Professional Documents
Culture Documents
M1379 Inc0100
M1379 Inc0100
1.Engineering
2.BOM
3.ECN
4.Genric Flow
Table of Contents
1. Basic Setups...................................................................................................3
1. BOM Parameters............................................................................................3
2. Resource Creation..........................................................................................3
3. Creation of a Department...............................................................................4
4. Routings..........................................................................................................5
2. Engineering...................................................................................................6
1. Engineering BOM..........................................................................................6
2. Item Whereused..............................................................................................6
3. Transfer of Bill...............................................................................................7
4. Change types..................................................................................................8
5. Approval List..................................................................................................9
6. Autonumbering...............................................................................................9
7. ECO Department..........................................................................................10
3. Engineering Change Order.......................................................................10
4. DELETE GROUP......................................................................................15
5. WIP Setup...................................................................................................16
1. WIP Parameters............................................................................................16
2. Accounting Class..........................................................................................18
3. Creation of Standard Job..............................................................................18
4. Release Job...................................................................................................19
5. Move Transaction.........................................................................................19
6. WIP Completion...........................................................................................20
7. Material Transaction.....................................................................................20
8. Closure of Job...............................................................................................21
1. Basic Setups
1. BOM Parameters
2. Resource Creation
Bill->Routings->Resources
Here we can give Cost rate for Person Resource
3. Creation of a Department
2. Engineering
1. Engineering BOM
Creating a bill of material for the Assembly
Material Control for how the material want to backflush
2. Item Whereused
We can find the Usage of different Item in different BoM
3. Transfer of Bill
Tools->Transfer Bill
Transferring Bill from Engineering to BOM
4. Change types
Define Change type for Change Order
Engineering-> Setup-> Changetype
5. Approval List
Define Approval List for Approval of Change Order
Engineering->Setup->Approval Liat
6. Autonumbering
Define Autonumbering for ECO at Specific Inventory and User level
7. ECO Department
Here we define the Department for ECO as an Organisation
Engineering->Setup->ECO Department
Engineering Order
It is an document for defining and correcting BOM and Routings
We can also Schedule the Changes and enable auto implement the BOM
Click Tools and Implement Bill
ECO got implemented at BOM
We can see the Revised Routing after implementing the ECO
1. Delete Group
Delete Group is the function used to delete components, assembly, subassembly
used in BOM
4. Work in Process
1. WIP Parameters
2. Accounting Class
6. WIP Completion
Once we complete all Operations and final Assembly is prepared we transfer to
the sub inventory by WIP Completion
7. Material Transaction
Material Transaction when completing the Job
8. Closure of Job
Click Tools-> Close
Finally Job has Closed
Lenovo Inv2
Report Date: 20-DEC-2023 16:51
Discrete Job Value Report
Page: 1 of 1
Summary (INR)
Sort by: Job
Period-To-Date Summary
----------------------
Variances Variances
Element/Variance Accounts Costs Incurred Costs Relieved
Relieved Relieved Period Activity
--------------------- ------------------------- ---------------- ----------------
---------------- ---------------- ----------------
Material 2.10.1410 70,000.00 70,000.00
0.00 0.00
Material Overhead 2.10.1472 0.00 0.00
0.00 0.00
Resource 2.10.1474 2,000.00 2,000.00
0.00 0.00
Outside Processing 2.10.1475 0.00 0.00
0.00 0.00
Overhead 2.10.1473 0.00 0.00
0.00 0.00
Material Variance 2.10.9554
0.00
Resource Variance 2.10.7667
0.00
Outside Process Var 2.10.6688
0.00
Overhead Variance 2.10.8767
0.00
---------------- ----------------
---------------- ---------------- ----------------
Total Costs: 72,000.00 72,000.00
0.00 0.00 0.00
================ ================
================ ================ ================
Cumulative-To-Date Summary
--------------------------
Variances Variances
Element/Variance Accounts Costs Incurred Costs Relieved
Relieved Relieved Period Activity
--------------------- ------------------------- ---------------- ----------------
---------------- ---------------- ----------------
Material 2.10.1410 70,000.00 70,000.00
0.00 0.00
Material Overhead 2.10.1472 0.00 0.00
0.00 0.00
Resource 2.10.1474 2,000.00 2,000.00
0.00 0.00
Outside Processing 2.10.1475 0.00 0.00
0.00 0.00
Overhead 2.10.1473 0.00 0.00
0.00 0.00
Material Variance 2.10.9554
0.00
Resource Variance 2.10.7667
0.00
Outside Process Var 2.10.6688
0.00
Overhead Variance 2.10.8767
0.00
---------------- ----------------
---------------- ---------------- ----------------
Total Costs: 72,000.00 72,000.00
0.00 0.00 0.00
================ ================
================ ================ ================
5. Accounting Entries
2.10.1474 WIP Resource Value -2000 Lenovo K15 WIP Completion WIP valuation
Inventory Resource Inventory
2.10.1440 Value 2000 Lenovo K15 WIP Completion valuation
2.10.1410 Inv Material Value -70000 Lenovo K15 WIP Completion WIP valuation
Inventory
2.10.1410 Inv Material Value 70000 Lenovo K15 WIP Completion valuation
2.10.1410 Inv Material Value -25000 K15 6.5 Inch Display WIP Issue Inv valuation
2.10.1410 Inv Material Value 25000 K15 6.5 Inch Display WIP Issue WIP Valuation
K15 50MP+2Mp
2.10.1410 Inv Material Value -10000 Camera WIP Issue Inv valuation
K15 50MP+2Mp
2.10.1410 Inv Material Value 10000 Camera WIP Issue WIP Valuation
2.10.1410 Inv Material Value -15000 K15 4GB Ram 64GB WIP Issue Inv valuation
2.10.1410 Inv Material Value 15000 K15 4GB Ram 64GB WIP Issue WIP Valuation