Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REKAP TRUCKING PT JAYA PRATAMA BIMADA PERIODE 01-05 Agustus 2023

PT Pionir Beton Industri


Volume Tonase
No No. Ticket Date Order Jasa Buyer No. Plat Transporter Kas
(m3) (ton)

1 44709 02 Agustus 2023 Batu Split Ukuran 1/2 Sunardi PT. Pionir Beton Industri B 9830 SYU Iqbal 24.95 32.84 Rp 500,000

2 44757 03 Agustus 2023 Batu Split Ukuran 1/2 Sunardi PT. Pionir Beton Industri B 9865 NQC Imat 24.15 33.12 Rp 500,000
M3 49.10
Ton 65.96
Kas Rp 1,000,000

REKAP TRUCKING PT JAYA PRATAMA BIMADA PERIODE 01-05 Agustus 2023


PT Dirgantara Aspalindo
Volume Tonase
No No. Ticket Date Order Jasa Buyer No. Plat Transporter Kas
(m3) (ton)

1 44762 03 Agustus 2023 Abu Batu Sunardi PT. Dirgantara Aspalindo D 9138 YV Ginanjar 23.24 30.91 Rp 600,000
M3 23.24
Ton 30.91
Kas Rp 600,000

Buyer Franco Volume Total Franco Kas Sisa Tagihan


PT Pionir Beton Industri Rp 35,000 65.96 Rp 2,308,600 Rp 1,000,000 Rp 1,308,600
PT Dirgantara Aspalindo Rp 55,000 23.24 Rp 1,278,200 Rp 600,000 Rp 678,200
Total 89.20 Rp 3,586,800 Rp 1,600,000 Rp 1,986,800

Disiapkan, Diketahui, Diketahui,

Ujang Maliki Adzkar Ramdhani Sunardi


Sales Superintendent Site Manager PT Jaya Pratama Bimada

You might also like