DEVON

Page 1 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 2,543 2,157 18.00 19 2004-3-17
RIG NAME & NO. FOREMAN AFE NO. AUTH MD AUTH TVD API NO.
DEVON ENERGY PANYU 5-1 BUSH, BOB 111179 3,462 2,161 -
LAST CASING NEXT CASING DATE OF LAST SAFETY MEETING LAST BOP PRES TEST INCIDENT IDENTIFICATION
9.625 (in) @ 2,542.00 (m) 6.625 (in) @ 3,476.00 (m) 2004-3-17 2004-3-3 NONE
FIELD NAME LEAKOFF MW WI NRI
PANYU 5-1 9.30 24.50000 24.5000
LITHOLOGY DAILY DRLG DAILY COMP COST DAILY TOTAL COST
SAND 57,994 0 57,994
CURRENT STATUS CUM DRLG CUM COMP COST CUM TOTAL WELL COST
BOP TEST 1,461,885 0 1,461,885
24 HR FORECAST AFE DHC AFE COMP COST AFE TOTAL PROJ COST
TEST BOP, M/ U SCRAPER BHA, RIH. 2,674,361 1,368,356 4,042,717

DAILY OPERATIONAL COMMENTS: RUN 9 5/8" CASING TO 2542 M. CIRC AND CONDUCT CEMENTING JOB. WOC.R/U TBG HEAD.

OPERATIONS SUMMARY
FROM TO HOURS PHASE STEP OPER TASK DESCRIPTION
00:00 06:00 6.00 INTR1 CSG CSG RUN 9 5/8" CASING TO 2490 M.
06:00 07:30 1.50 INTR1 CSG CSG WORK PIPE AND WASH DOWN FROM 2490 M TO 2542.5 M. HOLE TIGHT.
MAX. P/U 500K. SET CASING SHOE @ 2542 M.
07:30 10:00 2.50 INTR1 CSG CSG CIRCULATE @ 426 GPM, 850 PSI.
10:00 10:30 0.50 INTR1 CSG CMTPRI R/U CEMENTING HEAD AND CEMENTING LINE.
10:30 14:00 3.50 INTR1 CSG CMTPRI HOLD PRE-JOB SAFETY MEETING. PUMP 10 BBLS DRILL WATER,
PRESSURE TEST SURFACE LINE TO 3000 PSI FOR 5 MINS - OK. PUMP
40 BBLS PRE-FLUSH & 60 BBL SPACER BY CEMENT UNIT. DROP
BOTTOM PLUG, PUMP 10 BBLS DRILL WATER. MIX AND PUMP LEAD
SLURRY 882 SX @ 13.02 PPG, YIELD 1.883 CUFT/SX, 295.6 BBLS. MIX
AND PUMP LEAD SLURRY 378 SX @ 15.86 PPG, YIELD 1.147 CUFT/SX,
76.9 BBLS. DROP TOP PLUG, PUMP 10 BBLS DRILL WATER WITH
CEMENT UNIT. DISPLACE WITH SEA WATER @ 12 BPM - FINAL RATE 2
BPM @ 1000 PSI WITH RIG PUMP. BUMP PLUG WITH 1500 PSI, CIP @
14:02 HRS. BLEED OFF PRESSURE, FLOAT EQUIPMENT HELD.
14:00 19:00 5.00 INTR1 CSG CMTPRI WAIT ON CEMENT PREPARE TO N/D BOP, CHECK TDS GEARBOX AS
PER TOWN INSTRUCTIONS.
19:00 00:00 5.00 INTR1 MISC RIGSER L / OUT CMT HEAD-N/D ADAPTER SPOOL. INSTALL SLIPS(280 K CSG
WT), CUT 9-5/8" CSG. R/D CSG ELEVATORS AND L/ OUT LANDING
CASING JOINTS. R / U TUBING HEAD ASSY.

NOTE 1: 0000 TO 0130 R/ U TUBING HEAD & RISER , PRESSURE TEST


FMC TBG HEAD 3000 PSI / 15 MINS, OK.
0130 TO 0230 C/O BAILS-REMOVE TDS AIR/ HYDRAULIC PUMP
TO REPAIR MOUNTING BRACKETS.
0230 TO 0330 M / U TEST ASSEMLY W/ TEST PUG.
0330 TO 0430 SHUT DOWN LOST POWER FROM FPSO,START
GEN.
0430 TO 0600 CONT. M / U TEST ASSY, PREPARE FOR BOP
TEST.
NOTE 2: DOWN HOLE LOSS LAST 24 HRS: 114 BBLS.
TOTAL DOWN HOLE LOSS: 1670 BBLS.

DENSITY(ppg) 9.30 PP ECD MUD DATA DAILY COST CUM COST 8,525
FV PV/YP GELS WL/HTHP FC/T.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf Cl Ca H2S LIME ES
70 23/44 9/14 4.00/ 1.00/ / 0.10/2.50 8.50/0.40 0.10/1.00 46,000 380

Printed: 2005-11-1 10:49:19


DEVON
Page 2 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 2,543 2,157 18.00 19 2004-3-17

PUMP / HYDRAULIC DATA


NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q (gpm) PRESS. (psi) TOTAL Q KILL SPM / PRESSURE
1 NATIONAL - OILWELL 12.000 6.500 85 426.38 850 426.38

MUD VOLUMES (bbl) / ANNULAR VELOCITIES (ft/min)


HOLE PIT 1 PIT 2 PIT 3 PIT 4 TOTAL MUD LOST MUD DUMPED ANN VEL DP ANN VEL DC ANN VEL RISER
131.0 131.0 114.0 1,290.0 167.1 242.9 130.1

MATERIALS / CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
BARITE TONS 70 FUEL HELICOPTE LITRE 5,700
CEMENT TONS 68 DIESEL CU MT 155
BENTONITE TONS 31 WATER, DRL BBLS 730

PERSONNEL DATA Total POB: 83


COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
COSL CEMENTER 3 FRANK
GEOSERVICES 5 CSE 1
DEVON ENERGY DRLG 4 JUTAL 3
DEVON ENERGY PROD 11 FMC 1
COSL DRLG 33 BHI ( DD / MWD ) 2
SLC 13 ROTARY 2
BHI MUD 2 WOODGROUP 1
OILTOOL SOS 1
NORSAFE 1

WEATHER DECK LOAD


WIND WAVE CURRENT
TIME SPEED / DIR HT / DIR / PERIOD SPEED / DIR HEAVE PITCH ROLL VISIBILITY TEMP
04:00 6 90 3.0 90 5 18 / 24

SUPPORT CRAFT
TYPE NO. REMARKS TYPE NO. REMARKS
BOAT, WORK 1 NANHAI 207 @ PY4-2 BOAT, WORK 1 NANHAI 220 TOWN.
BOAT, WORK 1 NANHAI 209 WAY TO TOWN BOAT, WORK 1 NANHAI 211 @ PY5-1.
BOAT, WORK 1 NANHAI 219 TOWN.

Printed: 2005-11-1 10:49:19

You might also like