Daily Report
OFFSHORE ORIG DRLG
WELL NAME 24 HRS PROG TMD TVD DFS REPT NO. DATE
PANYU 5-1-A06H 2,543 2,157 21.00 22 2004-3-20
RIG NAME & NO. FOREMAN AFE NO. AUTH MD AUTH TVD API NO.
DEVON ENERGY PANYU 5-1 BUSH, BOB 111179 3,462 2,161 -
LAST CASING NEXT CASING DATE OF LAST SAFETY MEETING LAST BOP PRES TEST INCIDENT IDENTIFICATION
9.625 (in) @ 2,542.00 (m) (in) @ (m) 2004-3-20 2004-3-18 NONE
FIELD NAME LEAKOFF MW WI NRI
PANYU 5-1 9.20 24.50000 24.5000
LITHOLOGY DAILY DRLG DAILY COMP COST DAILY TOTAL COST
84,516 0 84,516
CURRENT STATUS CUM DRLG CUM COMP COST CUM TOTAL WELL COST
SHUT DOWN, WAITING ON SLINGER LINKS 2,078,025 0 2,078,025
24 HR FORECAST AFE DHC AFE COMP COST AFE TOTAL PROJ COST
SHUT DOWN, DRILL 8 1/2" HOLE. 2,674,361 1,368,356 4,042,717
DAILY OPERATIONAL COMMENTS: M/U BHA. TEST AUTOTRAK. L/O JARS. RIH. DISPL. W/PERFLOW. TEST CSG W/CMT UNIT. DRILL.
TEST CSG W/ RIG PUMP. CIRC.POH, SHUT DOWN,WAIT ON SLINGER LINKS F/ LIFE BOAT.
OPERATIONS SUMMARY
FROM TO HOURS PHASE STEP OPER TASK DESCRIPTION
00:00 01:30 1.50 INTR1 DRLG BHA CONT M/U BHA & RIH TO 622 M
01:30 02:00 0.50 INTR1 DRLG TRIP R/U BYPASS ACTUATOR & TEST AUTOTRAK DOWNLINK, OK.
02:00 04:00 2.00 INTR1 DRLG TRIP CONT RIHW/BHA
04:00 08:00 4.00 INTR1 DRLG TRIP L/OUT USED JARS , CONT RIH TO 2480M, WASH DOWN F/ 2480M
TO2515M, TAG CMT @ 2515 M W/ 10K.
08:00 10:00 2.00 INTR1 DRLG CIRC PUMP 70 BBL HIVIS. DISPLACE W/ PERFLOW - CIRC BTMS UP.
10:00 10:30 0.50 INTR1 CSG CSG TEST 9-5/8" CSG TO 1500 PSI/10 MIN W/CMT UNIT,OK.
10:30 12:30 2.00 INTR1 DRLG DRLG DRILL CMT F/ 2515 M TO 2534 M.
12:30 13:00 0.50 INTR1 DRLG CIRC CIRC BTMS UP @ 2534 M.
13:00 13:30 0.50 INTR1 CSG CSG TEST CSG TO 1500 PSI/10 MIN W/ RIG PUMP,OK.
13:30 15:00 1.50 INTR1 DRLG CIRC WOO CIRC @ 2525 M.
15:00 15:30 0.50 INTR1 DRLG TRIP WOO POOH TO 2272 M.
15:30 00:00 8.50 INTR1 MISC RIGSER WOO SHUT DOWN ,WAITING ON SLINGER LINKS F/ LIFE BOAT. BREAK CIRC
EVERY 4 HRS. PERFORM RIG MAINT. MIX RESERVE MUD.
DENSITY(ppg) 9.20 PP ECD MUD DATA DAILY COST CUM COST 8,525
FV PV/YP GELS WL/HTHP FC/T.SOL OIL/WAT %Sand/MBT Ph/pM Pf/Mf Cl Ca H2S LIME ES
70 21/45 15/20 4.50/ 1.00/ / / 9.40/1.80 0.30/1.30 25,000
BITS
BIT / RUN SIZE MANUF. TYPE SERIAL NO. JETS OR TFA DEPTH IN DATE IN I-O-D-L-B-G-O-R
6/ 10 8.500 HUGHES HCR606 7202241 14/14/14/14/14/14 2,542.50 2004-3-19 1-1-WT-S-D-0-NO-TD
BIT OPERATIONS
BIT / RUN / CHK# WOB RPM GPM PRESS P BIT HRS 24Hr DIST 24Hr ROP CUM HRS CUM DEPTH CUM ROP
MATERIALS / CONSUMPTION
ITEM UNITS USAGE ON HAND ITEM UNITS USAGE ON HAND
BARITE TONS 70 FUEL HELICOPTE LITRE 634 6,288
CEMENT TONS 20 DIESEL CU MT 137
BENTONITE TONS 31 WATER, DRL BBLS 20 600
SUPPORT CRAFT
TYPE NO. REMARKS TYPE NO. REMARKS
BOAT, WORK 1 NH207 @ FPSO BOAT, WORK 1 NH219 @ FPSO
BOAT, WORK 1 NH209 @ PY5-1 BOAT, WORK 1 NH211 @ PY4-2