Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

DEVON

Page 1 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 2,543 2,517 19.00 20 2004-3-18
RIG NAME & NO. FOREMAN AFE NO. AUTH MD AUTH TVD API NO.
DEVON ENERGY PANYU 5-1 BUSH, BOB 111179 3,462 2,161 -
LAST CASING NEXT CASING DATE OF LAST SAFETY MEETING LAST BOP PRES TEST INCIDENT IDENTIFICATION
9.625 (in) @ 2,542.00 (m) (in) @ (m) 2004-3-18 2004-3-18 NONE
FIELD NAME LEAKOFF MW WI NRI
PANYU 5-1 9.40 24.50000 24.5000
LITHOLOGY DAILY DRLG DAILY COMP COST DAILY TOTAL COST
381,222 0 381,222
CURRENT STATUS CUM DRLG CUM COMP COST CUM TOTAL WELL COST
POOH W/ 9-5/8" CSG SCRAPER 1,843,107 0 1,843,107
24 HR FORECAST AFE DHC AFE COMP COST AFE TOTAL PROJ COST
POOH. M/U BHA, RIH, CSG TEST, DRILL OUT.DRILL AHEAD. 2,674,361 1,368,356 4,042,717

DAILY OPERATIONAL COMMENTS: TEST BOP, SERVICE TDS, M/ U 9-5/8" CASING SCRAPER, RIH. CIRC, POOH.

OPERATIONS SUMMARY
FROM TO HOURS PHASE STEP OPER TASK DESCRIPTION
00:00 01:30 1.50 INTR1 BOPS BOPS R/ U TUBING HEAD & RISER , PRESSURE TEST FMC TBG HEAD 3000
PSI / 15 MINS, OK.
01:30 02:30 1.00 INTR1 MISC RIGSER TRIG C/O BAILS-REMOVE TDS AIR/ HYDRAULIC PUMP TO REPAIR MOUNTING
BRACKETS.
02:30 03:30 1.00 INTR1 BOPS BOPS M / U TEST ASSEMLY W/ TEST PUG. L/D DAMAGED 5"DRILL PIPE.
03:30 04:30 1.00 INTR1 MISC RIGSER EPWR SHUT DOWN LOST POWER FROM FPSO, START GEN.
04:30 06:00 1.50 INTR1 BOPS BOPS M/U TEST ASSY, CONNECT CEMENT LINE.
06:00 09:00 3.00 INTR1 BOPS BOPS TEST BOP & RELATED EQUIPMENT 250 PSI / 3500 PSI , ANNULAR 250
PSI /1500 PSI ,HOLD 5 MINS, OK.
09:00 11:00 2.00 INTR1 MISC RIGSER EPWR SHUT DOWN TESTING BOP. CEMENTING UNIT STANDBY FOR
PRODUCTION.
11:00 13:30 2.50 INTR1 BOPS BOPS RESUME TESTING BOP AS PLAN. POOH & L/D TEST PLUG.
13:30 14:30 1.00 INTR1 MISC RIGSER TRIG REINSTALL HYDRALIC PUMP FOR TDS GRABBER.
14:30 15:00 0.50 INTR1 MISC BHA RIH W/WEAR BUSHING & SET SAME
15:00 16:30 1.50 INTR1 DRLG TRIP M/U BHA W/ 8 1/2" BIT & 9 5/8" CASING SCRAPER, RIH.
16:30 18:00 1.50 INTR1 MISC RIGSER TRIG RE-INSTALL GRABBER PUMP TO TDS, NO GO REMOVE SAME.
18:00 23:00 5.00 INTR1 DRLG TRIP CONT RIH W/ 9-5/8" SCRAPER ASSY TO 2375M.
23:00 00:00 1.00 INTR1 DRLG CIRC BREAK CIRCULATION W/ SEA WATER, PUMP 50 BBL HI-VIS , PUMP 80
BBLS SEA WATER, PUMP 50 BBL CAUSTIC PILL. DISPLACE W/SEA
WATER W / 50 SPM @ 170PSI .

NOTE 1 : 0000 TO 0200 CONT. DISPLACE W/ SEA WATER TO 7000


STROKES.
0200 TO 0600 POOH @ 930 M.

DENSITY(ppg) 9.40 PP ECD MUD DATA DAILY COST CUM COST 8,525
FV PV/YP GELS WL/HTHP FC/T.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf Cl Ca H2S LIME ES
78 / / / / / / / /

BITS
BIT / RUN SIZE MANUF. TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN I-O-D-L-B-G-O-R
5/ 9 8.500 SMITH FG200DPSMM4096 2,542.50 2004-3-18 -------

BIT OPERATIONS
BIT / RUN / CHK# WOB RPM GPM PRESS P BIT HRS 24Hr DIST 24Hr ROP CUM HRS CUM DEPTH CUM ROP
5/ 9/ 1 / / 252 160 9

Printed: 2005-11-1 10:49:42


DEVON
Page 2 of 2
Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 2,543 2,517 19.00 20 2004-3-18

BHA / HOLE CONDITIONS


BHA NO. 9 BIT NO. 5 JAR HRS OF SERVICE BHA HRS SINCE INSP 8
BHA WT. BELOW JARS STRING WT. UP STRING WT. DN STRING WT. ROT TORQUE / UNITS BHA LENGTH
265 240 250 ft-lbf 167.910
ITEM DESCRIPTION NO JTS LENGTH O.D. I.D. CONN SIZE CONN TYPE
TRI-CONE BIT 1 0.250 8.500
SCRAPER 1 0.990 9.625
SUB 1 0.430 6.250 3.0000
HEAVY WEIGHT DRILL PIPE 18 166.240 6.625 3.0000

PUMP / HYDRAULIC DATA


NO. MAKE OF PUMP STROKE (in) LINER (in) SPM Q (gpm) PRESS. (psi) TOTAL Q KILL SPM / PRESSURE
1 NATIONAL - OILWELL 12.000 6.500 50 250.81 150 250.81

MUD VOLUMES (bbl) / ANNULAR VELOCITIES (ft/min)


HOLE PIT 1 PIT 2 PIT 3 PIT 4 TOTAL MUD LOST MUD DUMPED ANN VEL DP ANN VEL DC ANN VEL RISER
0.0 236.0 275.0 286.0 797.0 116.0 167.1 242.9 130.1

MATERIALS / CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
BARITE TONS 70 FUEL HELICOPTE LITRE 889 4,435
CEMENT TONS 20 DIESEL CU MT 7 148
BENTONITE TONS 31 WATER, DRL BBLS 730

PERSONNEL DATA Total POB: 83


COMPANY SERVICE NO. HOURS COMPANY SERVICE NO. HOURS
NORSAFE GEOSERVICES 5
COSL CEMENTER 2 FRANK
DEVON ENERGY DRLG 3 CSE 1
DEVON ENERGY PROD 13 JUTAL 3
COSL DRLG 33 FMC
SLC 13 BHI ( DD / MWD ) 4
BHI MUD 2 ROTARY 2
OILTOOL WOODGROUP 1
SOS 1

WEATHER DECK LOAD


WIND WAVE CURRENT
TIME SPEED / DIR HT / DIR / PERIOD SPEED / DIR HEAVE PITCH ROLL VISIBILITY TEMP
04:00 26 45 6.0 45 5 18 / 24

SUPPORT CRAFT
TYPE NO. REMARKS TYPE NO. REMARKS
BOAT, WORK 1 NH207 @ PY4-2 BOAT, WORK 1 NH220 @ PY4-2
BOAT, WORK 1 NH209 ON THE WAY TO PY5-1 BOAT, WORK 1 NH211 @ PY5-1.
BOAT, WORK 1 NH219 @ FPSO

Printed: 2005-11-1 10:49:42

You might also like