DEVON

Page 1 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 598 598 4.00 5 2004-3-3
RIG NAME & NO. FOREMAN AFE NO. AUTH MD AUTH TVD API NO.
DEVON ENERGY PANYU 5-1 WILL HEWITT 111179 3,462 2,161 -
LAST CASING NEXT CASING DATE OF LAST SAFETY MEETING LAST BOP PRES TEST INCIDENT IDENTIFICATION
13.375 (in) @ 598.00 (m) 9.625 (in) @ 2,487.00 (m) 2004-3-3 NONE
FIELD NAME LEAKOFF MW WI NRI
PANYU 5-1 8.80 24.50000 24.5000
LITHOLOGY DAILY DRLG DAILY COMP COST DAILY TOTAL COST
84,872 0 84,872
CURRENT STATUS CUM DRLG CUM COMP COST CUM TOTAL WELL COST
M/U BHA. 282,604 0 282,604
24 HR FORECAST AFE DHC AFE COMP COST AFE TOTAL PROJ COST
M/U BHA,RIH, PRESS TEST CSG,DRILL OUT, DISPLACE MU 2,674,361 1,368,356 4,042,717

DAILY OPERATIONAL COMMENTS: INSTALL 13-3/8" CSG HEAD. N/U RISER ADAPTER, RISER, BOP STACK, SLIP JOINT AND BELL
NIPPLE. B/O SCHLUMBERGER POWER DRIVE. PRESSURE TEST BOPS & RALATED DEVICES.

OPERATIONS SUMMARY
FROM TO HOURS PHASE STEP OPER TASK DESCRIPTION
00:00 02:00 2.00 SURF BOPS BOPS CHANGE ELEVATOR BAIL BACK TO DRILL PIPE. L/D RISER.
02:00 04:30 2.50 SURF BOPS BOPS INSTALL FMC13-3/8" SOL *13 5/8" 3M CSG HEAD. TEST SEAL 1800 PSI/ 10
MIN. OK.
04:30 12:00 7.50 SURF BOPS BOPS N/U RISER ADAPTER, RISER AND BOP STACK.
12:00 13:30 1.50 SURF DRLG BHA BREAK OUT SCHLUMBERGER POWER DRIVE FOR PROGRAMMING.
13:30 15:00 1.50 SURF BOPS BOPS INSTALL SLIP JOINT AND BELL NIPPLE.
15:00 20:30 5.50 SURF BOPS BOPS M/U BOP PRESSURE TEST STAND. SET TEST PLUG. PRESSURE TEST
BOP AND ASSOCIATED EQUIPMENT TO 250/3000 PSI FOR 5 MIN,
ANNULAR 250/1500 PSI FOR 5 MIN.
20:30 21:00 0.50 SURF BOPS WLHEAD SET WEAR BUSHING.
21:00 22:00 1.00 SURF DRLG BHA L/D 8" DC & 2 JTS 5" HWDP.
22:00 00:00 2.00 SURF DRLG BHA P/U SCHLUMBERGER'S DIRECTIONAL DRILLING TOOLS, M/U BHA.

NOTE:
0000-0430 - CONT. M/U BHA.SHALLOW TEST POWER DRIVE FOR 10 MIN
& LWD/ MWD FOR 5 MIN. SEPARATELY. INSTALL RADIO ACTIVE
SOURCE INSIDE ADN-8 TOOL.
0430-0600 - RIH W/ REMAINING BHA, DP, DRLG JAR, HWDP, ECT..

DENSITY(ppg) 8.80 PP ECD MUD DATA DAILY COST CUM COST 8,525
FV PV/YP GELS WL/HTHP FC/T.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf Cl Ca H2S LIME ES
55 13/12 4/5 9.00/ / / / 1.00/0.50 0.40/0.40 53,000

MUD VOLUMES (bbl) / ANNULAR VELOCITIES (ft/min)


HOLE PIT 1 PIT 2 PIT 3 PIT 4 TOTAL MUD LOST MUD DUMPED ANN VEL DP ANN VEL DC ANN VEL RISER
0.0 304.0 300.0 300.0 470.0 1,374.0

MATERIALS / CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
DIESEL CU MT 145 CEMENT TONS 68
WATER, DRL BBLS 100 724 BENTONITE TONS 31
BARITE TONS 64 FUEL HELICOPTE LITRE 3,121

PERSONNEL DATA Total POB: 172


COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
WOODGROUP 1 TOTAL ON BOARD 86

Printed: 2005-11-1 10:43:54


DEVON
Page 2 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 598 598 4.00 5 2004-3-3

PERSONNEL DATA Total POB: 172


COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
GEOSERVICES 5 COSL CEMENTER 1
DEVON ENERGY PROD 16 DEVON ENERGY DRLG 3
SLC 13 COSL DRLG 33
OILTOOL 1 BHI MUD 2
FMC SCHLUMB 5
ROTARY 2 SCM 1
SOS 1 JUTAL 2

WEATHER DECK LOAD


WIND WAVE CURRENT
TIME SPEED / DIR HT / DIR / PERIOD SPEED / DIR HEAVE PITCH ROLL VISIBILITY TEMP
04:30 24 4.0 25 4 18 / 17

SUPPORT CRAFT
TYPE NO. REMARKS TYPE NO. REMARKS
BOAT, WORK 1 NANHAI 207 @ FPSO STBY BOAT, WORK 1 NANHAI 220 @ FPSO STBY
BOAT, WORK 1 NANHAI 209 @ PY5-1 LOADING BOAT, WORK 1 NANHAI 211 @ PY 4-2 STBY
BOAT, WORK 1 NANHAI 219 @ CHIWAN STBY