MS Repair File
SWPP 52
Descrip on
There is a pile in the seawater intake pump house. The pile number is SWPP 52. In this pile,
spiral reinforcement can be seen. Therefore, we have proposed to remove loose par cles and
use construc on mortar (grout) to fill the gap.
We are reques ng you to approve this method to overcome this error.
Method
Remove loose par cles.
Here we remove loose par cles such as bentonite concrete, mud, and granular materials (sand,
clay, gravel). removal methods,
Casing
Applying construc on grout or mortar.
We prepare the construc on grout mixture as per recommended specifica ons, ensuring
proper propor ons and thorough mixing for desired consistency. U lize an appropriate grout
pump or injec on system to inject the grout from the bo om of the casing, gradually filling the
space between the casing and the pile. Monitor grout flow to ensure uniform distribu on within
the casing's annular space. Regularly check the grout level to confirm it reaches the exact cutoff
level, at least 1.3 meters below, ensuring effec ve and precise grou ng.