PROFILE SNAPSHOT

A dynamic professional with over 13 years7 Months of experience in:


~Client Coordination ~Site Operations
~Working Quantity Estimation ~Planning

CAREER OBJECTIVE:
To pursue a highly challenging and a creative career, where I can apply my existing knowledge and
creativity, acquire new skills and contribute effectively to the growth of the organization.
 Proficient in managing Civil engineering & Estimation activities while working in close coordination
with team members, engineers& architects.
 Gained insightful experience in coordinating multiple projects while meeting design needs in a fast
paced, dynamic & globally expanding MNC environment.
 Resourceful in participating in technical discussions, developing & updating new specifications, issuing
instructions for corrective actions by recommending cost effective and value added engineering solutions.

PROJECT MANAGER - JAL JEEVAN MISSION (JJM) – CLIENT: RWS&S DEPARTMENT, AP.
The Mission was launched by honorable Prime Minister Sri Narendra Modi on August 15, 2019.
Jal Jeevan Mission, is envisioned to provide safe and adequate drinking water through individual
household tap connections by 2024 to all households in rural India. The programme will also implement
source sustainability measures as mandatory elements, such as recharge and reuse through grey water
management, water conservation, rain water harvesting. The Jal Jeevan Mission will be based on a
community approach to water and will include extensive Information, Education and communication as a
key component of the mission.

SEP 2019 to till now: - Voyants Solution Pvt Ltd

 My Job Roles:

o Drinking Water Supply Project (Mission Bhagiratha).


. Cost analysis and Sub-contractor billing.
 Preparation of work permits, safety, project documentation.
 Execution of DI,MS,UGD Pipe Laing and jointing ,testing
 Preparing Weekly and monthly planning and DPR
 Preparation of micro schedules on weekly basis according to the sequential activities
 Training the subordinates technically and also enhancing their behavioral and communicational
skills.
 Liaising with Project Managers and Client officials at site level regarding drawing approvals.
1. Assigning execution team:
2.
 Select the optimum team and decide phase wise posting in line with work requirement.
 Understand team’s skill and competency and assigning the job roles accordingly.

3. Mobilization:
 Finalize the mobilization plan in concurrence with higher authorities (client / consultant / HO)
depending on the size and time span of the project and support the mobilization team to execute
the same in a time bound manner.
 Finalize the staff quarters and transportation requirement and accordingly support Mobilization
and HR team to take action.
 Coordinate and follow up for all statutory compliances as per the requirement of the contract /
project to kick start the project work. Timely escalation of issues if any.
 Managing local interferences and maintaining harmonious relationship with all stakeholders.
 Ensure expeditious and optimized mix design within the framework of specifications.

4. Planning and Execution


 Study Baseline schedule with HO planning and accountable for preparing the schedule on a weekly,
monthly and quarterly basis.
 Accountable for delivering site progress in line with the agreed schedule.
 Accountable for arranging the required resource and managing the same to achieve the project
targets.
 Implementing the work program with daily monitoring and extending support by bridging the gap.
 Accountable for timely updating and monitoring of all reports to various stakeholders in the
project.
 Timely coordination with clients, architects, Structural consultants, MEP consultants from drawing
related issues to site implementation/modification.
 Accountable to ensure preparation of Overall Planning including availability of GFC drawings of the
project in line with contractual requirement and get the same approved from Client.
 Finalize format of Daily Progress Report and ensure submission of the same to client and all stake
holders highlighting critical points and any delays if any.
 Keep track of the client inputs with respect to contractual commitments.
 Assist the GM with appropriate documents to seek requisite time extension with commercial
settlement whenever applicable during the course of execution of the project.
5. Estimation and Billing
 Accountable for timely estimation of quantities from all available drawings to plan resources in
advance.
 Accountable for timely submission of bills and realization of the payments from clients.
 Accountable for exploring the non-tender item and its realization.
 Ensure submission of Rate Analysis for any Non Tender item required to be executed as per
approved drawings. Make sure the rate is approved prior to execution of the work and amendment
issued.
6. Quality Assurance and Control
 Accountable for adherence to the quality plan of the project.
 Implementation of quality protocols at site to ensure zero defects.

7. Safety
 Accountable for adherence to the safety plan of the project.
 Implementation of safety protocols at site to ensure zero tolerance.

8. Budgeting & Monitoring:


 Support in finalization of budget with internal stakeholders.
 Monitor monthly expenditure and ensure that it is under budgetary limits.
 Ensure monthly reconciliation of all major input materials and keep the wastage within specified
limits.

9. Sub-Contractor Management:
 Provide the inputs to HO for 3rd party works and material supply by raising purchase request
through planning and keep a regular check on the available material in stores.
 Monitor labor supply contractors for adequate manpower supply and ensure that weekly
allowances to workers and bills are processed.
 Monitor third party works for timely supply and release of fronts in line with project schedule.
 Productivity mapping of all works in progress.
 Ensure timely certification and submission of GRN and bills to HO.
 Monitor proper storage, preservation and use of bought-out materials.

10. Special jobs and innovative approach:


 Have focus on special jobs requiring specialized agencies and equipment. Get the team aligned on
the common understanding for these structures and promote innovative approach in the interest
of organization.
 Implement new methodologies for improving productivity and cost optimization wherever
possible. Encourage team members to come up with such ideas and put to use after brainstorming.
 Induce client by underlining time and quality advantage for use of pre-cast and pre-fabricated
products by suggesting alternate items in BOQ so as to improve timelines and workmenship.

11. Team Building:


 Align team with common goal and inculcate spirit of team work.
 Use work in hand to impart technical and practical knowledge to improve productivity and quality
through daily discussion at sites.
 Have regular interactions with the team members and identify area for training to improve their
performance.
Training and developing immediate subordinates for the next role

ORGANIZATIONAL EXPERIENCE
GAJA Engineering Private Limited asa PROJICT MANAGER
Key Result Areas
SEP 2015 to Aug-2019: Dpm :- Gaja Engineering Pvt .Ltd. Hyderabad
 Gaja Engineering Private Ltd. Company specializing mainly in Drinking Water Schemes and also
involved in Irrigation and Electrical projects across India.

 My Job Roles:

o Drinking Water Supply Project (Mission Bhagiratha).


. Cost analysis and Sub-contractor billing.
 Preparation of work permits, safety, project documentation.
 Execution of DI,MS,UGD Pipe Laing and jointing ,testing
 Preparing Weekly and monthly planning and DPR
 Preparation of micro schedules on weekly basis according to the sequential activities
 Training the subordinates technically and also enhancing their behavioral and communicational
skills.
 Liaising with Project Managers and Client officials at site level regarding drawing approvals.

Mega Engineering & Infrastructures Ltd. (MEIL) as Engineer


Key Result Areas

January 2011 – April 2015: senior Engineer- Megha Engineering Infrastructures Ltd. Hyderabad
 Megha Engineering Infrastructures Ltd. Company specializing mainly in water projects and also UGD
projects across India.

 My Job Roles:

 Site execution:
. I had executed the construction of Sewerage network& water supply distribution network
Hyderabad Sewerage Projects. in rajendranagr in Hyderabad Under JNNURM & HMWSSB&SB
. Cost analysis and Sub-contractor billing.
 . Preparation of work permits, safety, project documentation.
 Execution of DI,MS,UGD Pipe Laing and jointing ,testing
 Preparing Weekly and monthly planning and DPR
 Preparation of micro schedules on weekly basis according to the sequential activities
 Training the subordinates technically and also enhancing their behavioral and communicational
skills.
 Preparing detailed report and drawings for approvals and execution.
 Liaising with Project Managers and Client officials at site level regarding drawing approvals .

IVRCL . JE . Engineer
Key Result Areas

May 2009 –January2011: JR Engineer IVRCL , Bangalore, & vizg. Sewerage network & water supply
My Job Roles:
 Preparation of work permits, safety, project documentation.
 Execution of DI,MS,UGD Pipe Laing and jointing ,testing
 Preparing Weekly and monthly planning and DPR
 Preparation of micro schedules on weekly basis according to the sequential activities
 Training the subordinates technically and also enhancing their behavioral and communicational
skills.

EDUCATION
2009 B tech in Civil Engineering ( JNTU Kakinada ) AP with 78%
2005 XII from Board of Intermediate Education, AP with 77%
2003 X from Board of Secondary Education, AP with 60%
IT SKILLS
 Software Programs: Staad Pro, , AutoCAD 2d & Ms Office.
 Operating Systems: Windows 7 & 8 XP

EXTRA CIRCULAR ACTIVITIES


 N.C.C. : “C” Certificate

 Sports :3 Times playing football Game in National Games , University playing and
District levee

PERSONAL DETAILS
Name : A Venkateswarlu
Date of birth : 22 02.1988
Father’s name : A Vengaiah
Native place : Vijayawada, AP
Nationality : Indian.
Languages known : Telugu, English, Hindi, Kanada
Marital Status Marred

DECLERATION:
I hereby declare that the above information furnished is true and correct to the best of my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.

A Venkateswarlu

You might also like