Tender Document Vol 3 of 4

You might also like

Download as pdf
Download as pdf
You are on page 1of 1139
JABATAN KERJA RAYA SARAWAK TENDER NO: T/997/06/2019 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) VOLUME 3 OF 4 - TENDER DOCUMENT (SPECIFICATIONS) IMPLEMENTING AGENCY CONSULTING ENGINEER KTA (Sarawak) Sdn. Bhd. (53003-D) Lot 8650-3, Section 64, Jalan Simpang Tiga 98360 Kuching, Sarawak, Malaysia Tel : 082.421 133 Jabatan Kerja Raya Sarawak QUANTITY SURVEYOR Jan Ta Abang Hall Openg PEB Consulting QS Sdn. Bhd. (664810-K) 99582 Kuching, Sarawak, Malaysia 2% Foor, Lot $69-670, Jalan Nanas 93400 Kuching, Sarawak, Malaysia Tel : 082 246 816 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) TABLE OF CONTENTS VOLUME 1 of 4 - TENDER DOCUMENT (GENERAL) SECTION 1 - CONDITIONS OF TENDERING a) ») c) dq) Instruction to Tenderers (For Works) Appendix 1 - Tenderer's Declaration Checklist for Tender Document and Mandatory ‘Supporting Document Conditions of Tendering Form of Tender (Works) and Appendix to Form of Tender Preambies to Bills of Quantities Method of Measurement Bills of Quantities BiINo.1 - Preliminaries And Generally BillNo.2 = Traffic Management and Control BillNo.3 - Environmental Protection Works BillNo.4 = Topographical Survey BillNo.5 —- Site Investigation Works Bil|No.6 Demolition & Clearance BillNo.7 - Earthworks (All Provisional) BIIINo.8 = Geotechnical Works (All Provisional) BillNo.9 = Culvert & Drainage Works Bill No. 10 - Utilities Relocation Works BillNo. 11 - Pavement BillNo.12 - Road Fumiture Bill No. 13 - Batang Lupar Bridge No.2 ~ Cable Stayed BillNo. 14 - Vehicular Box Culvert BillNo. 15 - Electrical Works BillNo. 16 - Mechanical Works BillNo. 17 - Piling Works (All Provisional) BillNo.18 Traffic Signal System BillNo.19 = Provisional Sums Rev.) Page 1to6 1 only 1to2 41010 1103 1105 MIM-1 to 21 Bat-1 tos BQ2-1 to4 BQ3-1 to 5 Not Applicable BQS-1 tod BQ6-1 only BQT-1 to3 BQ8-1 only BQ9-1 to4 BQ10-1 too Batt-1 to2 BQ12-4 to8 BQ13-1 to 30 Not Applicable BQ15-1 to 18 BQ16-1 to4 BQ17-1 to7 BQ18-1 to3 BQ19-1 only Page -i PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) TABLE OF CONTENTS VOLUME 1 of 4 - TENDER DOCUMENT (GENERAL) SECTION1 - CONDITIONS OF TENDERING 9) Grand Summary (Summary of Bills of Quantities) h) Schedule of Unit Rate for Mechanical and Electrical Works i) Schedule of Unit Rate for Traffic Signal System j) Attachments to Form of Tender (Bound Separately in VOLUME 2 of 4) SECTION 2 - FORM OF CONTRACT a) —_ JKR Sarawak Form of Contract PWD 75 (Ver. 2006) b) Addendum to the Form of Contract ©) Sample of Bank Guarantee Form for Performance Security Rev.) Page ST-4 only 1t06 1t03 Cover page only 1102 1102 Page PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO, 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) TABLE OF CONTENTS VOLUME 20f4 - TENDER DOCUMENT (ATTACHMENTS TO FORM OF TENDER) SECTION 1 - CONDITIONS OF TENDERING Page }) Attachments to Form of Tender 1 (Bound Separately in VOLUME 2 of 4) Form A Surat Perakuan Kebenaran Maklumat dan 2 Pengesahan Dokumen yang dikemukakan oleh Petender FormB — Tenderer’s Particulars 4 Form —— Makiumat Kewangan (Financial Information) 7 FormC1 Banker's Report on Financial Facilities of Tenderer 10 FormD List of Past Projects (for last (five) 5 years) 12 Form D1 Contractor Performance Assessment (Attachment) 13 FormE List of Ongoing Contracts 15 Form F List of Plants and Equipment 16 FormG List of Technical Staff (Lead Company) 17 Form G1__List of Technical Staff (JV Company) 18 Form G2__List of Technical Staff (Organization Chart) 19 FormH Health and Safety Compliance 20 Form! ‘Tenderers List of Bumiputra Sub-Contractor and 21 Supplier FormJ Tenderers List of Recognition/Certification 2 FormK — Tenderer’s Schedule for Mechanical And Electrical 23 Works Form 1 Tenderer’s Schedule for Water Reticulation Works 54 Form K2 _Tenderer’s Schedule for Topographical Survey Not Applicable Form K3__Tenderer’s Schedule for Site Investigation Works 60 Form Ké —Tenderer’s Schedule for Traffic Signal System 64 FormL Proposed Programme of Works 65 Form L1 Proposed Programme for Plants and Equipment 66 Allocation / Schedules FormM — Tenderer’s Proposed Method of Construction 68 Rev. 0) Pagel PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) TABLE OF CONTENTS VOLUME 30f4 - TENDER DOCUMENT (SPECIFICATIONS) SECTION 3 - SPECIFICATIONS (A) SPECIFICATIONS OF PARTICULAR Page APPLICATION {a) Section 1 - General 1to21 (b) Section 2 - Earthworks 1to4 (6) Section 3 - Drainage Works 1to11 (@) Section 4 - Flexible Pavement 1106 (e) Section 6 - Road Furniture 1108 (Section 7 - Road Lighting 1to48 (g) Section 9 - Concrete 1 to 18 (h) Section 10 - Piling Works 10 10 (Section 12- Structural Steelwork 1012 (Addendum 4 - Environmental Protection and 1t02 Enhancements {k) Section AD‘6 - Site Investigation Works 1037 (Section AD17 - Geotechnical Works 1015 (m) Section AD18 - HV Electrical Services 1to 30 (n) Section AD19 - Relocation of HV/LV Electrical 1 toot Services (0) Section AD20~ Mechanical Ventilation Services 1 0 15 (p) Section AD21 - General Specification for Water 1t07 Main Construction (q)_ Section AD22 - Occupational Safety and Health 1 only (9) Section AD23 ~ Stay Cable System 1to 19 (s) _ Section AD24 ~ Wind Tunnel Testing 1to2 (0) Section AD25 — Structural Health Monitoring System 1 to 15 (u) Section AD26 — Preliminary Test Pile 1to8 (V)_ Section AD27 — Traffic Signal System 41020 (w) Section AD28 — Traffic Diversion and Management 1 to 10 (%) Section AD29 - Reinforced Soil Retaining Wall 1to9 ‘Systems (Rev. 0) Page -iv PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI MAN DIVISION) TABLE OF CONTENTS VOLUME 3 0f4 - TENDER DOCUMENT (SPECIFICATIONS) SECTION3 - SPECIFICATIONS (B) STANDARD SPECIFICATIONS (@) Preambles To Standard Specifications (b) Standard Specification for Road Works (Including Bridge Structures) 0) O) (iii) (wv) wy) ) wi) (viii) (ix) ” Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures), document JKR/SPU/1988 (JKR 20401-0017- 89) ‘Addendum No.S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKRSPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 ‘Addendum No. 2 to Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures) ‘Addendum No. 4 to Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures) Addendum No. 5 to Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures) ‘Addendum No. 6 to Jabatan Kerja Raya ‘Standard Specification for Road Works (including Bridge Structures) Section 2 ~ Earthworks (JKR/SPJ/2013-S2, JKR 21300-0046-13) Section 3: Drainage Works (JKR/SPJ/2013- S3, JKR 21300-0057-14) Section 4: Flexible Pavement (JKR/SPJ/2008- 84, JKR 20403-0003-07) ‘Sub-Section 6.3: Road Markings (IKR/SPJ/2012-S6, JKR 21300-0037-12) () General Specification for Water Main Construction by Jabatan Kerja Raya Sarawak (Spesifikasi Am Bagi Pembinaan Saluran Paip Air) (October 2011) Page 1t02 Cover page only 1 to 28 A2-4 only Ad-4 to 15 AB 02 AG-1 104 82-1 to.20 83-4 to.24 84-4 to 161 $6.3-1to5 110 62 (Rev) Page-v PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (PACKAGE B3: PROPOSED BATANG LUPAR BRIDGE NO. 2 AT SRI AMAN TOWN, SRI AMAN DIVISION) TABLE OF CONTENTS VOLUME 3 of 4. - TENDER DOCUMENT (SPECIFICATIONS) SECTION3 - SPECIFICATIONS B) STANDARD SPECIFICATIONS (Cont'd) Page (4) Standard Specification for Occupation Safety & 11011 Health for Engineering Construction Works 2011 (e) Jabatan Kerja Raya Specification for Low total 114 pages Voltage Internal Electrical Installation (L-S1), CKE.LS.01.01(03).2016, dated June 2016. (f) Jabatan Kerja Raya Specification for Lightning total 19 pages. Protection System for Structures (L-S9) dated 19 September 2001 (9) Jabatan Kerja Raya Specification for Road Lighting 1 to 49 Installation, CKE,LS.01.20.(02).2013, Revision 2: (Addendum No. 2 to L-S20: Specification for 1 to7 Road Lighting Installation (August 1999) (h) Distribution Service Circular No. 2/2009 Design, Construction and Supervision of Electrical ‘Works by Professional Engineers (Revision to Distribution Service Circular No, 6/94 ref. PLS/13/102/CKY/BJ dated 1 September 1994) (i) Distribution Service Circular No. 2/2009 3to1 (ii) Appendix A to H 1t0 53 SECTION 4 - APPENDICES ‘Appendix 1 - list of Drawings. 1t0 12 Appendix 2 ~ List of Materials of Malaysia Origin 1t02 ‘Appendix 3 - _ JKR Sarawak Standard QA/QC 1to3 Forms/Checklist Appendix 4 - Form E - Factory and Machinery 1t03 (Notification, Certification of Fitness and Inspection) 1970 - Regulation 4 Appendix 5 - Lembaga Pembangunan Industri 1to2 Pembinaan Malaysia (Amendment of Third Schedule) Order 2017 VOLUME 40f4 - TENDER DOCUMENT (TENDER DRAWINGS) Tender Drawings (Rev. 0) —Page=vi SECTION 3 - SPECIFICATIONS SPECIFICATION OF PARTICULAR APPLICATION PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package 83: Proposed Batang Lupar Bridge No. 2 at Si Aman Town, Sri Aman Division) 14 1.2 13 14 15 16 APPENDIX 1C - APPENDIX 1D - APPENDIX 1E - SPECIFICATION OF PARTICULAR APPLICATION SECTION 1 - GENERAL Table of Contents Description Page SUB-SECTION "1.1 - GENERAL DESCRIPTION OF THE PROJECT"..1 SUB-SECTION “1.2 - SCOPE OF WORKS"...... SUB-SECTION °AD1.4.2— Requirements of The Construction Programme” - - sevaeme noc SUB-SECTION “AD1.7 - MATERIALS OF MALAYSIAN ORIGIN" SUB-SECTION “1.15 - OFFICE ACCOMMODATION FOR S.O. AND HIS STAFF”... net i 3 SUB-SECTION "1.20 - MAINTENANCE OF EXISTING ROADS AND. PROTECTION OF TRAFFIC” sessestnnnnnseenaennnses sel VEHICLES FOR S.0. AND HIS STAFF......... a8 LIST OF LABORATORY EQUIPMENT . coc 9 LIST OF SURVEY INSTRUMENTS AND EQUIPMENT APPENDIX AD1F - FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE BUILDINGS. 14 “SpacTeaton ot Paralr Applicaton Reno) PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Lupar Bridge No.2 at Sri Aman Town, Si Aman Division) SECTION 1 - GENERAL The followings serve to add, delete, amend, replace or clarify Section 1: General in Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures), document JKRISPJ/1988 (JKR 20401-0017-89) and Addendum No.S-1 (Rev. 1) to Jabatan Kerja Raya ‘Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997. 14 444 SUB-SECTION “1.1 - GENERAL DESCRIPTION OF THE PROJECT” The general description of the project is as below: “The State Government of Sarawak intends to a Second Trunk Road between ‘Samarahan to Roban with an exit link to Pan Borneo Highway vide Sebuyau to Sri Aman / Betong and Jalan Kelupu mv Jalan Tg. Genting to Lanang Bridge, Sibu. The project will be implemented as below: a) 2) (3) Package A comprises approximately 112km of a new JKR R5 Standard 2-lane single carriageway from Samarahan to Roban with an extent link to Pan Bomeo Highway including construction of Batang Saribas Bridge, minor bridges, junctions and overtaking lanes; Package B comprises approximately 92km of a new JKR R5 Standard 2-lane single carriageway from Sebuyau to Sri Aman / Betong including construction of Batang Lingga Bridge, Batang Lupar Bridge No. 2, minor bridges, junctions and overtaking lanes; and Package C comprises upgrading of approximately 30km of Jalan Kelupu / Jalan Tg. Genting to Lanang Bridge, Sibu into dual-carriageway JKR RS 4-lane road, including construction of minor bridges, junctions, and overtaking lanes. Package B is further divided into four (4) packages as below: (1) Package B1 - from Sebuyau to Lingga Town Including Sg. Lingga Bridge, Samarahan and Sti Aman Division. This work package mainly consists of approximately 32.2km proposed road, one (1) proposed major bridge over Sg. Lingga, and two (2) proposed minor bridge. This section starts from a proposed roundabout (by other) at Sebuyau, which links to proposed bridge over Batang Lupar (by other), and ends at Lingga (KM32.2). The terrain encountered is generally flat with soft ground condition. The main access to this area is basically via existing roads near Sebuyau and Lingga Town or Batang Lupar river. Package B2 - from Lingga to Proposed Batang Lupar Bridge No. 2 at Sri Aman Town, Sri Aman Division. This work package mainly consists of approximately 32.9km proposed road and three (3) proposed minor bridge. This section starts from Lingga (KM32.9) to Sri Aman (KM64.7), before crossing the Batang Lupar. The terrain encountered is generally flat with soft ground condition. The main access to this area is basically via existing road which connects Lingga Town and Sri Aman Town. ‘Speclicalon of Particular Apateation ~ Secon 1 Page7 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No.2 at Sri Aman Town, Sri Aman Division) (3) (4) Package B3 - Proposed Batang Lupar Bridge No. 2 at Sri Aman Town, Sri ‘Aman Division. This work package consists of approximately 870m span proposed cable stayed bridge over Batang Lupar, complete with approach roads. This section forms the major link between Sri Aman (KM64.7) and Betong (KM67.65) Package B4 - from Proposed Batang Lupar Bridge No. 2 at Sri Aman Town to Betong Interchange (at Pan Borneo Highway), Betong Division. This work Package mainly consists of approximately 24.3km proposed road and one (1) proposed minor bridges. This section starts after the Proposed Batang Lupar Bridge No. 2 (KM67.65) and ends at Betong Interchange at Pan Bomeo Highway (KIM91.5). The terrain encountered is generally rolling to undulating. This section includes upgrading of the existing (approximately 2.65km) road from Lidong Junction to Betong Junction." 1.2 SUB-SECTION “1.2 - SCOPE OF WORKS” 1.21 The Contractor shall provide everything necessary for the proper execution of the works as shown on the list of drawings as per Volume 4 of 4 and as described in the Specification as per Volume 3 of 4. The scope of works for Package B3 (comprises of approximately 870m span proposed cable stayed bridge over Batang Lupar and approach roads. This section forms the major link between Sri Aman (at KM64.7) and Betong (at KM67.65) includes, but is not limited to the followings: (a) (b) (o) (d) (e) © (9) (h) Site Investigation works for one (1) No. confirmatory borehole on proposed road and one (1) No. confirmatory borehole on proposed bridge site during construction, complete with field and laboratory testing and reporting. Site clearing and grubbing and stripping of top soil. Demolition of existing buildings and/or structures affected by the Works. Provision and construction of all necessary temporary river crossings, road diversions and temporary access roads for the proper and expeditious execution of this Contract. Excavation in common and rock materials to the formation level including trimming, and turfing on cut slopes and berms. Special embankment construction over peaty and clayey soil Construction of drainage works including culverts, diversion drains, interceptor drains, roadside drains, embankment drains, cascade drains, outfall chutes, horizontal drains and other drainage structures. Construction of asphaltic concrete road pavement with road shoulders and road furniture, including traffic signal system at Sri Aman Junction 1 and Sri ‘Aman Junetion 2. Construction of a 2-lane single carriageway cable stayed bridge over of 870m ‘span comprising 2 No. reinforced concrete towers with prestressed reinforced concrete deck on piled foundation, and piled embankments; complete with mechanical ventilation works, tower lighting system, bridge/street and petiialion of Parcular Application = Section 7 Page-2 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Brge No.2 al ii Aman Town, Si Aman Division) 13 1.3.4 14 144 15 154 navigation lighting. () Utilities relocation to the following services including liaison with relevant authorities: ‘* Existing 150mm diameter water pipeworks from CH.64700 to CH.67650; + Existing HV and LV electrical services at CH.65600 — CH.65700, at Sri Aman Junction 1 and at Sri Aman Junction; and * Civil Works for Telekom Services at Sri Aman Junetion 1. (®) Environmental management and protection measures such as provision of Environmental Management Plan (EMP), environmental control, monitoring and auditing, and the provision, maintenance and removal upon completion of erosion and sediment control plan (ESCP). (Preparation and submission of Traffic Management Plan and Report including provision of traffic management team, independent checker, and provision, maintenance and removal upon completion of temporary road diversion, temporary road furniture. (m) Provisional sums for: + "SESCo (or Sarawak Energy Berhad) connection charges"; * "Telekom Malaysia Services Relocation Cost"; ‘+ "Bridge Tower Decorative Lighting System"; and * "Structural Health Monitoring System (SHMS) of Bridge". (n) All works incidental to the project including any modifications to be carried out in accordance with the Conditions and Specification of this Contract.” SUB-SECTION “AD1.4.2 — Requirements of The Construction Programme” Replace the first sentence of clause (a) with the following: “The Contractor shall submit to the S.0. for his approval the Construction Programme using Critical Path Method Analysis Programme showing the order or procedure and method in which the Contractor proposes to carry out the works within any time constraints applicable.” SUB-SECTION “AD1.7 — MATERIALS OF MALAYSIAN ORIGIN” Replace the words “Appendix AD-1F, (appended to this Addendum)," in line 1 of first paragraph with the words "Appendix 2 ~ List of Materials of Malaysian Origin in Tender Document Volume 3 of 4” SUB-SECTION “1.15 - OFFICE ACCOMMODATION FOR S.0. AND HIS STAFF” Delete the whole of the existing sub-section 1.15 in Jabatan Kerja Raya Standard Specification _for_Road Works (including Bridge Structures), document JKR/SPJ/1988 (JKR_20401-0017-89) and Addendum No..S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 and replace with the following: ‘Specifeaton of Parcular Application = Section T Page-3 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Lupa’ Bridge No. 2 st Si Aman Tov, Sri Aman Division) "ADI.A5 AD1.15.1 AD1.15.2 AD1.15.3 SITE BUILDINGS FOR S.0. AND HIS STAFF General The Contractor shall provide Site Buildings, which comprises one (1) block Site Office, one (1) block Material Testing Laboratory, and four (4) blocks Staff Quarter for the exclusive use of the S.O. and his supervisory staff and inclusive of all furniture, fittings, appliances and equipment as specified hereinafter. The rented buildings shall be in close proximity to the Site, and acceptable to S.0. ‘The schedule of areas and rooms of the Site Buildings are as stated in Table AD-1F.1 for Site Office, Table AD-1F.2 for Material Testing Laboratory, and Table AD-1F.3 for Staff Quarter. Mosquito netting of approved type shall be provided to all site buildings as directed by the S.O. The Contractor shall make proper arrangements for and pay all charges in connection with the site buildings. Upon practical completion of the Works, the Contractor shall further maintain Site Buildings for another three (3) months or as directed by the S.O. and thereafter the Site Buildings together with all furniture and fittings which become the property of the Contractor. Services The Contractor shall arrange for the Site Buildings to be connected to the electricity and water supplies from the public utility authorities or private operators. Electricity supply shall be 220/240 volt AC. The supply shall be on 24 hour basis and sufficient to meet the demands for all the equipment and appliances specified The Site Buildings shall be illuminated by fluorescent fittings giving a general level of illumination of at least 215 lumens/sq. m. Additional lighting in the form of wall or deck lamps shall be provided where required by the S.O. Lighting to toilets and corridors may be by tungsten filament bulbs, Thermostatically controlled new air-conditioners capable of monitoring a temperature below 23 degrees Celsius shall be provided in the position as shown on the drawings. The open area in the laboratory shall be provided with ceiling fan. The Contractor shall pay for the electricity and water bills of the Site Buildings, including all necessary connection and disconnection charges, deposits and fees as levied by the relevant authorities. Telecommunic: ns. For the site office, the Contractor shall arrange for the installation of telephones, one (1) facsimile and data transmission system using two ‘Speciicaton of Paricular Appleation - Socion 1 Pago-# PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Lupar Bridge No.2 at Sr Aman Town, Si Aman Division) AD1.15.4 AD1.15.5 AD1.15.6 AD1.15.7 (2) separate telephone lines to the approval of the S.O. for the ‘exclusive use of the S.0. at all times (refer Table AD1F.3). The system shall be connected to the Malaysia's public switch networks by approved means. The Contractor shall also provide data line and data equipment for internet connection, complete with Wi-Fi modem router, and network switch for LAN connectivity. ‘An intercom system with six (6) extensions connecting the various rooms/areas of the site office and the laboratory and the Contractor's office that comprises six extensions or more shall also be provided as part of a separate system to the main system. The Contractor shall only be responsible for the complete installations and connections of the telecommunication system. Daily Cleaning and Watching The Contractor shall make provision for the daily cleaning of all the site buildings and to maintain the buildings in a thoroughly clean and sanitary condition. in addition the Contractor shall engage at least two watchmen to provide security around the clock and every day inclusive of public holidays and weekends. Maintenance The Contractor shall maintain the whole of the facilities provided as specified in sub-section AD1.15. Maintenance shall be provided at all times and the Contractor shall supply all necessary labour, materials, parts and replacement for all equipment and appliances for all necessary repair works. The Contractor shall also supply the stationeries for the Site Office and Material Testing Laboratory as and when required by the S.O. and his representatives. Furniture, Fittings, Appliances and Equipment Furniture, fittings, appliances and equipment to be provided to the site buildings shall all be new and as listed in Tables AD-1F.1, AD-1F.2 and AD-1F.3 in Appendix AD-1F of this specification. Speed Boat for the S.0, and His Staff The Contractor shall provide one (1) new speedboat made of fibreglass and capable of carrying six (6) passengers, together with an efficient crew for the sole use of the S.0. and his staff. The boat shall be registered, with all duties paid, and insured. It shall be equipped with a full too! kit and seven (7) adult lfe jackets. The Contractor shall service and maintain with all fuel, fittings and spare parts as may be required for reliable operation until the practical completion of the Works. The boat shall have a small cabin and roof, and shall be powered with an ‘Specifeaton of Partcular Applicaton ~ Seaton T Page-5 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No. 2 at Si Aman Tew, S1i Aman Division) ‘outboard engine of at least 2 x 30 horsepower. The Contractor shall construct, maintain and remove until the end of three (3) months after practical completion of the Works a temporary jetty and access on Site to the approval of the S.O. for mooring the boat and other purposes. ‘The boat and its accessories shall then become the property of the Contractor. AD1.15.8 Office Equipment The Contractor shall provide and maintain the office equipment as per Table AD1F.4 in Appendix AD1F throughout the duration of the Contract, and all shall remain the property of the Contractor at the end of the three- month period after the practical completion of the Works. The Contractor shall supply compact disc and/or USB flash drive as and when required by the S.0. and his representatives for the maintenance of desktop/laptop computers, including renewal of software licenses as necessary, ‘The Contractor shall supply A3 and Aé size papers and toners as and when required by the S.O. and his representatives for the maintenance of the photocopier. AD1.15.9 Personal Protective Equipment The Contractor shall provide and maintain until three (3) months after practical completion of the Works the following approved new personal protective equipment for the site office in good condition and to the approval of the S.0 (a) Filter masks (dust respirators) for all survey and earthwork and other staff of the Contractor and the S.0.; (b) Ear protectors for the piling crew, supervis Contractor and the S.0.; ry staff of both the (©) 30No. safety helmets with SIRIM certification as required; (d) 30 pairs safety rubber boots as required; (©) 30 pairs safety boots as required; (f) 30 No. rain suit as required; and (9) 30 No. safety vest as required, All the personal protective equipment shall remain the property of the Contractor at the end of the three-month period after practical completion of the Works. ‘Speciicalon of Particular Applicaton = Socton PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Lupar Brige No.2 al Sf Aman Town, Si Aman Division) 1.6 1.6.1 AD1.15.10 AD1.15.14 Camera ‘The Contractor shall provide one (1) unit new project digital camera of minimum 16MP and 5X optical zoom with built-in flashlight, time and date features, full HD video function, two (2) No. 32GB memory card, battery, battery charger, camera case for the sole use of the S.0. and his staff. Government's Facilities Requirements ‘The Contractor shall provide and maintain until practical completion the following office equipment: (a) One (1) set desktop computer with Intel Quad Core TM-i7, 8GB DDR4 2666MHz Memory, dedicated 4 GB graphic card, 3.5" 1TB 7200 rpm hard disk drive, 16x DVD-RW drive, 27" wide LCD Monitor with 1280 x 1024 HD resolution, cordless keyboard, cordless mouse, mouse pad, and three (3) years global warranty. Each desktop computer shall include latest version of licensed software for MICROSOFT WINDOW 10 (preloaded), MICROSOFT OFFICE, full version Adobe Acrobat Reader, full version WinRAR for zip files, Global Mapper for GIS for 3D viewer, full version Google Earth, full version Adobe Photoshop, Anti-Virus with network security, and "Primavera P6 Professional 17" software. One (1) set of 1TB external harddisk shall also be provided. (b) One (1) unit of smart phone with 128GB memory, 20MP camera, battery charge, ear phone and accessories; complete with connecting to the Malaysia's private phone network system with data and call usage, including paying rental and call charges.” The maintenance of desktop computer shall include the renewal of software licenses, The above office equipment shall become the property of the Employer after practical completion. ‘SUB-SECTION “1,20 - MAINTENANCE OF EXISTING ROADS AND PROTECTION OF TRAFFIC” ‘Add the following sentence to the end of the third paragraph of Sub-section 1.20.1: “All lorries carrying crushed rock or earth or the like needed to be properly covered with canvas and properly tied down." “Specticalion of Particular Applcaion ~ Seaton 7 GET PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package 83: Proposed Batang Lupar Bridge No.2 at Sr Aman Town, Sri Aman Division) APPENDIX 1C - VEHICLES FOR S.0. AND HIS STAFF Delete the whole contents and replace with the followings: “Type A Vehicle (brand new air-conditioned four wheel drive vehicle, minimum 2500 c.c., SUV type, with standard accessories) — one (1) No. Type B Vehicle (brand new air-conditioned four wheel drive vehicle, minimum 2000 c.c., Twin Cap type, with standard accessories) — seven (7) No.” ‘Specification of Particular Applicaton = Secon 1 Page-6 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Packane 83: Proposed Batana Lupar Bridge No, 2 at Sri Aman Town, Sri Aman Dwsion) APPENDIX 1D - LIST OF LABORATORY EQUIPMENT Replace the list of laboratory equipment in Jabatan Kerja Raya Standard Specification for id Works (including Bridge Structures) ment JKR/SPJ/1988 (JKR 20401-0017-89) and Addendum No..S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 with the following list: Laboratory Equipment No. (@) Soil Testing Equipment (1) Moisture content tins - 76mm x 25mm with tids 25 (2) Electric balance of 1 kg capacity, accurate to 0.1 g with a tare 1 correction of not less than 100g. (3) Electric forced draught oven, capacity of 0.08 cu.m., and could be 1 thermostically controllable up to a temperature of 160°C. (4) Complete apparatus to determine liquid limit (@) Casagrande apparatus method - All apparatus required 1 as listed under Cl. 4.5.2: BS 1377 : Part2 : 1980 (5) Complete apparatus to determine Plastic Limit as per Cl. 5.3.2 1 BS 137: Part2: 1990 (6) 300mm diameter BS Standard Sieves of the following sizes with 4each mechanical sieves shaker: 75mm, 63mm, 50mm, 37.5mm, 28mm, 26mm, 20mm, 14mm, 12.6mm, 10mm, 9.6mm, 6.3mm, 5mm, 475mm, 3.35mm, 236mm, 2mm, 1.1émm, 600 um, 425um, 300um, 212um, 150um, 63 um, lid and pan. (7) 200mm diameter BS Standard Wash Sieves: 2mm, 63 um ofeach (8) Corrosion Resistant Trays of size 300mm square and 40mm deep 3 8 per Cl, 9.2.2.7 : BS 1377 : Part 2: 1990 (9) Balance of 10 kg capacity readable to 1. gm 1 (10) Balance of 25 kg capacity readable to 5 gm. 1 (11) 4.5 kg rammer with drop height control for Heavy Compaction 4 Test as per Cl. 3.5.2.2: BS 1377 : Part 4 : 1990 (12) Cylindrical corrosion resistant compaction mould as specified 1 under Cl, 3.5.2.1: BS 1377: Part 4; 1990 (13) Compaction mould extruder. 1 (14) Steel scoop 1 (15) Rubber mallet 1 (16) Measuring flasks - 10000c 2 (17) Vernier calipers - 450mm 1 (18) Steel rule - 300mm 1 (19) Complete CBR apparatus as per Cl. 7.4.2: BS 1377 : Part 4 ‘set 1990 as consisting of: (@) Cylindrical Metal Plunger (b) Machine for applying test force Specification of Parcular Applicaton = Sacion 1 Page-9 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bdge No. 2 at Sri Aman Town, Sri Aman Division) (b) Laboratory Equipment (20) (21) (2) (23) (24) (25) (26) (7) (28) (29) (30) (©) A calibrated force measuring device with three types of load (proving) rings: 0-2 KN range 0-10 KN range (0-50 KN range CBR Mould & ancillary items as per BS 1377 : Part 4: 1990 as described below: (2) Cylindrical Corrosion Resistant Mould, Base Plate and Extension Collar (per Ci. 7.2.2.1) (b) Perforated base plate (per Cl. 7.3.2.1) (©) Perforated swell plate with adjustable stem (per Cl 73.2.2) (4) Tripod mounting for dial gauge indicator (per Cl. 7.3.2.3) (€) Dial gauge 26mm travel, reading to 0.01mm (per Cl. 73.2.4) Fiiter papers (160mm dia.) suitable spanner to work on CBR mould, Petroleum jelly Annular surcharge discs, 2.0 kg as per Cl. 7.3.26 : BS 1377 Part 4 : 1990 Complete In-situ density apparatus as per BS 1377 : Part 9 : 1990 (2 types) (a) Cl. 2.1- Sand replacement method for fine & medium grained soils (small pouring cylinder method) (b) Cl. 2.2 - Sand replacement method for fine, medium and coarse grained soils (large pouring cylinder method) Mackintosh Probe set suitable for sounding test to a depth of 15m with all necessary couplings, two (2) No. driving points, two (2) No. wrenches, one (1) No. hammer with guide rod and one (1) No. carrying case. Crowbar, pick and spade. Drying pans - 400mm x 400mm x 75mm British Standard 1377 : 1990 - "Method of Test for Soils for Civil Engineering Purposes”, latest edition Tank for soaking up to 20 CBR moulds. Hand Auger, comprises an auger of approved design to ASTM 101452-65 (1972) ‘Soil investigation and Sampling by Auger with extension auger capable of reaching &m. Peat Auger, consists of a semi-circular solid. steel cone of base diameter 56mm fitted to a stainless steel semi-circular hollow cylinder of internal diameter 60mm and wall thickness of 3mm, with extension auger capable of reaching 15m. Concrete Testing Equipment a“ 150mm x 150mm x 150mm concrete test cube steel moulds as specified in BS 1881 : Part 108 : 1983. 10 no. each As needed 10 1 of each, peciicaton of Panclar Applicaton — Section T Page 10 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package 88: Proposed Batang Lupar Bridge No.2 at Sri Aman Town, Si Aman Division) (o) Laboratory Equipment (2) Slump cones with tamping rods as specified in BS 1881 : Part 102 1983. (3) Tank for curing of concrete specimens to accommodate 50 nos, x 152mm cubes in layers not more than 50mm deep. (4) Concrete compression testing machine, complete with all accessories, 2000kKN capacity, to meet the requirements of BS1881: Part 115. Flexible Pavement Testing Equipment (1) (2) (3) (4) 6) 6) m7 (8) (9) (10) (iy (12) (13) (14) (1) (18) (17) Metal tray, 0.6m square or similar suitable for measuring spray rates of bituminous materials, Metal thickness gauge (or set of slotted sleeves) as specified in MS 30 for determination of aggregate flakiness index. Balance of 6 kg capacity, accurate of 0.1 g suitable for weighing samples suspended in liquid complete with attachment hook. Steel moulds for Marshall test specimens (101.6 + 0.1mm) internal diameter complete with mould base and extension collar as specified in Section 4: BS 698 : Part 107 : 1990. Extractor of suitable design for removing Marshall test specimens from moulds without distortion or shock to the specimen. Compaction hammer and automatic compactor for compacting Marshall test specimens as specified in Section 4 : BS 598 : Part 407 : 1990. ‘Compaction pedestal inclusive of mould clamps for Marshall test as specified under Cl, 4.9: BS 598 : Part 107 : 1990, Oven of capacity 450 litres complying with BS 2648 with fan assisted air circulation fitted with thermostatic control and with temperature range of 80°C - 250°C as per Cl. 4.2 : BS 698 : Part 107: 1980 Rubber and heat resistant gloves. Filter papers - 100mm diameter Containers for heating aggregates and bituminous materials. Pavement coring machine of the thin-walled diamond bit type for obtaining 100mm diameter samples of bituminous surfacings, 400mm diameter thin-walled diamond bits for use with pavement coring machine, Tools for cutting and trimming pavement cores. ‘Thermostatically controlled water bath for Marshall test specimens as specified per Cl. 4.11 : BS 598: Part 107 : 1990. Steel or Cast Iron Testing Head as per Cl. 4.12 : BS 598 : Part 107 : 1990. Compression testing machine with a proving ring capable of applying loads up to at least 22 KN at a constant rate of strain of 50mm + 3mm per minute under all loading conditions as per Cl. 4.13 : BS 598 : Part 107 : 1990. The load measurement device shall be calibrated to Grade B as per BS 1610 : Part 1 and shall record the maximum load, 4 of each 4 of each 2 pairs of each As needed 3 1 ‘Specification of Particular Application = Secon 1 Page iT PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Brge No, 2 al Si Aran Town, Sri Aman Division) Laboratory Equipment ‘No. 1 (18) Dial gauge and mounting assembly for measuring Marshall test flows of up to 10mm with accuracy of + 0.1mm as specified in BS 598, ‘SpecTicaton of Particular Application = Section 1 Page 7 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No.2 at Sri Aman Town, Sr Aman DNislon) APPENDIX 1E - LIST OF SURVEY INSTRUMENTS AND EQUIPMENT Delete the whole contents in Jabatan Kerja Raya Standard Specification for Road Works (including Bridge Structures), document JKR/SPJ/1988 (JKR 20401-0017-89) and Addendum No..S-1_(Rev. 1) to Jabatan_Kerja_Raya Standard Specification _for_Road_Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 and replace with the followings: “The Contractor shall provide and maintain for the duration of the Contract one set of new survey instruments and equipment as listed below for the S.O. and his staff. These survey instruments and equipment shall be the property of the Contractor at the end of the Contract. List of Survey Equipment 11No. Distomat Topcon DM-A5 or equivalent 1No. Theodolite of direct read out accurate to 1 second 1No. Automatic levels - Wild NA2 or equivalent 2No. Levelling staves - 5m aluminium 2No. 50m steel box tapes, white face 2No. 30m fibreglass box tapes 4No. 2.5m ranging rods 2No. 1m spirit level, steel or aluminium 2No. Survey umbrella 3No. Tripods 2No, Angle bubbles for levelling staves 1No, Prismatic Compass 1No, Clinometer Templates, straightedges, canvas bags, pegs, hammers, parangs, etc.” pecticaion of Parla Application = Secon 7 Page 13 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No. 2 at Sf Aman Town, Si Aman Division) APPENDIX AD{F - FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE Add BUILDINGS the following new Appendix “The Contractor shall provide and maintain the following furniture, fittings, appliances and equipment which shall become the property of the Contractor at the end of the Contract: TABLE AD1F.1 - LIST OF FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE OFFICE (TEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT. 1 14 12 ‘One block (1) Site Office; Conference Room @ 50m2 - 4 nr Conference table; 6m x 2m Conference table; 3m x 1.4m Chairs with arms, Chairs without arms. ‘White magnetic board with magnetic tapes and white board markers. Aircon; 15,000Btuihr clw 208 SSO. 413A SSO socket outlet. Lighting point c/w light fitting. Office Rooms (3 nr, 18m* each): Drawings bench; 3.6m x 0.9m x 0.9m high. Double pedestal desk; 2.1m x 0.9m with lockable drawers, Plan chest with 6 drawers for storing A1 size drawings. Executive chair for desk. Chairs with arms. Draughtman's stool Glass fronted bookcase; 0.9m x 0.3m x 1.2m 4 drawers steel filing cabinet with pockets. Soft-board wall panelling for pin board; 2.4m x 1.2m Filing trays. Waste paper basket. Scientific calculator. Heavy duty hole puncher. Aircon; 12,000Btuhr chw 20A SSO. 418A SSO socket outlet Lighting point clw light fiting inimum wall-up floor area of 266 m2: 2 Quantity per Room 1 1 1 pec ication of Pariclar Applicaton ~ Section 7 Pages Te PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package 83: Proposed Batang Lupar Bridge No. 2 at Sri Aman Town, Sri Aman Division) TABLE AD4F.1 - LIST OF FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE OFFICE (TEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT. QUANTITY 4.3 Office Room (4 nr, 9 m? each): Quantity per Room Double pedestal desk; 2.1m x 0.9m with Lockable drawers. 1 Executive chair for desk. 4 Scientific Calculator. 1 Chairs with arms 2 Glass fronted bookcase; 0.9m x 0.3m x 1.2m 1 4 drawers steel filing cabinet with pockets. 1 Soft-board wall panelling for pin board; 2.4m x 4.2m 1 Filing trays. 3 Waste paper basket, 1 Heavy duty hole puncher. 1 Aircon; 9,000 Btu/hr clw 20A SSO. 1 18A SSO socket outlet. 3 Lighting point chw light fiting. 1 4.4 General Area (1 nr, 60m?) Total Single pedestal desk; 1.3m x 0.75m with drawer. 4 Typist’s chair; adjustable type. 4 Table; 1.5m x 0.9m 1 Steel filing cabinet 4 drawers with pockets. 4 Filing trays. 4 ‘Waste paper baskets 4 ‘Soft-board for pin board; 2.4m x 1.2m 2 Scientific Calculator. 4 Lockable cupboard: 2m x 0.9m x 0.45m 4 Fire Extinguisher. 1 Chair without arms, 4 Plan Hanger. 10 Heavy duty hole puncher. 6 Aircon; 18,000Btu/hr chw 20A SSO. 4 18A SSO socket outlet. 3 Lighting point c/w light fitting. 2 4.5 Pantry Area (1 nr, 18m?): Total ‘Specification of Particular Applicaton = Secon 1 Page 15 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECON TRUNK ROAD (Package 8: Proposed Batang Lupar Bridge No.2 at Si Aman Town, Sri Aman Division) TABLE AD{F.1 - LIST OF FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE OFFICE ITEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT. quanniTy, 0.5 cu.m. electric refrigerator. 1 Dustbin (plastic). 1 Set of cups, glasses and teaspoon (1 set = 6 cups, 6 glasses, 6 teaspoon), 3 ‘ire Extinguisher. 1 Electric kettle. 2 Single bow! kitchen sink. 2 Microwave oven of minimum 25 litre capacity 1 Dining table to seat 6 complete with dining chair. ‘set Aircon-18,000Btu/hr clw 20A SSO. 1 13A SSO socket outlet. 6 Lighting point c/w light fitting. 1 16 ‘irst Aid Room (1 nr, 15 m7): Total Single bed; 36 inches (W) x 76 inches (L) with Dunlop mattress x minimum 4 1 inches thk. First Aid Kit; Contents and supplies of first aid kit in accordance to OSHA's 2 recommend: ‘Single pedestal desk; 1.3m x 0.75m with lockable drawers, 1 Office chair (adjustable) with arms 1 Chair with arms. 2 Steel filing cabinet; 6 drawers with glass door, 72 inches (H) x 36 inches (W) 1 X18 inches (0) Dustbin (plastic). 1 ‘Aircon; 12,000Btulhr clw 208 SSO. 1 13A SSO socket outlet. 3 Lighting point c/w tight fitting. 4 4.7. Prayer Room (1 nr, 15m?) Total Floor carpet (full area). 1 Full height blind curtain c/w railings. 1 Dustbin (plastic) 4 Aircon; 12,000Btu/hr ciw 20A SSO. 1 13A SSO socket outlet. 2 Lighting point c/w light fitting, 4 ‘Specicaton of Parlcuar Applealion = Section 1 Page 16 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD. (Package B3: Proposed Batang Lupar Bridge No.2 at Si Aman Town, Sri Aman Division) TABLE AD4F.1 - LIST OF FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR SITE OFFICE ITEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT. QUANTITY, 1.8 Toilets and Shower Rooms Total (2 male toilets, 1 male shower room, 2 female toilets, 1 female shower room; min, total area of 18m?) W.C. pedestal type c/w toilet roll holder. Wash basin, Towel rail Wall mirror. ‘Shower fittings. RN eR ew Water heater with pump. Lighting point c/w light fitting. 1 pecan of Parcular Applicaton = Section 7 Page=17 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No.2 at Sri Aman Town, Sr Aman Dwvision) TABLE AD4F.2 - LIST OF FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT FOR MATERIAL, TESTING LABORATORY ITEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT TOTAL 2 One (1) block Material Testing laboratory; minimum wall-up floor area of 142 m2: 2.4 Technician Room (1nr, 9m?) Double pedestal desk 2.1m x 0.9m with Lockable drawers. 1 Executive chair for desk. 1 Scientific Calculator. 1 Chairs with arms. 2 Glass fronted bookcase; 0.9m x 0.3m x 4.2m 1 4 drawers steel filing cabinet with pockets. 1 Soft-board wall panelling for pin board; 2.4m x 1.2m 1 Filing trays. 3 Heavy duty hole puncher. 1 Waste paper basket. 1 Aircon; 12,000Btu/hr clw 208 SSO. 1 13A SSO socket outlet. 3 Lighting point c/w light fitting. 2 2.2 Heavy Soll And Concrete Testing Room (1 nr, 62 m? Aircon; 12,000Btu/hr clw 20A SSO. 1 413A SSO socket outlet Lighting point c/w light fitting. 2.3 Light Soil And Concrete Testing Room (1 nr, 34m?): Aircon; 12,000Btuihr clw 20A SSO. 1 413A SSO socket outlet. 6 Lighting point ow light fitting 2 2.4 Bitumen Laboratory Room (1nr, 33m"): Aircon; 12,000Btu/hr chw 20 SSO. 1 413A SSO socket outlet 6 Lighting point c'w light fiting 2 2.5 Store Room (1 nr, 7m*): Lighting point c/w light fitting 1 “Spacicaon ot Para Rpt = Seton 7 Paget PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No, 2at Sr Aman Town, Si Aman Division) TABLE AD{F.3 - LIST OF FURNITURE, FITTINGS APPLIANCES AND EQUIPMENT FOR STAFF QUARTERS ITEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT GENERAL REQUIREMENTS 3 Four (4) Blocks Staff Quarter (1 up floor area of 90 m2 per block) imum total wall- 3.4. Bedrooms (12m? each): 3 bedroom per house 1.8m x 1.65m timber bed with Dunlop mattress. 1.5m x 0.9m x 0.6m chest of drawers. 1.5m x 0.6m x 4.8m wardrobe. Bedside tables, Aircon; 9,000Btu/hr chw 1x20 SSO. 413A SSO socket outlet. Lighting point c/w light fitting Ceiling fan Dustbin, 3.2. Living Room (min. 36m* each): 1 living room based on 3 bedroom per house 3 seaters timber sofa with foam rubber cushions and covers. ‘Timber armchairs with foam rubber cushions and covers. Timber coffee table with glass top 1.2m x 0.4m Timber side tables. 0.9m x 0.3m x 1.2m glass fronted bookcase. Dining table to seat 8 Dining chairs. Aircon; 12,000Btu/hr chw 208 SSO. 13A SSO socket outlet. Lighting point c/w light fiting Ceiling fan. 3.3 Kitchen (min. 10m? each): 1 kitchen based on 3 bedroom per house 0.5 cum refrigerator with operate compartment for freezer. Fully automatic washing machine. 0.5 cum fitted cupboard spac. 4 burner gas stove with gril 3.3 Kitchen (min, 10m? each) (Cont'd) 4 ion band on 3 bedoom QUANTITY 12 2 2 2 24 2 36 2 2 2 ‘Specifeaton of Particular Application = Section t Page-15 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD ‘(Package B3: Proposed Batang Lupa Bridge No, 2 at Sri Aman Town, Sr Amen Divison) ‘TABLE AD1F.3 - LIST OF FURNITURE, FITTINGS APPLIANCES AND EQUIPMENT FOR STAFF ITEM FURNITURE, FITTINGS, APPLIANCES AND EQUIPMENT 34 QUARTERS Gas oylinder. Dustbin, Electric Kettle 18A SSO socket outlet Lighting point c/w light fitting Kitching Sink. Foldable Stainless Steel Clothes Hanger. Toilets and Bathrooms (Min. 2 toilets and 1 bathrooms per quarter; min. total area of 8m? for each quarter): Water closet pedestal type c/w toilet roll holder. ‘Wash basin ‘Wall mirror. Towel rail Shower fitting ‘Shower curtains. Sink. Water heater with pump. Lighting point c/w light fitting, RAL REQUIREMENTS ‘min 1 bath room & 2 toilet per house TABLE AD1F.4- LIST OF OFFICE EQUIPMENT QuanriTy 8 4 4 16 12 eR ee ee oo Speciation of Particular Applicaton ~ Section T Page=20 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Luper Bridge No.2 at Sri Aman Town, Sti Aman Division) ITEM OFFICE EQUIPMENT QUANTITY 41 Desktop/laptop computer 7 Desktop 4 Laptop 17 processor, HDD 1TB hard disk, RAM 8GB DDR4, dedicated 4GB graphic card Operating system Window 10 preloaded complete with licensed Microsoft Office Software (latest version of Microsoft Office and Anti-Virus), DVD RW drive, LAN connestivity, Cordless keyboard, mouse & pad, Auto voltage regulator & UPS. 3 years Global Warranty. ‘Int. Computer for PMC to be installed with licensed AutoCAD (latest version). 4.2 Photocopier ~ printing up to A3 size paper 2 Memory Capacity 4GB Hard Disk Capacity: Optional: 160GB or larger (Usable space: 128GB) Color Capacity: Full Color Scanning Resolution: 600 x 600 dpi Printing Resolution: 4200 x 2400 dpi (High Resolution Photo) 600 x 600 dpi (Text/Text-Photo/Photo/Map) Original Size: Maximum of 297 x 432 mm (A3, 11 x 17") for both sheet and book Continuous Copy Speed: [C2275] BIW:25ppm (AA), Color:25ppm (BS); {C2275] BIW:19ppm (A4 / BS), Color. 19pm; {C2275] BIW:16ppm (B4), Color: 1éppm; and [C2275] BIW:14ppm (A3), Color:14ppm Duplex Feeding Speed: B/W:25ppm, Color:25ppm (A4). ‘Supply of A3 and A4 size papers as and when required by the S.O. and his representatives. 43 Projector 4 Projector with minimum 15-pin VGA and HDMI Video/Audio Input - LCD technology, minimum 3500 lumens of equal colour and white brightness, ‘widescreen native WUXGA (1920x1200) full HD resolution, zoom lens ratio 4.60:1, contrast ratio 15000:1, 2 x HDMI multiple A/V devices includes 1XMHL- enabled port 44° Drone 1 Video resolution at least 4K, Up to 30 minutes flight time, At least up to 7 km transmission range, Two (2) extra high capacity battery, Charging hub, 3D mapping software and Training, 4.5 Mobile Phone 10 ‘Smart Phone, 128GB Memory, with 20MP Camera, battery charger, ear phone and accessories. The monthly bill for mobile phone usage shall be limited to RM150.00 per month for each mobile phone. ‘Specifcation of Paricuar Application = Section 1 Page=2i PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAIWAK SECOND TRUNK ROAD (Package B3; Proposed Batang Lupar Bridge No.2 Bridge Al Sr Aman Town, Sri Aman Division) SPECIFICATION OF PARTICULAR APPLICATION SECTION 2 - EARTHWORKS Table of Contents tem Description 24 SUB-SECTION °2.1.1.3— Stripping Topsoil" 22 SUB-SECTION "2.1.2.1 - Areas to be Cleared” 2.3 SUB-SECTION *2.1.2.3 - Top Soil” 24 SUB-SECTION *2.2.1(d) - Unsuitable Materials” 25 SUB-SECTION °2.2.1(f) Rock” 26 ‘SUB-SECTION “2.2.3.1 — Dimensional Tolerances" 27 ‘SUB-SECTION "2.2.3.6 — Widening Cuts" 28 SUB-SECTION ‘2.2.3.8 - Storage and Handling of Explosives” 29 SUB-SECTION *2.2.3.10 - Safety Measures” 2.10 SUB-SECTION ‘2.23.11 - Insecure Material” 2a SUB-SECTION °2.2.4.1 — Material” 2.12 SUB-SECTION ‘2.2.4.2 - Borrow Pits” 2.13 SUB-SECTION ‘2.2.4.3 - Placement of Fill Material” 2.14 SUB-SECTION "2.2.4.4(d) - Field Density Testing’ 2.15 SUB-SECTION *2.2.4.4(e) - Moisture Controf* 2.16 SUB-SECTION *2.2.5 — Rock Fill Embankment” 247 SUB-SECTION *2.2.6.4 ~ Monitoring Records” 2.18 SUB-SECTION "2.2.7 - Subgrade” 2.19 SUB-SECTION “Protective Vegetation for Erosion Control” ‘Specification of Paroular Apacation (Rev.0) PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package BS: Proposed Batang Lupar Bridge No.2 Bridge Al Sri Aman Town, S1i Aman Division) SECTION 2 - EARTHWORKS ‘The followings serve to add, delete, amend, replace or clarify Section 2: Earthworks, document JKR/SPJ/2013-S2 (JKR 21300-0046-13) and Addendum No. S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997. 24 ‘SUB-SECTION “2.1.1.3 - Stripping Topsoil” 2.1.1 The amendment shown in Addendum No. S-1 (Rev. 1) to Jabatan Kerja Rava Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) tober 1997 remains applicable. 22 ‘SUB-SECTION “2.1.2.1 - Areas to be Cleared” 224 Delete the first and second paragraphs and substitute by "Area to be cleared shall ‘extend for the whole construction zone to a limit of Sm beyond the cut and fill batter line." 22.2 The amendment shown in Addendum No. S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 remains applicable. 23 SUB-SECTION “2.1.2.3 - Top Si 23.4 Insert the following at the end of the existing sub-sections: "Topsoil stockpiles shall on no account be consolidated or trafficked by heavy machinery. They shall be kept completely separate from stockpiles of other materials and shall be kept free of noxious weeds by removing seedheads before maturity and by the use of approved chemical weedkillers." 24 ‘SUB-SECTION “2.2.1(d) - Unsuitable Materials” 2.4.1 Replace the words “which is clay having a liquid limit exceeding 80% andlor a plasticity index exceeding 55%;" with the words “which is clay having a liquid limit exceeding 70% and/or a plasticity index exceeding 35%" 25 SUB-SECTION “2.2.1(f) Rock” 2.5.1 Only the amendment (i) shown in Addendum No. $-1 (Rev. 1) to Jabatan Keria Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 remains applicable. 26 ‘SUB-SECTION “2.2.3.1 - Dimensional Tolerances” 2.6.1 The amendment shown in Addendum No. S-1 (Rev. 1) to Jabatan Kerja Raya ‘Speciation of Paricular Application ~ Section 2 (Rev.0) Page -1 PROPOSED CONSTRUCTION AND COMPLETION OF THE SARAWAK SECOND TRUNK ROAD (Package B3: Proposed Batang Lupar Bridge No.2 Bridge At Sri Aman Town, Sci Aman Division) 27 274 28 2.84 2.9 2.9.1 2.9.2 2.40 2.10.1 244 2.41.4 2.42 2424 Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 remains applicable. ‘SUB-SECTION “2.2.3.6 — Widening Cuts” The amendments (i), (il) and (li) shown in Addendum No. S-1 (Rev. 1) to Jabatan Keria Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 remain applicable. SUB-SECTIO! 2.3.8 - Storage and Handling of Explosives” Insert the sentence "Detonators and explosives shall be transported in separate vehicles. at the end of first paragraph. SUB-SECTION “2.2.3.10 - Safety Measures” In the first paragraph starting on the second line replace the words "Where necessary............ 0M OF off Site" with the following: "The Contractor shall determine the danger zone likely to be created and by adherence to proper safety distances and the use of heavy blasting mats where necessary to prevent the dispersal of material, and/or as directed by the S.O., shall ensure that no damage is caused to persons or property on or off the Site. Prior to blasting, clear and adequate warning signs shall be placed at appropriate locations to indicate the danger zone during the blasting operations.” Insert the following at the end of the sub-section: "The blasting shall be preceded by adequately given waming and the area shall be thoroughly cleared and cordoned off. A siren or other approved warning signal shall be sounded at approved intervals before blasting commences and all workmen are to be informed of the interval between the final siren and the first blast.” SUB-SECTION “2,2.3.11 - Insecure Material” Starting on the fifth line replace the words "shall excavate any a solid face" with the words “shall excavate any insecure material and cover the areas of material subject to weathering with sprayed concrete as specified and shown on the Drawings.” SUB-SECTION “2.2.4.1 — Material” The amendment shown in Addendum No. S-1 (Rev. 1) to Jabatan Kerja Raya Standard Specification for Road Works (JKR/SPJ/1988) (For use in JKR Road Contracts in Sarawak) October 1997 remains applicable. SUB-SECTION “2.2.4.2 - Borrow Pits” ‘The second sentence is replaced by "No designated borrow pits are shown on the Drawings. The Contractor shall be responsible to locate his own borrow pits”. ‘Specification of Particular Application - Section 2 (Rev. 0) Page -2

You might also like