TF - Esp 1 & 2 22.01.15
TF - Esp 1 & 2 22.01.15
TF - Esp 1 & 2 22.01.15
15
Audit Team:- N.P Shiju (Dy. Mgr Civil)
Sl DATE LOCA AGENCY / Observation Pic Recommandation Compliance
TION CONTACTOR with picture.
2 22.01.15 ESP IVRCL Barrication not found Hard barrication should be done
for excavation pit for excavation pit deeper than
between ESP 1& 2 1.5 mtrs
(IVRCL)
3 22.01.15 ESP BHEL ( M/s Plug top not found for Plug tops should be provided for
B&R) electric cable (ESP 2) all electric cables
5 22.01.15 ESP BHEL ( M/s Barrication not found Barrication should be done for
B&R) for winch machine winch machine immediately
(ESP 2)
7 22.01.15 ESP BHEL ( M/s Improper access Access to the main electrical
B&R) found for main panel should be made clear so
electrical panel that it will be easy to reach
(ESP 2) electrical panel in emergency
KM Solanki
(Mgr Safety)