R & M WORKS UNDER 74.110(R&M TO PLANT AND MACHINERY) TO BE TAKEN UP DURING FY 2020-21
Rs in Lakhs
SL NO Name of the station,
Nomenclature Cost
voltage class & division
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Jun-20
Estimate of transil oil for topping up of 100MVA Power
1 KOLAR transformer -I, II & iii & 20MVA Power transformer II at 0.06
220kv kolar
Estimate for topping up and overhauling of OLTC divertor
2 KOLAR swtich 12.5MVA NGEF make P.Tr. No-1 at 66/11KV S/S 0.47
Yeldur
Estimate for repair & topping up and overhauling of OLTC
3 KOLAR divertor swtich of EASUN-MR Make of 8MVA INDO Tech 0.37
make P.Tr. No-1 at 66/11KV S/S Somayajahalli
Estimate for repair & overhauling of OLTC divertor swtich of
4 KOLAR NGEF Make of 12.5MVA P.Tr. No-1 at 66/11KV S/S 0.46
Mulbagal
Estimate for repair & overhauling of OLTC divertor swtich
5 KOLAR of 12.5MVA Andrewyule Make of P.Tr. No-1 at 66/11KV 0.46
S/S Addagal
Estimate for repair & overhauling of OLTC divertor swtich of
6 KOLAR 0.44
31.5MVA P.Tr. No-1 at 66/11KV S/S Narasapura
Estimate for transformer oil for topping up of power
7 KOLAR 0.01
transformer - 1&2 at 66/11KV S/S Avani
Estimate for transformer oil for topping up of power
8 KOLAR 0.01
transformer - 1&2 at 66/11KV S/S Sugatur
Estimate for transformer oil for topping up of power
9 KOLAR 0.01
transformer 1&2 at 66/11KV S/S Lakshmipura
Topping up of Transil oil for Transformer 1 & 2. (4 Barrels)
10 KOLAR 0.72
at Masthi S/S
TOTAL 3.02
Jul-20
Estimate for repair & overhauling of OLTC divertor swtich of
11 KOLAR 0.44
31.5MVA P.Tr. No-2 at 66/11KV S/S Narasapura
Estimate for repair & overhauling of OLTC divertor swtich
12 KOLAR and topping up transil oil of 8MVA SPEC MAKE PTR-2 at 0.37
66/11KV S/S H.Gollahalli
Estimate of transil oil for topping up of power transformer -1
13 KOLAR 0.01
at 66/11KV S/S Byrakur
Estimate of transformer oil for topping up of power
14 KOLAR 0.02
transformer -1&2 at 66/11KV S/S Nangali
Estimate for overhauling of OLTC/Divertor switch and
15 KOLAR topping up oil og NGEF make of 12.5 MVA Power 0.74
transformer-1 at 66/11KV S/S Vemgal
Estimate for transformer oil for topping up of power
16 KOLAR 0.01
transformer 1&2 at 66/11KV S/S Dalasanur
Estimate for transformer oil for topping up of 8MVA power
17 KOLAR 0.02
transformer 1&2 at 66/11KV S/S Kembodi
Rs in Lakhs
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Estimate for topping up of transil oil of 1x8MVA NGEF make
36 KOLAR power Transformer-1 at 66/11kV sub station, KGF in KGF 0.02
Nodal Centre, SMD, Malur
Estimate for topping up of transil oil, repair and overhauling
of OLTC divertor switch of 1x12.5MVA NGEF make power
37 KOLAR
Transformer-2 at 66/11kV sub station, KGF in KGF Nodal 0.33
Centre, SMD, Malur
Estimate for topping up of transil oil, repair and overhauling
of OLTC divertor switch of 1x12.5MVA NGEF make power
38 KOLAR
Transformer-3 at 66/11kV sub station, KGF in KGF Nodal 0.33
Centre, SMD, Malur
Estimate for crane hiring charges required for repir &
39 KOLAR overhauling of OLTC divertor switch of 66/11kV 1X12.5MVA 0.10
NGEF PTR-3 at 66/11kV KGF S/S
Estimate for crane hiring charges required for repir &
40 KOLAR overhauling of OLTC divertor switch of 66/11kV 1X12.5MVA 0.10
NGEF PTR-2 at 66/11kV KGF S/S
TOTAL 2.41
Sep-20
Estimate for topping up of oil to conservator tank, filtration
of transil oil and repair & overhauling of OLTC divertor
41 KOLAR switch of 66/11kV, 1x12.5MVA EMCO make PTR-1 at 0.33
66/11kV MUSS Kamasamudra, KGF Nodal Centre, SMD,
Malur
Estimate for topping up of oil to conservator tank, filtration
of transil oil and repair and overhauling of OLTC divertor
42 KOLAR switch of 66/11kV, 1X 12.5MVA Andrew Yule make PTR-2 0.32
at 66/11kV MUSS Kamasamudra , KGF Nodal Centre, SMD,
Malur
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Estimate for topping up of oil in PTR-1 and PTR-2 at
63 KOLAR
66/11kV MUSS Masthi, SMD, Malur 0.01
64 KOLAR Estimate for oil Barrel for topping up of oil in PTR-1, PTR-2 0.01
and PTR-3 at 66/11kV Station Malur in SMD, Malur
Estimate for supply of two nos. of EHV grade Transformer oil
65 KOLAR steel barrels of 210 litres capacity at 66/11kV Station, Tekal 0.02
in SMD, Malur
Estimate for oil barrel topping up of oil in PTR-1 and PTR-2
66 KOLAR
at 66/11kV station, Lakkur in SMD, Malur 0.01
67 KOLAR Transformer overhauling at 66/11KV Masthi S/S 1.00
Total 2.05
Dec-20
Arresting oil leakage of 100MVA Power transformer-3 in the
68 KOLAR 1.00
OLTC Motor shaft 220/66/11 KV R/S Kolar
Topping up of Transil oil for Transformer 1 & 2. (4 Barrels)
69 KOLAR 0.72
66/11 KV Kyalanur
70 KOLAR Silica Gel 66/11 kV Narasapura 0.05
Reparing of cooling fans of 20MVA-1 66/11kV MUSS
71 KOLAR 0.30
Addagal
72 KOLAR Pothead 11kV 1X1000 Sq.mm Indoor & Outdoor at 66/11kV Tekal S/S 0.08
TOTAL 2.15
Jan-21
Topping up of Transil oil for Transformer 1 & 2. (4 Barrels)
73 KOLAR 0.75
66/11 kV Tamaka
74 KOLAR Silica Gel 66/11 KV Kyalanur 0.05
11kV Heat Shrinkable type termination kit for XLPE cable,
75 KOLAR 1*1000sq.mm, Indoor & Outdoor Pothead 66/11 kV 0.07
Narasapura
76 KOLAR Topping up of transil oil 66/11kV MUSS MN Halli 0.50
77 KOLAR Silica Gel 66/11 kV MUSS Yeldur 0.05
Painting of PTR-1 and PTR-3, Oil Leakage arresting in PTR3,
HV Bushing replacement for PTR-2(Y, B phase), PTR1(Y
78 KOLAR phase) and PTR3(Y phase), Oil leakage arresting at 11kV 3.00
bushing of PTR1(B phase) and PTR3(R phase), Supplying of
Silica gel at 66/11kV Malur S/S
79 KOLAR Painting of PTR-1 and PTR-2 at 66/11kV Lakkur S/S 0.50
80 KOLAR Painting of PTR-2 at 66/11kV Tekal S/S 0.08
TOTAL 5.00
Feb-21
Pad clamps for HV LV Bushings of Power Transformer 1&2
81 KOLAR 0.35
66/11 KV Kyalanur
11kV Heat Shrinkable type termination kit for XLPE cable,
82 KOLAR 1*1000sq.mm, Indoor & Outdoor Pothead. 66/11 kV MUSS 0.07
Yeldur
Total 0.42
Mar-21
Rs in Lakhs
Name of the
SL NO station, voltage Nomenclature Cost
class & division
Sep-20
1 Maintanance Materials 5.00
Total 5.00
Oct-20
2 Malur-KGF 66KV Intermediate Tower 1.00
3 lakkur tap 66KV Intermediate Tower 1.00
Total 2.00
Nov-20