.6.14 Install motor and sole plate bottom lead in roll 8% 0.48% 0.0% 0.48% 1
D.6.15 Install motor and sole plate bottom lead out roll 8% 0.48% 0.0% 0.48% 1
D.6.16 Install floating shaft 5D 4% 0.24% 0.0% 0.24% 1
D.7. Dryer 6 3% 2% 6
D.7.1 Dismantling motor calender's top 13% 100% 0.39% 0.4% 0.39% 1 0
D.7.2 Dismantling gear box calender’s 13% 100% 0.39% 0.4% 0.39% 1 0
D.7.3 Install motor and sole plate top lead in roll 16% 75% 0.48% 0.4% 0.48% 1 0
D.7.4 Install motor and sole plate top lead out roll 16% 75% 0.48% 0.4% 0.48% 1 0
D.7.5 Install motor and sole plate bottom lead in roll 16% 75% 0.48% 0.4% 0.48% 1 0
D.7.6 Install motor and sole plate top lead out roll 16% 75% 0.48% 0.4% 0.48% 1 0
D.7.7 Install floating shaft 6D 10% 0.30% 0.0% 0.30% 1 0
REVISION :1
DATE : 12/December/2019
DECEMBER Jan
12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
0 0
0
DECEMBER Jan
12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
0
0
0
0 0
0
0
0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0
0 0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
0 0
0
0 0
0
0
0
0
0
0
0
0
0
0
DECEMBER Jan
12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
DECEMBER Jan
12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1 2
0
0
0 0
S-Curve for Mechanical
120% 14%
12%
100%
Progress Percentage
10%
80%
8%
Acumulative Progress
Plan
60%
Actual
Plan Cumulative
6% Actual Cumulative
40%
4%
20%
2%
0% 0%
N ov N ov N ov N ov v v v v v v v v v v v c c c c c c c c c c c c c c c
No No No No No No No No No No No -De -De -De -De -De -De -De -De -De -De -De -De -De -De -De -De
c
1- 3- 5- 7- 9- 11- 13- 15- 17- 19- 21- 23- 25- 27- 29- 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
Date
S-CURVE FOR PIPING
120% 4.0%
3.5%
100%
3.0%
80%
2.5%
Accumulative Progress
Progress Percentage
PLAN DAILY PROGRESS
60% 2.0%
ACTUAL DAILY PROGRESS
PLAN CUMMULATIVE
ACTUAL CUMMULATIVE
1.5%
40%
1.0%
20%
0.5%
0% 0.0%
1- 5- 9- 13 17 21 25 29 3- 7- 11 15 19 23 27 31 4- 8- 12 16 20 24 28 2- 6- 10 14 18 22 26 30
S ep Sep Sep -Se -Se -Se -Se -Se Oct Oct -Oc -Oc -Oc -Oc -Oc -Oc Nov Nov -No -No -No -No -No Dec Dec -De -De -De -De -De -De
p p p p p t t t t t t v v v v v c c c c c c
Date
PROGRESS S - CURVE PIPING PM14
S-CURVE FOR PIPING Rev.01 SD2
DATE
PLAN UNIT -3 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95
NO DESCRIPTION VOLUME WEIGHT
TOTAL
WEIGHT
PER JOB 18-Aug 25-Aug 1-Sep 2-Sep 3-Sep 4-Sep 5-Sep 6-Sep 7-Sep 8-Sep 9-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep 1-Oct 2-Oct 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1-Dec 2-Dec 3-Dec 4-Dec
ACT. CUMM.
100%
4 TUBING 6%
PLAN 2520 1% 200 300 300
Dismantle m
ACTUAL 0.1 0% 0.1
PLAN 3130 3% 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 100 100 100 100 100 100 140 100 70 70 70 70 70 50 50 50 50 50 50 50 50 50 50 50 50 50 5
Fabrication m
ACTUAL 2472.1 2% 0.1 60 36 18 18 30 78 168 48 30 120 24 60 120 30 20 78 65 39 90 74 82 92 160 65 22 68 39 38 54 60 36 92 82 36 24 60 61 60 135
PLAN 3130 4% 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 100 100 100 100 100 100 140 100 70 70 70 70 70 50 50 50 50 50 50 50 50 50 50 50 50 50 5
Install m
ACTUAL 2192.1 3% 0.1 60 36 18 18 30 78 66 48 30 29 24 60 35 30 20 20 16 29 30 22 39 38 54 60 36 72 78 54 72 90 24 66 66 66 174 168
5 SUPPORT 6%
PLAN 159 2% 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5 5 10 10 10 10 10 10 11
Fabrication Ea
ACTUAL 159 2% 0.1 3 2 6 4 5 8 5 4 6 10 8 8 10 3 5 3 6 10 12 5 3 2 2 2 1 2 2 3 3 2 3 2 1 2 2 2.9 1
PLAN 159 1% 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 10 10 10 10 10 10 5 5 5 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Install Ea
ACTUAL 145.1 1% 0.1 2 1 1 3 2 1 2 1 5 3 3 5 3 2 4 3 3 6 4 3 2 2 2 1 2 2 2 4 4 1 3 2 2 4 3 3 2 2 4 3 2 2 2 2 2 2 2 2
100% 100%
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 179.9
94 268 228 257 140 156 67 151.3 99 152 106 174 32 217.5 274 132 48
300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 150 105
350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 100 100 100 100 100 100 94
45 7 25 55 110 219
300 200 200 100 100 100 100 100 100 100 100 100 50 70
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
143 24 120 25 24
2 2 4
2 2 1 2 4 3 2 4 2
3% 3% 3% 3% 3% 2% 2% 2% 2% 2% 2% 2% 2% 2% 1% 1% 1% 1% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 101%
66% 69% 72% 75% 78% 80% 82% 85% 87% 89% 91% 92% 94% 95% 97% 98% 99% 100% 101% 101% 101% 101% 101% 101% 101% 101% 101% 101% 101%
1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 2% 2% 2% 2% 2% 86%
66.5% 67.7% 69.0% 70.0% 70.9% 71.7% 72.4% 73.4% 74.7% 75.9% 77.1% 78.4% 79.9% 81.5% 83.0% 84.5% 86.3%