The document provides information on estimating costs for footings and foundations, including:
- Types of footings include spread, strap, combined, strip, mat, and pile footings.
- Layout designs and earthwork calculations are shown for footing locations. Total earthwork volume is estimated to be 10,188 cubic feet.
- Calculations are shown for brick soling requirements and costs. Total bricks needed are estimated to be 3,396 bricks at a cost of 30,564 tk.
- Reinforced concrete mixing designs and calculations are provided for footing casting. Total cement required is estimated to be 363 bags, sand is 680 cubic feet, and stone is 1359 cubic feet, for a total
The document provides information on estimating costs for footings and foundations, including:
- Types of footings include spread, strap, combined, strip, mat, and pile footings.
- Layout designs and earthwork calculations are shown for footing locations. Total earthwork volume is estimated to be 10,188 cubic feet.
- Calculations are shown for brick soling requirements and costs. Total bricks needed are estimated to be 3,396 bricks at a cost of 30,564 tk.
- Reinforced concrete mixing designs and calculations are provided for footing casting. Total cement required is estimated to be 363 bags, sand is 680 cubic feet, and stone is 1359 cubic feet, for a total
The document provides information on estimating costs for footings and foundations, including:
- Types of footings include spread, strap, combined, strip, mat, and pile footings.
- Layout designs and earthwork calculations are shown for footing locations. Total earthwork volume is estimated to be 10,188 cubic feet.
- Calculations are shown for brick soling requirements and costs. Total bricks needed are estimated to be 3,396 bricks at a cost of 30,564 tk.
- Reinforced concrete mixing designs and calculations are provided for footing casting. Total cement required is estimated to be 363 bags, sand is 680 cubic feet, and stone is 1359 cubic feet, for a total
Total Area = (36+65+49+48+100+60+81+540+153)= 1132 sft
So, 1132 sft soling Bricks need = (1132 sft*3 nos.) = 3396 nos. Total Cost = (3396*9 tk) = 30,564 tk (variable) Brick flat Soling or CC casting…. • Picture R.C.C calculations of Footings…. • Mixing Design : Concrete mix design is the process of finding right proportions of cement, sand and aggregates for concrete to achieve target strength in structures. So, concrete mix design can be stated as Concrete Mix = Cement : Sand : Aggregates