STRAIGHTENING REPORT Date : 4-Jan-08

PT. Sanggar Sarana Baja


Responsibility : QC Department
Remanufacturing Division
Page : 1 of 1

No. : Customer : Part Name : Line Shaft Transmission Pump

PO. No. : Location : Model : NON-CAT

NRC-ID : Cust. WO. No. : Part No. : 697-LINE SHAFT


REFERENCES :
1. GUIDELINE FOR REUSABLE PARTS AND SALVAGE OPERATIONS : SEBF8072-06 March 2000

EQUIPMENT USED :
1. EITEL STRAIGHTENING PRESS (MODEL RP160, SERIAL NO. 25960, CAPACITY 160 TONS)

0 A B C D E F
0 0°

270° 90°

180°
L

Pre-Salvage Inspection Post Salvage Inspection


ROD LENGTH ( L ) = ……………….. mm (inch)
ACCEPTABLE RUN OUT FOR STRAIGHTENING PROCESS : < 3.18 / 610 mm (0.125 / 24.0 in) x ……….…..mm (inch) = ……....….. mm (inch)
INITIAL RUN-OUT MEASUREMENT (CENTER TO CENTER)
A B C D E F
0O

90O
180O
270O

INITIAL RUN-OUT MEASUREMENT (WITH ROLLER)


A B C D E F
0O
90O
180O
270O
NOTES :
*) ACCEPTABLE RUN OUT < 0.085 mm
*) ACCEPTABLE RUN OUT FOR HARD CHROME PLATING SALVAGE PROCESS < 0.376 mm JUDGMENT ACCEPT REJECT
*) ACCEPTABLE RUN OUT FOR OVERALL RODS WITHOUT SALVAGE PROCESS < 0.360 mm
*) ACCEPTABLE RUN OUT FOR OVERALL RODS THAT WILL BE REBUILD BY WELD < 0.760 mm
*) STRAIGHTENING IS NOT APPLICABLE FOR ROD AS STEERING CYLINDER,
SCRAPER BOWL AND FRONT SUSPENSION ROD
FINAL READING AFTER STRAIGHTENING
A B C D E F
0O

JUDGEMENT : ACCEPT REJECT


Reviewed by Checked by Executed by
QC Engineer : Inspector : Operator :