NO NUMBER SURAT
1 GMP/HEK/CRW/NB/X-2023/002
2 GMP/HEK/CRW/NB/XII-2023/008
3 GMP/HEK/CRW/NB/XII-2023/012
4 GMP/HEK/CSF/NB/XII-2023/004
5 GMP/HEK/CF/AB/XII-2023/001
6 GMP/HEK/CRW/NB/XII-2023/007
7 GMP/HEK/CSF/NB/XII-2023/005
8 GMP/HEK/CSF/UB/XII-2023/001
9 GMP/HEK/CRW/NB/XII-2023/010
10 GMP/HEK/CRW/NB/XII-2023/013
11 GMP/HEK/CF/NB/XII-2023/002
12 GMP/HEK/CRW/NB/XII-2023/011
13 GMP/HEK/CSP/NB/XII-2023/008
14 GMP/HEK/CSF/UB/XII-2023/002
15 GMP/HEK/RW/XII-2023/010
16 GMP/HEK/RW/XII-2023/011
17 GMP/HEK/CSF/NB/XII-2023/006
18 GMP/HEK/CSP/AB/XII-2023/001
19 GMP/HEK/RW/XII-2023/012
20 GMP/HEK/CRW/UB/XII-2023/001
1 GMP/HEK/STX/RCV/NB/XII-2023/001
2 GMP/HEK/STX/RCV/NB/XII-2023/001
3 GMP/HEK/STX/RCV/NB/XII-2023/001
4 GMP/HEK/STX/RCV/NB/XII-2023/001
5 GMP/HEK/STX/RCV/NB/XII-2023/001
6 GMP/HEK/STX/RCV/NB/XII-2023/001
7 GMP/HEK/STX/RCV/NB/XII-2023/001
8 GMP/HEK/STX/RCV/NB/XII-2023/001
9 GMP/HEK/STX/RCV/NB/XII-2023/001
10 GMP/HEK/STX/RCV/NB/XII-2023/001
11 GMP/HEK/STX/RCV/NB/XII-2023/001
12 GMP/HEK/STX/RCV/NB/XII-2023/001
13 GMP/HEK/STX/RCV/NB/XII-2023/001
14 GMP/HEK/STX/RCV/NB/XII-2023/001
15 GMP/HEK/STX/RCV/NB/XII-2023/001
16 GMP/HEK/STX/RCV/NB/XII-2023/001
NOMER URUTAN BULAN NOVEMBER - DECEMBER 2023
STATUS
Pekerjaan
DIKIRIM
Checklist retaining wall P10 V (01/12/2023)
Checklist Wall Loading dock X10/Y4-Y6 V (01/12/2023)
Checklist retaining wall Gas Room V (01/12/2023)
Slab Floor Nabota X7'-X10, X1-X10, & X5-X10/Y5'-Y6, Y4'-Y5, & Y3'-Y4 Elv + 1.200 V (05/12/2023)
S1
Checklist Gas Room Animal V (08/12/2023)
Checklist retaining wall P12 (1st Stair) V (01/12/2023)
Slab Floor Nabota X7'-X10, X1-X10, & X5-X10/Y5-Y5', Y4-Y4', & Y3-Y3' Elv + 1.200 V (11/12/2023)
S2
Slab Floor Utility 1st Floor (X1-X6/Y2'-Y4) S1 V (08/12/2023)
Checklist retaining wall P12 (2nd Stair) V (11/12/2023)
Checklist retaining wall P12 (3rd Stair) V (18/12/2023)
Checklist Pondasi Stair Entrance X10/Y1-Y2' V (19/12/2023)
Checklist retaining wall stair Entrance V (19/12/2023)
Cheklist Slab Stair Pit P1 V (18/12/2023)
Slab Floor Utility 1st Floor (X1-X6/Y1-Y2') S2 V (18/12/2023)
Connection road area gate 1 (west nabota left) V (20/12/2023)
Connection road area gate 1 (South Nabota near the park) V (20/12/2023)
Slab Floor 1st Nabota ELV + 1.200 S3 (X4-X10/Y1'-Y2), (X5-X10/Y2'-Y3), &(X5- V (18/12/2023)
X10/Y3'-Y4)
Cheklist Slab Stair P8A V (26/12/2023)
CIVIL FOR ROAD WORK South Road Nabota (Right) & Road Area Gate 1 V (26/12/2023)
Checklist P8A Lantai G-1 V (26/12/2023)
DIKIRIM
Inspection material Steel Structure V (07/12/2023)
V (05/12/2023) V (06/12/2023)
V (08/12/2023) V (11/12/2023)
V (01/12/2023) V (11/12/2023)
V (12/12/2023) V (12/12/2023)
V (08/12/2023) V (14/12/2023)
V (12/12/2023) V (14/12/2023)
V (19/12/2023) V (19/12/2023)
V (19/12/2023) V (20/12/2023)
V (19/12/2023) V (20/12/2023)
V (19/12/2023) V (20/12/2023)
V (19/12/2023) V (20/12/2023)
V (20/12/2023) V (21/12/2023)
V (20/12/2023) V (21/12/2023)
V (20/12/2023) V (22/12/2023)
V (27/12/2023) V (27/12/2023)
V (27/12/2023) V (27/12/2023)
V (26/12/2023) V (28/12/2023)
KEMBALI ERECTION
V (07/12/2023) V (07/12/2023)
V (08/12/2023) V (08/12/2023)
V (09/12/2023) V (09/12/2023)
V (10/12/2023) V (10/12/2023)
V (12/12/2023) V (12/12/2023)
V (14/12/2023) V (14/12/2023)
V (15/12/2023) V (15/12/2023)
V (16/12/2023) V (16/12/2023)
V (20/12/2023) V (20/12/2023)
V (21/12/2023) V (21/12/2023)
V (22/12/2023) V (22/12/2023)
V (23/12/2023) V (23/12/2023)
V (24/12/2023) V (24/12/2023)
V (07/12/2023) V (07/12/2023)
V (27/12/2023) V (27/12/2023)
V (30/12/2023) V (30/12/2023)