22st SLTC Dated 09.02.2024
22st SLTC Dated 09.02.2024
09 February 2024
1
Agenda Items
3
Agenda 01
ve`r 2-0 dk;Zdze ds vUrxZr VªkUp 02 dh 11 ifj;kstukvksa dh izFke U;wure fufofnr ykxr :0
22237.13 yk[k ds vuqeksnu dk izLrkoA
4
Summary of Financial Bids sent for Approval to SLTC
Projects
Sr No SLTC Date Bid Cost (In Cr) L1 Cost (In Cr)
Approved
SLTC 1 to SLTC 6 - No Bids sent for Approval
I SLTC 7 24/01/2023 9 70.08 55.17
II SLTC 8 02/03/2023 11 980.32 818.95
III SLTC 9 16/03/2023 7 169.85 146.03
IV SLTC 10 29/03/2023 2 29.06 23.94
V SLTC 11 25/05/2023 6 66.42 55.97
VI SLTC 12 13/06/2023 3 101.06 88.64
VII SLTC 13 14/07/2023 8 267.76 236.06
VIII SLTC 14 11/08/2023 4 85.48 74.87
IX SLTC 15 16/09/2023 13 455.47 381.61
X SLTC 17 1/11/2023 15 677.99 568.69
XI SLTC 19 23/11/2023 22 788.03 663.01
XII SLTC 20 29/12/2023 18 601.47 518.53
XIII SLTC 21 16/01/2024 15 366.70 297.89
XIV SLTC 22 09/02/2024 11+6 535.18 462.81
Grand Total 150 5,194.87 4,392.17
5
11 Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including Propos
Date of %
Sanction Bid L-1 Total GST but Labour Cess) % ed
NIT Openin Cover
ULB Tranc Project ed Cost Cost Cost No. of Including High/Low Cover New Proposed
S.No. District Project Title Publicati g Name of L1 age
Name he Type Rs. In Rs. In Rs. In Bidder Labour Cess) with respect age House Work
on Date Technic Befor
Lacs Lakh Lakh s to After Conne
al Bid e
As Per As Per ction
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/S R.R Traders
Pipiganj H.No-725 D,
OHT 2 Nos ,
Nagar Mohaddipur,
Water TW 07 nos (01
Panchayat Gorakhpur (70%) J.V 23.59 23.59
Gorakhp Pipigan Tranc Supply 12.12.202 28.12.20 Rebore), 81.23
1 Water 3436.22 2706.85 M/S O.P Gupta 2068.30 4 2706.852706.85 % % 2.94 53.09 9491
ur j (NP) he-2 (Coverag 3 23 km
Supply Contractors Pvt. Ltd, Below Below
e) Distribution.
Scheme (Part- B-29 Nirbhay Nagar,
line
1) Gailana Road Agra
(30%)
Pipiganj M/s Anapurna
Nagar Construction (57%), OHT 2 Nos,
Water
Panchayat MIG-19 Gautam 21.51 21.51 TW 04 nos ,
Gorakhp Pipigan Tranc Supply 05.12.202 23.12.20
2 Water 2606.64 2024.14 Vihar, Taramandal 1588.75 3 2024.142024.14 % % 53.09 100 5865 71.88 km
ur j (NP) he-2 (Coverag 3 23
Supply Gorakhpur JV M/s Below Below Distribution.
e)
Scheme (Part- R&B Infra, line
2) Maharashtra (43%)
6
11 Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including Propos
Date of %
Sanction Bid L-1 Total GST but Labour Cess) % ed
NIT Openin Cover
ULB Tranc Project ed Cost Cost Cost No. of Including High/Low Cover New Proposed
S.No. District Project Title Publicati g Name of L1 age
Name he Type Rs. In Rs. In Rs. In Bidder Labour Cess) with respect age House Work
on Date Technic Befor
Lacs Lakh Lakh s to After Conne
al Bid e
As Per As Per ction
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Khalilabad
Nagar Palika M/S Brij Mohan OHT 3 Nos,
Water
Sant Khalila parishad Contractor, C-62, TW 10 nos ,
Tranc Supply 05.12.202 23.12.20 15.16% 15.16%
3 Kabir bad Water 5016.24 3982.3 Shatabdi Nagar, 3378.58 3 3982.303982.30 18.34 63.44 14516 122.78 km
he-2 (Coverag 3 23 Below Below
Nagar (NPP) Supply Ramgaht Road, Distribution.
e)
Scheme (Part- Aligarh UP line
1)
M/S Suraj
Sahjwnwa Contractor, H.No-C-
Nagar 190 Bilandpur,
OHT 3 Nos,
Water Panchayat Gorakhpur (51%) J.V
Sahjan 21.75 21.75 TW 06 nos,
Gorakhp Tranc Supply water Supply 22.11.202 27.12.20 M/S R&B Infra
4 wan 2545.53 1966.82 1539.04 3 1966.821966.82 % % 8.55 42.48 4450 54.19 km
ur he-2 (Coverag (Phase-2) 3 23 Project Ltd, R/O-B-1
(NP) Below Below Distribution.
e) Water Neela Apartment,
line
Supply Opp. Mandpeshwar
Scheme. India Estate,
Mumbai (49%)
7
11 Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including Propos
Date of %
Sanction Bid L-1 Total GST but Labour Cess) % ed
NIT Openin Cover
ULB Tranc Project ed Cost Cost Cost No. of Including High/Low Cover New Proposed
S.No. District Project Title Publicati g Name of L1 age
Name he Type Rs. In Rs. In Rs. In Bidder Labour Cess) with respect age House Work
on Date Technic Befor
Lacs Lakh Lakh s to After Conne
al Bid e
As Per As Per ction
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/s Abhishek
Kumar pandey,MIG-
Sandila b50, Vikas Nagar
OHT 3 Nos,
Water Nagar Palika Gorakhpur (70%)JV
TW 07 nos ,
Sandila Tranc Supply Parishad 08.12.202 28.12.20 M/s R&B Infra 4.05 % 4.63 %
5 Hardoi 5401.35 4183.78 4014.34 5 4183.784209.16 32 100 11815 155.86 km
(NPP) he-2 (Coverag Water 3 23 Project Limited Below Below
Distribution.
e) Supply Neela Apartment,
line
Scheme SVP road
Borivali(W),Mumbai
(30%)
9
11 Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including Propos
Date of %
Sanction Bid L-1 Total GST but Labour Cess) % ed
NIT Openin Cover
ULB Tranc Project ed Cost Cost Cost No. of Including High/Low Cover New Proposed
S.No. District Project Title Publicati g Name of L1 age
Name he Type Rs. In Rs. In Rs. In Bidder Labour Cess) with respect age House Work
on Date Technic Befor
Lacs Lakh Lakh s to After Conne
al Bid e
As Per As Per ction
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/s Anapurna
OHT 1 No,
Construction MIG-
Water TW 05 nos,
Water 19 Gautam Vihar, 21.72 22.15
Bansdih Tranc Supply 25.11.202 05.01.20 Distribution
9 Ballia Supply in 2814.98 2171.14 Taramandal 1699.57 3 2171.142183.26 % % 0 100 6254
(NP) he-2 (Coverag 3 23 line - 55.72
NP Bansdih Gorakhpur (57%),JV Below Below
e) km, Rising
M/s R&B Infra,
Main - 4050 m
Maharashtra (43%)
M/s Jai Maa Gayatri
Enterprises, Vill-
Narrey, Post-
OHT 2 Nos,
Paniyara Rajgarh, Dist-
TW 04 nos,
Nagar Gorakhpur, (U.P.)
Water 80.11 km
Panchayat (70%)& M/S
Maharajg Paniyar Tranc Supply 30.11.202 01.01.20 24.97% 24.97% Distribution.
10 Water 2249.89 1717.73 Maheshwari 1288.81 4 1717.731717.73 0 100 5854
anj a he-2 (Coverag 3 24 Below Below line, 1.2 km
Supply Contractors Private
e) Rising Main,
Scheme Zone Limited, Vill-
Automation(S
2&3 Bikaser, Bikaner
CADA) etc.
Road, Nokha
Bikaner, Rajasthan
(30%) (JV).
10
11 Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including Propos
Date of %
Sanction Bid L-1 Total GST but Labour Cess) % ed
NIT Openin Cover
ULB Tranc Project ed Cost Cost Cost No. of Including High/Low Cover New Proposed
S.No. District Project Title Publicati g Name of L1 age
Name he Type Rs. In Rs. In Rs. In Bidder Labour Cess) with respect age House Work
on Date Technic Befor
Lacs Lakh Lakh s to After Conne
al Bid e
As Per As Per ction
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
OHT 1 No,
Khargupur M/s. S.K.G. Trading TW 02 nos,
Nagara Company, R/o 21.52 km
KHAR 18.78
Tranc Water Panchayat 28.12.202 12.01.20 Rajapur Chauraha, 23.32% Distribution.
11 GONDA GUPUR 1163.05 849.64 690.07 9 849.64 900 % 6 100 2996
he-1 Supply Piped Water 3 24 LRP Road, Below line, 0.55 km
(NP) Below
Supply Lakhimpur- Kheri Rising Main,
Scheme (UP) Automation(S
CADA) etc.
26605.0 22237.1 26605.0
Total 34808.95 27209.2 90652
5 3 5
11
PIPIGANJ NAGAR PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME (PART-1)
DISTRICT-GORAKHPUR
NAME OF PROJECT PIPIGANJ NAGAR PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME (PART-1) DISTRICT-GORAKHPUR
NAME OF ULB & DISTRICT NAGAR PANCHAYAT PIPIGANJ DISTRICT-GORAKHPUR
GO DETAIL 185@ve`r&2-0@ukS&5&2023 fnukad 21-09-2023
TOTAL SANCTIONED COST OF SCHEME Rs. 3436.22 Lacs SANCTIONED WORK COST Rs. 3228.87 Lacs Centage Rs. 207.35 Lacs
WORK PROPOSED Tubewell-07 Nos (01 No. Rebore), Over Head Tank- 02 Nos. , Pump House-06 Nos. , Distribution System- 81235.00 Rmt., House Connection- 8130 Nos., Rising Main- 4180 Rmt. etc.
NAME OF NEWS PAPER IN NIT PUBLISHED Amar Ujala (Hindi) - Dated – 17-12-2023
AND DATE The Times of India (English)- Dated – 17-12-2023
(-17.39%)
QUOTED COST % BELOW TO TENDER COST (- 23.59%)
WORK PROPOSED Tubewell-04 Nos, Over Head Tank- 02 No. (New), Pump House-04 Nos. , Distribution System- 71888.00 Rmt., House Connection- 5565 Nos., Rising Main- 2320 Rmt. etc.
The Joint Bidding Agreement of the lead and JV partner is not appropriate, as the JV firm
REASON FOR DISQUALIFICATION - - formed by both the parties is in the name of Lead bidder i.e M/s R.R. Traders which is not
as per the required conditions mentioned in the Bid Document
(+11.02%)
QUOTED COST % BELOW TO TENDER COST (- 21.51%)
2247.20
COST IN LACS 1588.75
L-2
LOWEST BID RANKING L-1
M/S. Annapurna Construction, MIG-19, Gautam Vihar, Siddharth Enclave, Taramandal, Gorakhpur (57%) JV M/S. R&B Infra Project Limited, R/o- B-1 Neela Apartment, Opp. Mandpeshwar Ind. Estate, Mumbai
LOWEST COST QUOTED FIRM
(43%)
% BELOW AGAINEST S.O.R. COST (-) 21.51 % BELOW AGAINST TENDER (-) 21.51
% BELOW AGAINEST SANCTIONED COST (-) 21.51
LOWEST BIDDING COST IN LACS 1588.75
13
FINANCIAL BID APPROVED APPROVED
KHALILABAD NAGAR PALIKA PARISHAD WATER SUPPLY REORGANIZATION SCHEME
(PART-1) DISTRICT-SANT KABIR NAGAR
NAME OF PROJECT KHALILABAD NAGAR PALIKA PARISHAD WATER SUPPLY REORGANIZATION SCHEME (PART-1) DISTRICT-SANT KABIR NAGAR
NAME OF ULB & DISTRICT NAGAR PALIKA PARISHAD KHALILABAD DISTRICT-SANT KABIR NAGAR
GO DETAIL 182@ve`r&2-0@ukS&5&2023 fnukad 21-09-2023
TOTAL SANCTIONED COST OF SCHEME Rs. 5016.24 Lacs SANCTIONED WORK COST Rs. 4749.26 Lacs Centage Rs. 266.98 Lacs
WORK PROPOSED Tubewell-10 Nos (02 Nos. Rebore), Over Head Tank- 03 No. (New), Pump House-08 Nos. , Distribution System- 122780.00 Rmt., House Connection- 14516 Nos., Rising Main- 3589 Rmt. etc.
14
SAHJANWA NAGAR PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME (PART-1)
DISTRICT-GORAKHPUR
NAME OF PROJECT SAHJANWA NAGAR PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME (PART-1) DISTRICT-GORAKHPUR
NAME OF ULB & DISTRICT NAGAR PANCHAYAT SAHJANWA DISTRICT-GORAKHPUR
GO DETAIL 257@ve`r&2-0@ukS&5&2023 fnukad 13-12-2023
TOTAL SANCTIONED COST OF SCHEME Rs. 2545.53 Lacs SANCTIONED WORK COST Rs. 2358.41 Lacs Centage Rs. 187.12 Lacs
WORK PROPOSED Tubewell-06 Nos, Over Head Tank- 03 Nos., Pump House-06 Nos. , Distribution System- 54198.00 Rmt., House Connection- 4450 Nos., Rising Main- 1820 Rmt. etc.
M/S. Amba Construction, Village-Pandeypur, Post-Kushahari, M/S. Suraj Construction, H.No.-C-190, Bilandpur, Gorakhpur (51%) JV M/S. Pawan Kumar Choubey, Laxmipur, Barari, Gurubazar, Katihar
District-Deoria (55%) JV M/S. M.T. Phad, Madhav Nagar, M/S. R&B Infra Project Limited, R/o- B-1 Neela Apartment, Opp.
NAME OF FIRM Gangakhed Road, Parbhani (45%) Mandpeshwar Ind. Estate, Mumbai (49%)
(-18.77%)
QUOTED COST % BELOW TO TENDER COST (- 21.75%) (- 21.00%)
15
Sandila Nagar Palika Parishad Reorganization water supply scheme, District - Hardoi
NAME OF PROJECT Sandila Nagar Palika Parishad Reorganization water supply scheme, District - Hardoi
NAME OF ULB & DISTRICT Nagar Palika Parishad Sandila, District- Hardoi
GO DETAIL Computer No. 1725198, 194/AMRUT 2.0/ NAU-5-2023, DATE - 30.09.2023
TOTAL SANCTIONED COST OF SCHEME Rs. 5401.35 Lacs. SANCTIONED WORK COST Rs. 4209.16 Lacs.
COST OF BID Rs. 4183.78 Lacs.
Over Head Tank- 03 Nos (New), Tube well- 7 Nos, Pump House- 7 Nos, Distribution System- 155865 Mt., House Connection- 11815 Nos., Rising Main- 1760 Mt., Boundary wall, site
WORK PROPOSED
development, MCS Building, SCADA Automation system, Repairing work (OHT, Pump House, Staff Quarter & Boundary wall) etc.
NIT DETAIL 2075/M-13/455 Dt. 08/12/2023 (Forth Time)
NAME OF NEWS PAPER IN NIT PUBLISHED AND
Hindustan (HINDI) & Hindustan Times (ENGLISH), DATE – 12.12.2023
DATE
DATE OF TECHNICAL BID OPENING 28-12-2023
TOTAL BID RECEIVED 4
FIRM - 1 FIRM - 2 FIRM – 3 FIRM - 4 FIRM - 5
M/s. Central India Engineering Pvt. Ltd., M/s. ATC, 134, Kamla Nagar, Collectorganj, M/s. Abhishek Kumar Pandey, MIG-B50, Vikas M/s. C.K. Enterprises, Beerapur M/s. R.K. Engineer Sales ltd., B-116,
Plot No. 39, Tatya Tope Nagar, WHC Fatehpur (70%) J.V. M/s. O.P. Gupta, Nagar, Gorakhpur (70%) J.V. M/s. R&B Infra Kamlanagar, Jhunsi, Allahabad (70%) J.V. first floor, Vibhuti Khand, Gomti
BIDDER’S DETAIL Road, Nagpur. Contractor Pvt. Ltd., B-29, Nirbhay Nagar, Project Limited, Neela Apartment, Opp. M/s. SSG Infratech Pvt. Ltd., D-835, New Nagar, Lucknow.
Agra (30%) Mandpeshwar Ind. Estate, SVP road, Borivali (W), friends colony, New Delhi (30%)
Mumbai (30%)
TOTAL COST Rs. 2142.62 lacs WORK COST Rs. 1989.31 lacs CENTAGE Rs. 153.31 lacs
TUBEWELL-05 NOS, OVER HEAD TANK- 02 NOS. , PUMP HOUSE-05 NOS. , DISTRIBUTION SYSTEM- 39.00 KM., RISING MAIN- 1.56 KM., HOUSE CONNECTION- 5468
WORK PROPOSED
NOS., ETC.
M/s GRM-GA-JV D-473, Govindpuram Ghaziabad M/s Shishupal Singh Parihar, 8/153/2D-1, New M/s BK Construction & Co. Gari Raddu, Post Therai,
TOTAL BID QUALIFIED Lawyer Colony Agra Shamshabad Road, Agra 283125
TECHNICALLY
M/s BK Construction & Co. Gari Raddu, Post Therai, M/s GRM-GA-JV D-473, Govindpuram M/s Shishupal Singh Parihar, 8/153/2D-1, New
Shamshabad Road, Agra 283125 Ghaziabad Lawyer Colony Agra
NAME OF FIRM
COST IN LACS Rs. 1463.75 Lacs Rs. 1480.00 Lacs Rs. 1509.89 Lacs
LOWEST COST QUOTED FIRM M/s BK Construction & Co. Gari Raddu, Post Therai, Shamshabad Road, Agra 283125
% BELOW AGAINST
% BELOW AGAINST ESTIMATE (-) 11.92 % (-) 4.51 %
TENDER
M/s Nitin Tyagi Contractor, 76/9, Purwawali, Ganeshpur, Roorkee Haridwar, Uttrakhand (51%) JV
LOWEST COST QUOTED FIRM
M/s GRM Infrastructure Pvt Ltd, D-473, Govindpuram, Ghaziabad UP (49%)
WORK PROPOSED Tubewell-5 Nos, Over Head Tank- 01 No. (New), Pump House-05 Nos. , Distribution System- 55.726 Km, House Connection- 6254 Nos., Rising Main- 4050 m, etc.
NAME OF NEWS PAPER IN NIT PUBLISHED Amar Ujala (Hindi) , Dated – 26.11.2023
AND DATE Times of India (English), Dated – 26.11.2023
DATE OF TECHNICAL BID OPENING 05.01.2024
TOTAL BID RECEIVED 03 Nos BID Received
FIRM – 1 FIRM – 2 FIRM-3
M/s Annapurna Construction, MIG - 19, Gautamnagar, Post - M/s Gupta Associates , 802/1 New Mandi, Sanjay Nagar, Muzaffar Nagar, M/S P Das Infrastructure , Pvt. Ltd. B 8, Third Floor, Sardar Patel Mall, Near diamond
Siddarth Enclave, (Taramandal), Gorakhpur - 273001(57%) JV with U.P. - 251001(51%) JV with M/S M R Entrterprises 532 KHA/29, Mehndi tola, mill, Nikol gam road, Ahmedabad (100%)
BIDDER’S DETAIL M/S R & B Infraproject Ltd. 8 - 1, Neela Apartment opposite Liban Nursing Home, Aliganj, Lucknow, U.P., - 226022 (49%)
Mandpeshawar Estate, SVP road, Boriwali, West Mumbai -
400002 (43%)
WORK PROPOSED OHT 2 Nos, TW 04 nos, 80.11 km Distribution line, 1.2 km Rising Main, Boundry Wall, Staff Quarter, Automation(SCADA) etc.
NIT DETAIL 604/V-15/142 dt. 30-11-2023
Hindustan (Hindi) - Dated – 02-12-2023
NAME OF NEWS PAPER IN NIT PUBLISHED AND DATE
The Indian Express (English)- Dated – 02-12-2023
DATE OF TECHNICAL BID OPENING 01-01-2024
TOTAL BID RECEIVED 4
FIRM - 1 FIRM - 2 FIRM - 3 FIRM - 4
M/s Jai Maa Gayatri Enterprises, Vill- Narrey, Post- M/s Astabhuja Construction Company, Vill- M/S Pawan Kumar Choubey, Laxmipur, Barari, M/S Suraj Construction, H.No. C-190, Bilandpur, Dist-
Rajgarh, Dist- Gorakhpur, (U.P.) (70%) JV M/S Pandeypur, Post-Kushahari, Dist-Deoria, (U.P.) Gurubazar, Katihar, Bihar. Gorakhpur, (U.P.) (51%) JV M/S R & B Infra Project
Maheshwari Contractors Private Limited, Vill-Bikaser, (51%) JV M/s MadhavRao Tukaram Phad (M T
BIDDER’S DETAIL Bikaner Road, Nokha Bikaner, Rajasthan(30%) (JV). Phad), Madav Nagar, Gangakhed Road, Parbhani, Limited, Ground Floor, B-1, Neela Apt., SVP Road, Boriwali
Maharashtra (49%) . West, Mumbai Suburban, Maharashtra(49%) .
QUALIFIED / DISQUALIFIED QUALIFIED DISQUALIFIED DISQUALIFIED DISQUALIFIED QUALIFIED QUALIFIED QUALIFIED QUALIFIED QUALIFIED
Tender Fee & EMD BG Not Submitted. 1.Attached Bank
Not Deposited Certificate in place of
Solvency Certificate
REASON FOR DISQUALIFICATION 2. Certified Positive Net
worth not attached in bid
document.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Pump House-4 Nos,
Risingmain-
Khora Khora Makanpur 750.00mtr CWR-
Ghaziab Tranche- Water
1 Makanpur (NPP) Water Supply 25314.00 2343.00 18550.23 2317.06 526872 3385 0 43906 0.00 100 4Nos Gravioty
ad 3 Supply
(NPP) Scheme main-8.16Km,
Distribution Line-
194.26 Km
Tubewell-2 Nos,
Kotra Tranche- Water Kotra (NP) Water Rebore-01 Nos RCC
2 Jalaun 1075.00 320.00 1311.77 356.35 9885 12288 775 1422 35.28 100
(NP) 3 Supply Supply Scheme OHT-2 Distribution
line-25.96Km
4 No. of Water Supply Connection Proposed in following DPR in AMRUT 2.0 43906
5 After implementation of this project, coverage of household with water supply connection 43906 100.00%
Necessity of Project
Proposed
Water OHT Nos of Proposed Proposed
Name of Rising
S. No Supply Beneficiary Wards Capacity Proposed Distribution House
ULB Main (in
Zones (in KL) UGR Line (Km) Connection
M.)
1 2 3 4 5 6 7 8 9
Proposed Cost of Project as per CWAP Proposed Cost of Project as per DPR
Construction Division,
U.P Jal Nigam (Urban),
Orai, Distt.-Jalaun
39
KOTRA TOWN WATER SUPPLY SCHEME OVERVIEW
Water Availability as per CWAP for year 2025 (MLD) 0.357 21.14%
Gap in water demand as per CWAP for year 2025 (MLD) 1.331 100%
42
NECESSITY OF SCHEME
• As per base year 2025 projected population of Kota NP will be 8390 Nos. having only 35.28% present
coverage.
• Scheme is sanctioned under AMRUT-2.0 programme in tranche-2 will provide the cent percent coverage
to the town.
• Kotra town there is good availability of ground water hence scheme is made based on ground water.
• As per guidelines of AMRUT-2.0 water supply scheme is proposed with 135 lpcd and terminal pressure of
12 m.
MAJOR WORK PROPOSED
New TW’s Rebore Pump House Rising Main CWR’s OHT’s Distribution House
TW’s Network Connections
44
45
ABSTRACT OF COST
Total Cost
S.No. Description of Work Unit Quantity
(in lacs)
A Civil Works
1 Proposed R.C.C. Over Head Tank Nos. 02 157.98
2 Distribution Network km 25.963 391.89
3 Rising Main m 6.31 181.67
4 House Connection (New) Nos. 1422 58.27
5 Shifting of House Connection Nos. 775 29.03
7 Building Work & Other Misc. Job - 91.23
Sub Total A 870.07
46
B E&M Works
48
5 YEARS O&M EXPENSE ON SCHEME
May-24
May-25
Mar-24
Mar-25
Aug-24
Apr-24
Nov-24
Apr-25
Feb-24
Dec-24
Feb-25
Jun-24
Jun-25
Sep-24
Oct-24
Jan-25
Jul-24
S.No Name of Activity Start Date Complete Date
50
PHAPHUND NAGAR PANCHAYAT WATER SUPPLY
EXTENSION SCHEME, DISTRICT-AURAIYA
UNDER
AMRUT 2.0 PROGRAMME
Construction Division,
U.P Jal Nigam (Urban),
Etawah
51
PHAPHUND TOWN WATER SUPPLY SCHEME OVERVIEW
(Rs. in crores)
Water Availability as per CWAP for year 2025 (MLD) 0.85 28.30%
Gap in water demand as per CWAP for year 2025 (MLD) 2.64 100%
54
NECESSITY OF SCHEME
• As per base year 2025 projected population of Phaphund NP will be 5644 Nos. having only 26.93% present
coverage.
• Scheme is sanctioned under AMRUT-2.0 programme in tranche-2 will provide the cent percent coverage to
the town.
• Phaphund town there is good availability of ground water hence scheme is made based on ground water.
• As per guidelines of AMRUT-2.0 water supply scheme is proposed with 135 lpcd and terminal pressure of 12
m.
MAJOR WORK PROPOSED
New TW’s Rebore Pump House Rising Main CWR’s OHT’s Distribution House
TW’s Network Connections
56
57
ABSTRACT OF COST
Total Cost
S.No. Description of Work Unit Quantity
(in lacs)
A Civil Works
1 Pumphouse cum chloronome No. 04 23.08
2 Rising Main M 2.56 80.03
3 R.C.C. Over Head Tank (900KL/20M) No. 01 135.25
4 Local Control Station No. 01 13.58
5 Distribution Network (42001M) Km 42.00 840.80
6 House Connection (4124) Nos. 4124 238.80
7 Staff Quarter (Single Room) No. 01 9.90
8 Boundary Wall, Gate and Approch road M 281.60 23.80
9 Ground Water Recharge Unit No. 01 3.60
58
B E&M Works
59
VIABILITY OF SCHEME
60
5 YEARS O&M EXPENSE ON SCHEME
May-24
May-25
Mar-24
Mar-25
Aug-24
Apr-24
Nov-24
Apr-25
Feb-24
Dec-24
Feb-25
Jun-24
Jun-25
Sep-24
Oct-24
Jan-25
Jul-24
S.No Name of Activity Start Date Complete Date
62
63
Agenda 03
ve`r 2-0 dk;Zdze vUrxZr Tranche-1&2 dh p;fur is;ty ;kstuk;sa ftudk foRr iks"k.k
jkT; lsDVj ls fd;k tk jgk gS ftlls lEcfU/kr uxj fudk; iw.kZr% is;ty ls lar`Ir gks
tk;sxsa] dks ve`r 2-0 dk;Zdze gVk;s tkus ds lEcU/k esaA 64
ve`r 2-0 dk;Zdze vUrxZr Tranche-1&2 dh p;fur is;ty ;kstuk;sa ftudk foRr iks"k.k jkT; lsDVj ls fd;k tk jgk
gS ftlls lEcfU/kr uxj fudk; iw.kZr% is;ty ls lar`Ir gks tk;sxsa] dks ve`r 2-0 dk;Zdze gVk;s tkus ds lEcU/k esaA
65
Agenda 04
uxj ikfydk ifj"kn jk;cjsyh ds 7 ukyksa ds vkbZ0,u0Mh0 dk;Z dks ve`r 2-0 dk;Zdze ds
LFkku ij uekfe xaxs dk;Zdze vUrxZr for iks"k.k fd;s tkus ds lEcU/k esaA 66
uxj ikfydk ifj"kn jk;cjsyh ds 7 ukyksa ds vkbZ0,u0Mh0 dk;Z dks ve`r 2-0 dk;Zdze ds LFkku ij uekfe xaxs dk;Zdze
vUrxZr for iks"k.k fd;s tkus ds lEcU/k esaA
67
Agenda 05
eq[; lfpo] m0iz0 'kklu }kjk fnukad 05-01-2024 dks fn;s x;s funsZ'kksa dks vuqikyukFkZ dqdjSy unh esa
fxj jgs 22 ukyksa ds Vsfiax gsrq bZ-,Q-lh- ls Dyh;j dh tk pqdh dqdjSy fjoj vkbZ@Mh- dk;Z;kstuk
Qst&2 ykxr :- 24-55 djksM+ esa 20 ,e0,y0Mh0] {kerk ds ,l-Vh-ih- ds fuekZ.k dks lfEefyr djrs
gq;s ;kstuk iqujhf{kr fd;s tkus ds laca/k esa ,l0,y0Vh0lh0 dh 20oha cSBd esa fy;s x;s fu.kZ; esa
la'kks/ku ds lEcU/k esaA 68
eq[; lfpo] m0iz0 'kklu }kjk fnukad 05-01-2024 dks fn;s x;s funsZ’kksa dks vuqikyukFkZ dqdjSy unh esa fxj jgs 22 ukyksa
ds Vsfiax gsrq bZ-,Q-lh- ls Dyh;j dh tk pqdh dqdjSy fjoj vkbZ@Mh- dk;Z;kstuk Qst&2 ykxr :- 24-55 djksM+ esa 20
mld {kerk ds ,l-Vh-ih- ds fuekZ.k dks lfEefyr djrs gq;s ;kstuk iqujhf{kr fd;s tkus ds laca/k esa
eq[; lfpo] m0iz0 'kklu }kjk fnukad 05-01-2024 dks fn;s x;s funsZ’kksa dks vuqikyukFkZ dqdjSy unh esa fxj jgs 22 ukyksa
ds Vsfiax gsrq bZ-,Q-lh- ls Dyh;j dh tk pqdh dqdjSy fjoj vkbZ@Mh- dk;Z;kstuk Qst&2 ykxr :- 24-55 djksM+ esa 20
mld {kerk ds ,l-Vh-ih- ds fuekZ.k dks lfEefyr djrs gq;s ;kstuk iqujhf{kr fd;s tkus ds laca/k esa
Agenda 06
ve`r dk;Zdze ds vUrxZr 09 ifj;kstuk;sa ftudh iz'kklfud ,oa foRrh; Lohd`fr esa th-,l-Vh- vfrfjDr
ns; gS ,oa dk;kZsa esa deh@o`f) ds dkj.k dk;Z ykxr esa oSfj;s'ku dk izLrkoA
71
ve`r dk;Zdze ds vUrxZr 09 ifj;kstuk;sa ftudh iz'kklfud ,oa foRrh; Lohd`fr esa th-,l-Vh- vfrfjDr ns; gS ,oa dk;kZsa
esa deh@o`f) ds dkj.k dk;Z ykxr esa oSfj;s'ku dk izLrkoA
Cost of Value of Variation Variation %
Works Cost as Work Value of As per
as per per C.B. Execute Work As per C.B. C.B. with
Power oSfj;s'ku dk dkj.k
Project GO (witho d Execute As per GST As per
S.No Town Project Name Connecti As per As per C.B. with
Code (withou ut GST) (without d with Estimae (3- Estimat
t GST) GST) on C.B. GST
(In GST (In 1) e
(3-2) (4-1)
(In Lakh) (In Lakh)
Lakh) Lakh)
1 2 3 4 1 2 43 5 6 7 8 9 13 14 12
Nagar Nigam
Gorakhpur
Drinking Water
UTT- dk;Z esa o`f} ,oa
Pipe Line 4302.0 (-)
1 Gorakhpur GOR- 4532.83 4430.66 4964.71 0.00 (-) 102.17 128.65 431.88 (+) 2.99% (+) 9.53% th0,l0Vh0 en ds
Extension and 1 2.25%
024 dkj.k
House
Connection
Scheme
Hathras Water
UTT- dk;Z esa deh ,oa
Supply Re- 3275.6 (-)
2 Hathras HAT- 3538.29 3090.24 3483.34 101.62 (-) 448.05 (-) 185.43 46.67 (-) 5.66% (+) 1.32% th0,l0Vh0 en ds
organization 7 12.66%
010 dkj.k
(Zone-2 3 6 7)
Ghaziabad
Sewerage
UTT- dk;Z esa o`f} ,oa
Scheme Phase-1 8875.4 (-)
3 Ghaziabad GHA- 9695.03 8910.41 9988.56 0.00 (-) 784.62 34.95 293.53 (+) 0.39% (+) 3.03% th0,l0Vh0 en ds
in NNG 6 8.09%
003 dkj.k
Ghaziabad Distt
Ghaziabad
ve`r dk;Zdze ds vUrxZr 09 ifj;kstuk;sa ftudh iz'kklfud ,oa foRrh; Lohd`fr esa th-,l-Vh- vfrfjDr ns; gS ,oa dk;kZsa
esa deh@o`f) ds dkj.k dk;Z ykxr esa oSfj;s'ku dk izLrkoA
Cost of Value of Variation Variation %
Works Cost as Work Value of As per
as per per C.B. Execute Work As per C.B. C.B. with
Power oSfj;s'ku dk dkj.k
Project GO (witho d Execute As per GST As per
S.No Town Project Name Connecti As per As per C.B. with
Code (withou ut GST) (without d with Estimae (3- Estimat
t GST) GST) on C.B. GST
(In GST (In 1) e
(3-2) (4-1)
(In Lakh) (In Lakh)
Lakh) Lakh)
1 2 3 4 1 2 34 5 6 7 8 9 13 14 12
Meerut
Sewerage UTT- dk;Z esa o`f} ,oa
10712.3 10479. 10540.8 11792.8 (-)
4 Meerut Scheme Zone 6 MEE- 0.00 (-) 171.54 61.53 1080.5 (+) 0.59% (+) 10.09% th0,l0Vh0 en ds
9 32 5 9 1.60%
(Part-1 Phase-1) 012 dkj.k
district- Meerut
Nagar Nigam
UTT- dk;Z esa o`f} ,oa
Ayodhya Water 4107.3 (-)
5 Ayodhya AYO- 4873.06 4466.32 5212.83 149.19 (-) 406.74 359.01 339.77 (+) 8.74% (+) 6.97% th0,l0Vh0 en ds
Supply Scheme 1 8.35%
011 dkj.k
Phase-III
Recycle of
Backwash and
UTT- dk;Z esa o`f} ,oa
Clear Water (-)
6 Kanpur Nagar KAN- 829.84 729.99 801.63 916.75 18.93 (-) 28.21 71.64 86.91 (+) 9.81% (+) 10.47% th0,l0Vh0 en ds
Leakage at 3.40%
021 dkj.k
Benajhaber WTP
Kanpur
ve`r dk;Zdze ds vUrxZr 09 ifj;kstuk;sa ftudh iz'kklfud ,oa foRrh; Lohd`fr esa th-,l-Vh- vfrfjDr ns; gS ,oa dk;kZsa
esa deh@o`f) ds dkj.k dk;Z ykxr esa oSfj;s'ku dk izLrkoA
Cost of Value of Variation Variation %
Works Cost as Work Value of As per
as per per C.B. Execute Work As per C.B. C.B. with
Power oSfj;s'ku dk dkj.k
Project GO (witho d Execute As per GST As per
S.No Town Project Name Connecti As per As per C.B. with
Code (withou ut GST) (without d with Estimae (3- Estimat
t GST) GST) on C.B. GST
(In GST (In 1) e
(3-2) (4-1)
(In Lakh) (In Lakh)
Lakh) Lakh)
1 2 3 4 1 2 3 4 5 6 7 8 9 13 14 12
Azamgarh NPP
Reorgnisatation
water supply UTT- dk;Z esa deh ,oa
(-)
7 Azamgarh scheme in AZA- 595.18 587.3 582.5 658.99 0.00 (-) 12.68 (-) 4.80 63.81 (-) 0.82% (+) 10.72% th0,l0Vh0 en ds
2.13%
District 008 dkj.k
Azamgarh under
Amrut
Sewerage Work
in Vindhyachal
UTT- dk;Z esa o`f} ,oa
Zone NPP 4173.3 (-)
8 Mirzapur MIR- 4475.68 4323.77 4861.35 0.00 (-) 151.91 150.42 385.67 (+) 3.60% (+) 8.62% th0,l0Vh0 en ds
Mirzapur- 5 3.39%
004 dkj.k
DISTRICT
MIRZAPUR
ve`r dk;Zdze ds vUrxZr 09 ifj;kstuk;sa ftudh iz'kklfud ,oa foRrh; Lohd`fr esa th-,l-Vh- vfrfjDr ns; gS ,oa dk;kZsa
esa deh@o`f) ds dkj.k dk;Z ykxr esa oSfj;s'ku dk izLrkoA
Cost of Value of Variation Variation %
Works Cost as Work Value of As per
as per per C.B. Execute Work As per C.B. C.B. with
Power oSfj;s'ku dk dkj.k
Project GO (witho d Execute As per GST As per
S.No Town Project Name Connecti As per As per C.B. with
Code (withou ut GST) (without d with Estimae (3- Estimat
t GST) GST) on C.B. GST
(In GST (In 1) e
(3-2) (4-1)
(In Lakh) (In Lakh)
Lakh) Lakh)
1 2 3 4 1 2 3 4 5 6 7 8 9 13 14 12
Nagar nigam
Ayodhya UTT- dk;Z esa o`f} ,oa
14339. 18177.4 21247.2 (-
9 Ayodhya sewerage AYO- 1924.21 0.00 (-)1446.73 3838.48 1623.04 (+)26.77 (-)3.22% th0,l0Vh0 en ds
00 8 5 )7.37 %
scheme District- 017 dkj.k
1 part-1
41176.5 50869. 55323.8 63126.6
Total
1 41 6 7
Agenda 07
ve`r 2-0 dk;Zdze ds vUrxZr yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ Lohd`r ykxr :0 6635-71 yk[k
dh vkeaf=r bZ&fufonk la[;k 678@oh&13@131 fnukad 14-08-2023 fufonk ykxr :0 4759-69 yk[k
dh fufonk ij fu.kZ; ysus gsrq vkxkeh ,l0,y0Vh0lh0 esa izLrqr djus gsrq izLrkoA
76
ve`r 2-0 dk;Zdze ds vUrxZr yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ Lohd`r ykxr :0 6635-71 yk[k dh vkeaf=r bZ&fufonk
la[;k 678@oh&13@131 fnukad 14-08-2023 fufonk ykxr :0 4759-69 yk[k dh fufonk ij fu.kZ; ysus gsrq vkxkeh
,l0,y0Vh0lh0 esa izLrqr djus gsrq izLrkoA
ve`r 2-0 dk;Zdze ds vUrxZr yksuh uxj ikfydk ifj"kn dh yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ ;kstuk iz'kklfud ,oa foRrh; Lohd`fr uxj fodkl
m0iz0 “kklu ds “kklukns'k la[;k bZ&vkfQl dEI;wVj la[;k 1654768] la[;k&24@ve`r 2-0@ukS&5&2022 fnukad 02-11-2022 }kjk ykxr :0 6635-71
yk[k dh iznku dh xbZ FkhA
➢ v/kh{k.k vfHk;Urk] fuekZ.k e.My] m0iz0 ty fuxe ¼uxjh;½] xkft;kckn ds i=kad 678@fofof/k&13@131 fnukad 14-08-2023}kjk ;kstuk ds dk;Z gsrq
iqu% r`rh; ckj bZ&fufonk vkefU=r dh x;hA mDr fufonk lwpuk dk izdk'ku vej mtkyk ,oa fgUnqLrku VkbZEl] ubZ fnYyhesa fnukad 17-08-2023 dks
izdkf”kr djk;k x;kA
➢ fufonk esa fuEu fufonknkrkvksa dh fufonk izkIr gqbZ] ftudk fooj.k fuEukuqlkj gSA &
1. eSllZ ;ksxh dULVª0 da0 & eSllZ ,p0,e0,l0 bUQzkVsd izk0 fy0 ¼ts0oh0½] 3] eksrh ckx ghjk ckx] n;kyckx] vkxjkA
2. eSllZ vkj0ds0 bUthfu;lZ lsYl fy0] ch&116] izFke ¶yksj foHkwfr [k.M] xkserh uxj] y[kuÅA
3. eSllZ lrh’k dqekj ,.M da0] Mh&474]xksfoUniqje] xkft;kckn eSllZ th0vkj0,e0 bUQzkLVªsDpj izk0 fy0] Mh&473] xksfoUniqje ¼ts0oh0½] xkft;kcknA
4. eSllZ ,l0vkj0,l0 ,Dlizsl izk0 fy0eSllZ ,l0,e0 dULVª0] vkxjk ¼ts0oh0½ ,l&6] f}rh; ry] ÝsUMl VsMZ] usg: uxj] vkxjkA
ve`r 2-0 dk;Zdze ds vUrxZr yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ Lohd`r ykxr :0 6635-71 yk[k dh vkeaf=r bZ&fufonk
la[;k 678@oh&13@131 fnukad 14-08-2023 fufonk ykxr :0 4759-69 yk[k dh fufonk ij fu.kZ; ysus gsrq vkxkeh
,l0,y0Vh0lh0 esa izLrqr djus gsrq izLrkoA
➢ fufonk ds rduhdh ewY;kadu ds mijkUr mijksDr 4 ¼pkj½ fufonknkrkvksa esa ls dze la[;k&1 ,o dze la[;k&3 ij vfadr QekZsa dks rduhdh :Ik ls
vugZ dj 'ks"k dze la[;k 2 o 4 ij vafdr QeksZa dks rduhdh :Ik ls vgZ ik;k x;k ,oa mDr nksuksa QeksZa dh foRrh; fcM+ [kksyh xbZA
➢ fufonk dh Lohd`fr ds lEcU/k esa fnukad 23-11-2023 dks izeq[k lfpo] uxj fodkl] m0iz0 “kklu dh v/;{krk esa xfBr jkT; Lrjh; rduhdh lfefr dh
19oha cSBd esa lfefr }kjk lE;d fopkjksia jkUr] ifj;kstukvksa ds vkSfpR; ds ijh{k.k gsrq fuxZr funZs”kksa ds vuqikyu esa izcU/k funs”kd egksn; m0iz0
tyfuxe ¼uxjh;½] y[kuÅ ds dk;kZy; Kki la0 148@la;qDr izcU/k funs'kd¼ukxj½ dSEi@2023 fnukad 12-12-2023 }kjk rduhdh lfefr dk xBu
fd;k x;kA
➢ lfefr }kjk iz“uxr ;kstuk ds vkSfpR; ds lEcU/k esa fnukad 30-12-2022 dks uxj ikfyd ifj"kn] yksuh {ks= dk LFkyh; fujh{k.k fd;k x;k] ftlesa
fuEufyf[kr eq[; fcUnq ifjyf{kr gq, gS%&
1- uxj ikfydk ifj’kn] yksuh esa lh0MCyw0ch0ih0 ds vuqlkj o’kZ 2025 ds ?kjksa dh la[;k 165146 vkadfyr dh x;h gS rFkk orZeku esa
lhoj x`g la;kstu dk dojst 20172 ¼12-21 izfr'kr½ gSA fudk; {ks= esa lhojst O;oLFkk esa yxHkx 87-78 izfr“kr dk xSi gSA
ve`r 2-0 dk;Zdze ds vUrxZr yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ Lohd`r ykxr :0 6635-71 yk[k dh vkeaf=r bZ&fufonk
la[;k 678@oh&13@131 fnukad 14-08-2023 fufonk ykxr :0 4759-69 yk[k dh fufonk ij fu.kZ; ysus gsrq vkxkeh
,l0,y0Vh0lh0 esa izLrqr djus gsrq izLrkoA
1. uxj ikfydk ifj’kn] yksuh esa lh0MCyw0ch0ih0 ds vuqlkj o’kZ 2025 ds ?kjksa dh la[;k 165146 vkadfyr dh x;h gS rFkk orZeku esa lhoj x`g la;kstu
dk dojst 20172 ¼12-21 izfr'kr½ gSA fudk; {ks= esa lhojst O;oLFkk esa yxHkx 87-78 izfr“kr dk xSi gSA
2. yksuh uxj ds okMZ la0& 28 ,oa 41 ¼Mh0,y0,Q0 vadqj fogkj ,oa lknqYykckn½ dk ?kjsyw lhost Mh0,y0,Q0 vadqj fogkj Mªsu ds ek/;e ls 'kkgnkjk
Mªsu esa fuLrkfjr gksrk gSA mDr okMksZ dk Hkw&ry Lrj uhpk gksus ds dkj.k ukfy;ksa ls vksoj ¶yks gksdj ekxksZ ij nwf"kr ty Hkjko dh fLFkfr jgrh
gSAmDr ds lek/kku gsrq LFkkuh; tuizfrfuf/k;ksa }kjk dh x;h vis{kk ds dze mDr ;kstuk fojfpr dh xbZA
3. iz“uxr ;kstuk ds fdz;kUo;u ds mijkUr fudk; {ks= ds lhojst dojst esa O;kid izHkko ugha iMsx
+ kA mDRk ;kstuk ds fdz;kUo;u ds mijkUr lhojst
dojst esa ek= 4-19 izfr’kr dh o`f) gksxhA
4. ekuuh; gkbZdksVZ ds vkns'k fnukad 17-10-23 ds Pont no. 6 ds vuqlkj “In the view thereof, respondent no. 2 and 3 are directed
to consider the technical bids of petitioner before taking any final decision in the matter. They shall not deny
consideration of petitioner on the ground of blacklisting and in case petitioner is found qualified, respondents
shall also open their financial bid.” dk;Zokgh fd;s tkus ds fy, funsZf'kr fd;k x;k gS
ve`r 2-0 dk;Zdze ds vUrxZr yksuh lhojst ;kstuk ¼Qsl&3] ikVZ&1½ Lohd`r ykxr :0 6635-71 yk[k dh vkeaf=r bZ&fufonk
la[;k 678@oh&13@131 fnukad 14-08-2023 fufonk ykxr :0 4759-69 yk[k dh fufonk ij fu.kZ; ysus gsrq vkxkeh
,l0,y0Vh0lh0 esa izLrqr djus gsrq izLrkoA
mijksDRk ds n`f"Vxr rduhdh lfefr }kjk iz“uxr ;kstuk dks iqujhf{kr dj yksuh uxj ikfydk ifj"kn {ks= dks iw.kZ :Ik ls lhojst ls vkPNkfnr fd;s
tkus gsrq foLr`r ;kstuk fojfpr fd;s tkus dk er fLFkj gqvkA vr% mDRk fo"k;xr fufonk izfdz;k dk mDr izdj.k ,l0,y0Vh0lh0 lfefr ds le{k
fopkjukFkZ izLrqr gSA
Agenda 08
tjoy is;ty ;kstuk ds fufonk foxr SLTC dh cSBd esa LFkfxr fd;s tkus ds dkj.k tuin
lhrkiqj ds fl/kkSyh is;ty ;kstuk esa eSllZ fufru daLVªD'ku dh fufonk ij ij fopkj fd;s tkus dk
izLrkoA
81
tjoy is;ty ;kstuk ds fufonk foxr SLTC dh cSBd esa LFkfxr fd;s tkus ds dkj.k tuin lhrkiqj ds fl/kkSyh
is;ty ;kstuk esa eSllZ fufru daLVªD'ku dh fufonk ij ij fopkj fd;s tkus dk izLrkoA
tuin xks.Mk dh tjoy is;ty ;kstuk dh fufonk dh foRrh; fcM [kksyh tk pqdh gSA ftlesa eSllZ fufru daLVªD'ku }kjk nh xbZ njsa U;wure ik;h xbZ
gS ftlds vuqeksnu gsrq SLTC dh foxr rhu cSBdksa esa izLrqr dh xbZ lfefr }kjk bls LFkfxr dj fn;k x;kA
tuin lhrkiqj dh fl/kkSyh is;ty ;kstuk eSllZ fufrd daLVªD'ku }kjk izfrHkkx fd;k x;k gSA ftlesa fufru daLVªD'ku dh fcM dSfiflVh
i;kZIr ugh gSA ftlds dkj.k eSllZ fufru daLVªD'ku vugZ gks jgs gS ijUrq ;fn tjoy is;ty ;kstuk dk Vs.Mj fujLr gks tkrk gS rks eSllZ fufru
daLVªD'ku dh fcM dSfiflVh [kkyh gks tkus ds dkj.k fl/kkSyh is;ty ;kstuk gsrq vgZ gks tk;sx
a sA
lfefr ds le{k xks.Mk dh tjoy ;kstuk rFkk lhrkiqj dh fl/kkSyh is;ty ;kstuk ij fu.kZ; gsrq izLrko izsf"kr gSA
Agenda 09
ve`r& 2-0 dk;Zdze ds vUrxZr VªkUp&01 dh 04 ,oa VªkUp&02 dh 02 dqy 06 ifj;kstukvksa dh foRrh;
fufonk;sa] izFke U;wure fufofnr ykxr :0 24027-07 yk[k 21oha jkT; Lrjh; rduhdh Lohd`fr lfefr
dh cSBd fnukad 16-01-2024 esa lfefr ds le{k vuqeksnu gsrq izLrqr dh x;h Fkh ds vuqeksnu ij
fopkjA 83
06 Existing Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including
Date of GST but Labour Cess) % Propose
Sanctio Bid L-1 Total %
NIT Openin High/Low Cover Cover d New
ULB Tranc Project ned Cost Cost No. of Including Proposed
S.No District Project Title Publicati g Name of L1 with respect age age House
Name he Type Cost Rs. Rs. In Rs. In Bidder Labour Cess) Work
on Date Technic to Befor Connect
In Lacs Lakh Lakh s After
al Bid e ion
As Per As Per
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/s Jain Brothers,
Risiya Bazar
R/o Civil line OHT 1 nos,
Nagar
RISIYA Sitapur U.P( 51%) 7.99% 13.52% TW 3 nos ,
BAHRAI Tranc Water Panchayat 09.11.202 17.08.20
1 BAZAR 1732.01 1196.54 M/s Vikas Builders 1100.93 5 1196.541273.04 BELO BELO 1.02 100 4277 23.83 km
CH he-1 Supply Piped Water 2 23
(NP) R/o 291 Roti W W Distribution.
Supply
Godaam Sitapur U.P line
Scheme
(49%)
M/s Nitin
Construction
Company, 9/982, OHT 2 nos ,
Jarwal NP
Indira Nagar, TW 5 nos ,
BAHRAI JARWA Tranc Water Piped Water 28.03.202 11.04.20 2.01% 7.55%
2 2252.65 1563.21 Lucknow (51%) JV 1531.79 3 1563.211656.88 16 100 5051 38.00 km
CH L (NP) he-1 Supply Supply 3 23 Below Below
M/s Arjun Kumar, Distribution.
Scheme.
2/229, Vishal Khand line
Gomti Nagar,
Lucknow(49%)
8
4
06 Existing Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including
Date of % Propose
Sanctio Bid L-1 Total GST but Labour Cess) %
NIT Openin Cover d New
ULB Tranc Project ned Cost Cost No. of Including High/Low Cover Proposed
S.No District Project Title Publicati g Name of L1 age House
Name he Type Cost Rs. Rs. In Rs. In Bidder Labour Cess) with respect age Work
on Date Technic Befor Connect
In Lacs Lakh Lakh s to After
al Bid e ion
As Per As Per
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/s A.K.
Engineering Works,
Nawabganj R/o Tiwaripur,
OHT 2 nos ,
NAWA Nagar Palika Gorakhpur (70%) JV
TW 5 nos ,
BGANJ Tranc Water Parishad 03.07.202 05.08.20 M/s Kamini 2.81% 7.07%
3 GONDA 1842.01 1329.00 1291.65 4 1329.001389.88 26 100 3741 27.10 km
_G he-1 Supply Piped Water 3 23 Construction, C- Low Low
Distribution.
(NPP) Supply 190/106-C
line
Scheme. Bilandpur Bansgaon
Colony Gorakhpur
(30%)
M/s. Akir Husain
Contractor, R/o
Balpur Hazari,
Katra Nagar OHT 0 nos,
Colonelganj, Gonda
Panchayat TW 1 nos ,
Katra_ Tranc Water 03.07.202 14.09.20 (69%) JV M/s. 3.05% 7.12%
4 Gonda Piped Water 601.59 456.83 442.93 3 456.83 476.88 25 100 1992 14.26 km
G (Np) he-1 Supply 3 23 Chandra Prakash Low Low
Supply Distribution.
Jaiswal, R/o
Scheme line
Lakhma, Allipur
Bujurg, Utraula,
Balrampur (31%)
85
06 Existing Financial Bids under AMRUT 2 for Approval of SLTC
L-1 Cost
Departmental (Excluding
Cost GST but
(Excluding Including
Date of % Propose
Sanctio Bid L-1 Total GST but Labour Cess) %
NIT Openin Cover d New
ULB Tranc Project ned Cost Cost No. of Including High/Low Cover Proposed
S.No District Project Title Publicati g Name of L1 age House
Name he Type Cost Rs. Rs. In Rs. In Bidder Labour Cess) with respect age Work
on Date Technic Befor Connect
In Lacs Lakh Lakh s to After
al Bid e ion
As Per As Per
As Per Sanctio As Per Sancti
SOR ned SOR oned
Cost Cost
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
M/s OPG (70%)- OHT 12 nos,
Agra Water
VISHWA (30%)(JV), CWR 1 nos,
AGRA supply
Tranc Water 19733.5 27.09.202 26.12.20 E-11/A, Nirbhay 17144.4 19733.5 20214.3 13.12% 15.19% 388.27 km
5 AGRA (M. Project - 26432.43 5 56.25 66.42 38431
he-1 Supply 2 3 23 Nager , Gailana road 8 2 4 Below Below Distribution.
Corp) Bundu Katra
,Agra 282005, Uttar line Feeder
Area
Pradesh Main 10.95
M/s BK
Construction and
Bahjoi Water Co. JV M/s Banco OHT3 Nos ,
Water
Supply Construction Private 4.51% 11.22% TW 07 nos,
Bahjoi Tranc Supply 22.11.202 19.12.20
6 Sambhal Scheme 3648.99 2634.09 Limited Khara No. 4 2515.29 3 2634.092833.14 BELO BELO 9.50 100.00 9603 75.58 km
(NPP) he-2 (Coverag 3 23
Under A Lodhai, Shri W W Distribution.
e)
Amrut 2.0 Bapuji Complex line
Lodhai Shamshabad
Road Agra
26921.1 24039.0 26927.1 27859.1
Total 36516.68 63115.00
9 7 9 6
8
6
Risiya Bazar NP Water Supply Scheme - Bahraich
NAME OF PROJECT RISIA WATER SUPPLY SCHEME
NAME OF ULB & DISTRICT RISIA NAGAR PANCHAYAT & BAHRAICH
GO DEATIL 17/AMRUT 2.0/ NAU-5-2022, DATE - 21.10.2022
TOTAL COST Rs. 1732.01 Lacs. WORK COST Rs. 1585.67 Lacs. CENTAGE Rs. 146.34 Lacs.
COST OF BID Rs. 1196.54 Lacs.
Over Head Tank-1 Nos.,Tube well- 3 Nos.,Pump House- 3 Nos.,Distribution System- 23.838 Km., House Connection-4277 Nos., Rising Main- 760 m. etc.
WORK PROPOSED
M/s. A T C M/s. Jain Brother’s, JV M/s. M/s. Akankcha Enterprises M/s. Shailesh Kumar JV M/s.
NAME OF FIRM
Vikas Builder’s Gupta Associates
QUOTED COST % BELOW (-)1.25 (-)7.99 (-)1.41 (-)3.11
COST IN LACS 1181.58 1100.93 1179.67 1159.32
LOWEST COST QUOTED FIRM
M/s. Jain Brother’s, Sitapur (U.P.) (51%) JV M/s. Vikas Builder’s, Sitapur (U.P.) (49%)
% BELOW AGAINST ESTIMATE (-) 13.52 % BELOW AGAINST TENDER (-) 7.99
COST IN LACS 1100.93 87
JARWAL WATER SUPPLY REORGANISATION SCHEME - Bahraich
NAME OF PROJECT JARWAL WATER SUPPLY REORGANISATION SCHEME
NAME OF ULB & DISTRICT JARWAL NAGAR PANCHAYAT & BAHRAICH
GO DEATIL 22/AMRUT 2.0/ NAU-5-2022, DATE - 21.10.2022
TOTAL COST Rs. 2252.65 Lacs. WORK COST Rs. 2062.19 Lacs. CENTAGE Rs. 190.46 Lacs.
COST OF BID Rs. 1563.21 Lacs.
Over Head Tank-2 Nos., Tube well- 5 Nos., Pump House- 3 Nos., Distribution System- 38.165 Km, House Connection-
WORK PROPOSED
5051 Nos. Rising Main- 740 m.etc.
NIT DETAIL 673/W-51/25, DATE - 28.03.2023
NAME OF NEWS PAPER IN NIT PUBLISHED
AMAR UJALA (HINDI) & HINDUSTAN TIMES (ENGLISH), DATE - 04.04.2023
AND DATE
DATE OF TECHNICAL BID OPENING 11.04.2023
TOTAL BID RECEIVED 3
FIRM NO 1 FIRM NO 2 FIRM NO 3
M/S NITIN CONSTRUCTION COMPANY, M/S S.M. ECO INFRA PVT. LTD., AGRA M/S SSCC CONSTRUCTION (P), LTD.,
TOTAL BID QUALIFIED TECHNICALLY LUCKNOW (51%) JV M/S ARJUN KUMAR, LUCKNOW
LUCKNOW.(49%)
QUALIFIED / DISQUALIFIED QUALIFIED DISQUALIFIED QUALIFIED
1-Turnover- Minimum turnover required, i.e. Rs.
468.96 Lacs. Bidder turnover Rs.305.66 Lacs. only,
which is less the required turnover.
REASON FOR DISQUALIFICATION 2-Bid Capacity- Minimum bid capacity required, i.e.
Rs. 1563.21 Lacs. Bidder bid capacity Rs.1363.87
Lacs. only, which is less the required bid capacity.
FINANCIAL BID OPENING DATE 03.08.2023
M/S NITIN CONSTRUCTION COMPANY JV M/S SSCC CONSTRUCTION (P), LTD.
NAME OF FIRM
M/S ARJUN KUMAR
QUOTED COST % BELOW (-)2.01 (-)1.50
COST IN LACS Rs. 1531.79 Lacs. Rs. 1539.76 Lacs.
LOWEST COST QUOTED FIRM M/S NITIN CONSTRUCTION COMPANY, LUCKNOW (51%) JV M/S ARJUN KUMAR, LUCKNOW.(49%)
% BELOW AGAINST ESTIMATE (-)7.55 % BELOW AGAINST TENDER (-)2.01
COST IN LACS Rs. 1531.79 Lacs.
NAWABGANJ WATER SUPPLY REORGANISATION SCHEME - Gonda
NAME OF PROJECT NAWABGANJ WATER SUPPLY REORGANISATION SCHEME
NAME OF ULB & DISTRICT NAWABGANJ NAGAR PALIKA PARISHAD & GONDA
GO DEATIL 87/AMRUT 2.0/ NAU-5-2023, DATE - 28.06.2023
TOTAL COST Rs. 1842.01 Lacs. WORK COST Rs. 1709.77 Lacs. CENTAGE Rs. 132.24 Lacs.
COST OF BID Rs. 1329.00 Lacs.
Over Head Tank-2 No,Tube well- 5 Nos, Pump House- 4 Nos, Distribution System- 27.10 km,
WORK PROPOSED
House Connection-3741 Nos., Rising Main- 1440 m. etc.
NIT DETAIL 1334/W-48/03, DATE - 03.07.2023
NAME OF NEWS PAPER IN NIT PUBLISHED
DAINIK JAGRAN (HINDI) & HINDUSTAN TIMES (English), DATE - 05.07.2023
AND DATE
DATE OF TECHNICAL BID OPENING 05.08.2023
TOTAL BID RECEIVED 4
FIRM NO 1 FIRM NO 2 FIRM NO 3 FIRM NO 4
M/s. A.K. ENGINEERING M/s. ABHISHEK KUMAR M/S AWASTHI TUBEWELL M/s. ANJANA TIWARI,
WORKS, GORAKHPUR (70%) JV PANDEY, GORAKHPUR (70%) JV COMPANY, FATEHPUR. GORAKHPUR (70%) JV M/s. C.S.
TOTAL BID QUALIFIED TECHNICALLY
M/s. KAMINI CONSTRUCTION, M/s BRIJ ENGINEERING ENTERPRISES, LUCKNOW (30%)
GORAKHPUR (30%) WORKS, KANPUR (30%)
QUALIFIED / DISQUALIFIED QUALIFIED QUALIFIED DISQUALIFIED QUALIFIED
- - Tender Fee & EMD Not -
REASON FOR DISQUALIFICATION
Deposited
FINANCIAL BID OPENING DATE 25.09.2023
M/s. A.K. ENGINEERING M/s. ABHISHEK KUMAR M/S AWASTHI TUBEWELL M/s. ANJANA TIWARI,
NAME OF FIRM WORKS JV M/s. KAMINI PANDEY JV M/s BRIJ COMPANY GORAKHPUR JV M/s. C.S.
CONSTRUCTION ENGINEERING WORKS ENTERPRISES
QUOTED COST % BELOW (-)2.81 (-)2.39 (-)1.99
COST IN LACS Rs. 1291.65 Lacs. Rs. 1297.23 Lacs. Rs. 1302.55 Lacs.
LOWEST COST QUOTED FIRM M/s. A.K. ENGINEERING WORKS, GORAKHPUR (70%) JV M/s. KAMINI CONSTRUCTION GORAKHPUR (30%)
TOTAL COST Rs. 26432.43 (in Lakh) WORK COST Rs. 23943.44 (in Lakh) CENTAGE Rs. 2488.99 lacs
91
Bundu Katra Water Supply Scheme- Agra
FINANCIAL BID OPENING DATE Date :- 26-12-2023
QUOTED COST % BELOW (-) 5.25 % (-) 13.12% (-) 10.10 % (-) 12.20 %
LOWEST COST QUOTED FIRM M/s OPG (70%)-VISHWA (30%)(JV), E-11/A, Nirbhay Nager , Gailana road ,Agra 282005, Uttar Pradesh.
% BELOW AGAINST ESTIMATE (-) 15.19 % % BELOW AGAINST TENDER (-) 13.12 %
92
Bahjoi Nagar Palika Parishad Reorganization Water Supply Scheme, Sambhal
NAME OF PROJECT BAHJOI NAGAR PALIKA PARISHAD REORGANIZATION WATER SUPPLY SCHEME
TOTAL COST Rs. 3648.99 lacs WORK COST Rs. 3427.55 lacs CENTAGE Rs. 221.44 lacs
WORK PROPOSED OHT 3 Nos. (1300 KL/22M, 1500 KL/22M & 1000 KL/18M), Distribution System- 75.58 Km., TubeWell- 07 Nos. Rising Main 3.95 Km, & House Connection- 9603 Nos., etc.
M/s Santosh Kumar (JV) M/s C.K. Enterprisase Village & Post M/s Gupta Associates, P-196, Sector 23, Sanjay Nagar M/s BK Construction and Co. JV M/s Banco Construction
TOTAL BID QUALIFIED Dadora Etawah, U.P. 206126 Ghaziabad, Uttar Pradesh Private Limited Khasra No. 4 A Lodhai, Shri Bapuji Complex
TECHNICALLY Lodhai Shamshabad Road Agra
REASON OF DISQUALIFICATION - - -
Bahjoi Nagar Palika Parishad Reorganization Water Supply Scheme, Sambhal
FINANCIAL BID OPENING DATES Date :- 11.01.2024
M/s BK Construction and Co. JV M/s Banco M/s Santosh Kumar (JV) M/s C.K. M/s Gupta Associates, P-196, Sector 23, Sanjay
Construction Private Limited Khasra No. 4 A Enterprises Village & Post Dadora Etawah, Nagar Ghaziabad, Uttar Pradesh
Lodhai, Shri Bapuji Complex Lodhai Shamshabad U.P. 206126
Road Agra
NAME OF FIRM
M/s BK Construction and Co. JV M/s Banco Construction Private Limited Khasra No. 4 A Lodhai, Shri Bapuji Complex Lodhai Shamshabad Road
LOWEST COST QUOTED FIRM Agra
% BELOW AGAINST
% BELOW AGAINST ESTIMATE (-) 11.22 % (-) 4.51 %
TENDER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Sewera
BAREILL Bareilly Sewerage Sewer Line- 177.19
Tranch ge & 24536.0 1478.0 33002. 6721.6
1 Bareilly Y (M. Scheme For Central City 267965 12316 54218 30185 58.31 100 KM, STP- 1 Nos, SBR,
e-1 Septag 0 0 54 3
Corp) zone IPS 2 Nos,
e Mgt.
OHT- 2 Nos, Tube
100% (S/E
KANPU Extension of pipe line in Well - 3 Nos, Rising
Tranch Water 57250.0 6675.0 34705. 4049.0 157520 Area) 43.63
2 Kanpur R south and east area of 5951 323000 63152 36.53 Main -2.13 Km,
e-1 Supply 0 0 00 0 3 % (over All
(M.Corp) kanpur phase-ii Distribution Line 82.46
City)
KM
Water 24x7 Water Supply In Tubewell-3 Nos, OHT-
Ballia Tranch 1429.0
3 Ballia Supply Harpur Ward of NPp 600.00 750.00 287.00 10619 13454 0 1313 0.00 100 3 Nos, Distribution
(NPP) e-2 0
(24X7) Ballia Line-15.42 KM
96
07 Existing DPR for Approval of SLTC
CWAP Cost DPR Cost Existin Propo
Per Covarage
ULB Tranc Project (Rs. In Lacs) (Rs. In Lacs) Popula Capita g sed
S. No. District Project Title tion House House Proposed Work
Name he Type Cost
Capex O&M Capex O&M 2025 Connec Conne Before (% ) After (%)
2025
tion ction
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
UGR (100KL) 01 Nos,
Pump House, Cum
Panel Room 1 Nos,
Pump Set 2 Nos,
Reuse Treated Water for
Muzaffa Muzaffar Tranch Rising Main 100 mm
5 Reuse 32.5 MLD Kidwai Nagar 79.00 21.00 66.29 33.60 _ _ _ _ _ _
rnagar nagar e-2 Dia 25.00 MTR,
Muzaffarnagar
Gravity Main 400 mm
Dia 30 MTR, Screen
Chainal & other work
1 Job
Tube Well- 9(6N+3R)
Water
Nos, OHT-3 Nos,
Shahaba Tranch Supply Shahabad Nagar Palika 3139.5
6 Rampur 4310.00 431.00 845.70 48400 5876 3600 9680 20.00 100 Rising Main- 3.17 KM,
d (NP) e-2 (Cover Parishad Water Supply 5
Distribution Line-
age)
64.57 KM
Tube Well- 2 Nos,
Water
OHT-1 Nos, Rising
Tranch Supply Saifani Water Supply 1549.2
7 Rampur Saifani 1310.00 131.00 483.80 26100 5377 2200 5220 60.00 100 Main- 0.285 KM,
e-2 (Cover Scheme 9
Distribution Line-
age)
43.275 KM
90773.0 9723.0 77056. 13240. 195909 53245. 385664. 112594
Total 0 0 70 19 9.00 88 00 .00
97
BAREILLY SEWERAGE EXTENSION SCHEME FOR
CENTRAL CITY ZONE IN BAREILLY NAGAR NIGAM,
DISTT. BAREILLY
UNDER
AMRUT 2.0 PROGRAMME
(CENTRAL ZONE - SUB ZONE 1-5)
CONSTRUCTION DIVISION,
UP JAL NIGAM (URBAN),
BAREILLY
SALIENT FEATURES
Bareilly Nagar Nigam
Requirement
75.97 28.86 19.3 33.13 157.3
(2040)
Constructed
35 0 0 0 35
(AMRUT 1.0)
35 MLD STP
Contructed under
Amrut 1.0 Namami
Gange (under 0 42 20 1 63
Construction)
42 MLD STP
Under Proposed
25 0 0 33.0 58
contruction (AMRUT 2.0)
by Namami
gange 1.3
Balance
20 MLD STP Under contruction by
Namami gange
SALIENT FEATURES
Bareilly Nagar Nigam
Population Sewage Generation (MLD)
S. No. Sub Zone 2025 2040 2055 2025 2040 2055
1 Sub Zone-1 33424 42854 54469 3.61 4.63 5.88
2 Sub Zone-2 46599 59747 75885 5.03 6.45 8.20
3 Sub Zone-3 98203 125910 160036 10.61 13.60 17.28
4 Sub Zone-4 30768 39449 50142 3.32 4.26 5.42
5 Sub Zone-5 58971 75607 96102 6.37 8.17 10.38
6 Sub Zone-6 100903 129371 164439 10.90 13.97 17.76
COVERED
7 Sub Zone-7 155427 199275 253288 16.79 21.52 27.36 UNDER
8 Sub Zone-8 24315 31173 39670 2.63 3.37 4.28 AMRUT 1
Total (Central Zone) 548610 703385 894029 59.25 75.97 96.56
SUB ZONE-5
35 MLD STP UNDER AMRUT 1 42 MLD STP UNDER NMCG
SUB ZONE-3
(CENTRAL ZONE ) (NORTH DEVELOPMENT ZONE )
SUB ZONE-7
SUB ZONE-6
SUB ZONE-8
SALIENT FEATURES
Bareilly Nagar Nigam
• Total capacity of STP required for Central City Zone - 75.96 MLD
• Capacity of existing/under execution STP - 35 MLD
• Balance Capacity - 40.97
• 12.43 MLD Sewage from Sub Zone 4 & 5 Treated at 42 MLD STP at Bisalpur road
(North Development Zone)
• Proposed 25.0 MLD STP (at Sarai Talfi) for Sub Zone for sub zone 1, 2 & 3
PROP. R.M.
35 MLD STP UNDER AMRUT 1 PROP. R.M. 42 MLD STP UNDER NMCG
(CENTRAL ZONE ) (NORTH DEVELOPMENT ZONE )
PROPOSED 25 MLD STP UNDER AMRUT 2.0 EXISTING TRUNK UNDER AMRUT 1
(CENTRAL ZONE - SUB ZONE 1 TO 5)
Project Cost
1 Abstract of Cost
Sewer lines and appurtenances 177.19 km 14294.86
House service connections 30185 Nos. 6265.61
Sewage treatment Plant (SBR) 25 MLD 3898.70
Intermediate Pumping Station (IPS-1) (C.I. Park) 1 Job 778.84
Intermediate Pumping Station (IPS-2) (Haziyapur) 1 Job 1027.18
Sewer cleaning machine (Suction cum Jetting machine) 1 No. 54.08
2 Sub Total (1) 26319.26
3 Less @ 5% due to efficiency 5% 1315.96
4 Sub Total (2 - 3) 25003.30
5 Labour Cess, GST, Centage 31.50% 7876.04
6 Power Connection 123.20
7 Sub Total (5+6+7) 33002.53
8 O&M for 5 Years 6721.63
9 Grand Total 39724.16
ECONOMICS OF SCHEME
Base year Mid year Design year
Sl Description
2025 2040 2055
1 Population 267965 343567 436634
7 Total income Considering 90% Revenue collection ( Rs in Lacs) 1024.10 1541.46 2283.83
9 Profit or Lost per year ( Rs in Lacs) (+ve/-ve = profit/loss) 7.66 240.40 644.50
S.
Description Base year 2025 Mid year 2040 Design year 2055
No.
Description Nos. %
S.
No.
Sr. No. Kanpu Initial Mid Design Dedicate Actual Dedicate Dedicate Bulk Present Mid Design Dificit Dificit(-
r W/s Stage Stage populatio d WTP Running Runnin d d (WTP demand Demand Stage period (- )/Excess(
zone populatio populatio n 2055 (MLD) WTP g tubewell + from demand( demand( )/Exce +)
n (2025) n (2040) Present tubewel discharg Tubewel factory MLD) MLD) ss(+) ultimate
status l nos e (MLD) l)MLD and mid stage(M
(MLD) instituti stage( LD)
on(MLD MLD)
)
160(bena
200MLD(
jhaber
Barrage)
WTP)+
+280ML
Inner 200(Barr
D(Benajh
i Old 1531033 1646245 1855044 age 46 34.5 406.5 264.10 283.98 320.00 122.52 86.50
aber)+
Area WTP)+
12(Gujain
12MLD(
iWTP) =
Gujaini
492MLD
WTP)
200MLD
(Barrage) 200(Barr
South
+ 45 age
and
ii 1559200 1715139 1886512 MLD WTP)+ 69 51.75 288.75 5.6 268.96 295.86 325.42 -12.71 -42.27
East
(Gujaini) 37(Gujai
area
= ni WTP)
245MLD
West 200MLD 200(Barr
iii 600733 991116 1599017 45 33.75 233.75 55.5 103.63 170.97 275.83 7.28 -42.08
area (Barrage) age)
3690966 4352500 5340573 937 809 160 120 929 61.1 372.59 750.81 921.25
dkuiqj uxj esa is;ty O;oLFkk dh fLFkfr
A
Water demand as per CWAP for year 2025 (MLD)
618.22
B Water Availability as per CWAP for year 2025 (MLD) 809
C Gap in water demand as per CWAP for year 2025 (MLD) NIL
CWAP ,oa DPR ds vuqlkj ykxr ,d n`f’V esa
1 2 3 4 5 6 7 8
1 forj.k iz.kkyh 500-00 Capex forj.k iz.kkyh 562-17 Capex •CWAP esa th0,l0Vh0 dh nj 12
¼x`g la;kstuksa fd0eh0 572-50 ¼x`g la;kstuksa fdeh- 347-05 izfr”kr yh x;h Fkh] tks vc 18
lfgr½ djksM lfgr½ djksM+ izfr”kr yh x;h gSA
+ 63152
ux
2 uydwi 4 ux uydwi 12 ux
3 LVksjst 1-75 LVksjst 17720
,e0,y mPp tyk”k; fd0yh0
0Mh0
4 jkbZftax esu & jkbZftax esu 1-86
fd-eh-
;kstuk dh vko”;drk@vkSfpR;
• o’kZ 2011 dh tux.kuk ds vuqlkj dkuiqj is;ty ;kstuk Qk¡j lkmFk ,oa bZLV lfoZl
fMfLVªDV] tuin dkuiqj uxj esa dqy lfEefyr 33 okMZ gSa] ftudh dqy tula[;k
1007142 gSA
• vk/kkj o’kZ 2025 gsrq dkuiqj is;ty ;kstuk Qk¡j lkmFk ,oa bZLV lfoZl fMfLVªDV dh
vkadfyr tula[;k 1559200 gSAa
• dkuiqj uxj dk o’kZ 2011 ds ckn vf/kdre fodkl bZLV o osLV {ks=ksa esa gqvkA bZLV
,oa lkmFk {ks= esa ts0,u0,u0;w0vkj0,e0 dk;ZØe ds vUrxZe 400,e0,y0Mh0 {kerk
dk b.Vsd oDlZ] 200 ,e0,y0Mh0 {kerk dk ty “kks/ku l;a=] 36 ux tksuy ifEiax
LVs”ku rFkk 4 ux V~;wcosy tksu dk fuekZ.k dj fn;k x;k FkkA bl {ks= esa ubZ cfLr
,oa dkyksuh ds fodflr gksus ds dkj.k dqy 10 ux tksuy ifEiax LVs”kuksa ,oa
562-17 fdeh- ikbi ykbu izLrkfor fd;k x;k gSA
• ve`r 2-0 dk;Zdze gsrq tkjh fn”kkfunsZ”kksa esa is;ty vkiwfrZ ds ekudksa ds mPphdj.k
172.50 LPCD (150 + 15%) ds vuqlkj is;ty vkiwfrZ dh tkuh gSA
DPR ds vuqlkj] dkuiqj uxj esa is;ty O;oLFkk gsrq izLrkfor dk;Z
fLFkfr
Ø0la uydwi forj.k LVksjst QhMjesu x`g j[kj[kko ,oa
0 iz.kkyh la;kstu lapkyu
1 2 3 4 5 6 7
(OHT + CWR)
1 12 Nos. 562.17 Km. 14.73 Km 63152 5 Years
(13650 KL + 4070 KL = 17720 KL)
dkuiqj uxj is;ty ;kstuk tuin&dkuiqj uxj ds
vUrxZr tksfaux dk vk/kkj
1 2 3 4 6 7 8 9 10 11
Sajari Gaon, KDA
19, Sanigwan 650/20m 200 1 No. 0.10 37.44 1091
Land
Sajari Gaon, KDA
19, Sanigwan 800/22m 250 1 No. 0.10 39.11 892
Land
Opposite Sanjeev
Nagar Electric Bus 19, Sanigwan 1100/22m - 3 No. 1.00 32.76 1275
Depot, KDA Land
Existing Jal Kal
East & 30, Naubasta East
Campus, Yashoda 950/20m 300 1 No. 0.10 39.14 1470
(Sakrapur)
South Nagar
1 KDA Park, Deen
Service
District Dayal Puram Near 39, Hanspuram
2050/22m 700 1 No. 0.10 36.39 2813
Sardar Patel School, (Taudhakpur)
Taudhakpur
Satbari Road, Near Jai
67, Yashoda
Mohan Sweets and
Nagar East(Gopal 2050/22m 675 1 No. 0.10 45.84 2715
General Store, KDA
nagar)
Land
70, Tiwaripur
JK Colony Ground 1300/20m 425 1 No. 0.10 45.12 3930
(Central Ground)
dkuiqj uxj is;ty ;kstuk ds vUrxZr tksuokj izLrkfor dk;ksZa dk fooj.k
OHT Capacity
(in KL) Proposed
Water CWR Nos of Proposed Proposed
S. House
Supply OHT Location Beneficiary Wards Capacity Proposed Rising Main Distribution Line
No Connectio
Zone (in KL) Tube wells (in Km.) (Km)
n
1 2 3 4 6 7 8 9 10 11
77, Shayam
Shyam Nagar,
1 Manbhawan Park
Nagar 1350/22m 450 1 No. 0.10 47.88 4666
(Rampuram)
uksV& mijksDr leLr dk;Z iw.kZ gks tkus ds i”pkr~ dkuiqj uxj iw.kZ#i ls is;ty vkiwfrZ ls vkPNkfnr gks tk;sxkA
Water Demand Calculation For Mid Stage (2040)
Sr. No. Description South & East District
Services of Kanpur City
1 Total Population (Mid stage 2040) 1715139
2 Rate of Water supply (150 LPCD + 15%) 172.50
3 Total Requirement of Water (MLD) 295.86 + 5.6 (Ctt. Board)
4 Water Supply Through Surface Water (WTP) 288.75
(Ganga Barrage WTP – 200MLD, Gujaini - 37MLD, Tubwell –
51.75MLD )
5 Nos. of existing working tube wells 69
7 Total discharge by existing TW’s in MLD 51.75
8 Arrangement to be made for rest water requirement. 12.71
9 Discharge of proposed Tube well (Each) 1500 LPM
10 Discharge of TW in MLD 1.44
(16 hrs. pumping)
11 Nos. of Tube well required 9
12 Nos. of proposed Tube wells 12
OHT + CWR Capacity Calculation For Ultimate Stage (2055)
Sr. No. Description New Proposed ZPS for South & East
District Service of Kanpur City
1 Total Population (Ultimate stage 2055) 1886512
uksV%& iwoZ ls fufeZr voj tyk'k; ,oa uydwiksa dks ;kstuk esa lfEefyr dj fy;k x;k gSA
Ballia Nagar Palika Parishad
24x7 water supply scheme for Harpur ward (W.No.-
7)
District-Ballia
under
AMRUT 2.0
Construction division,
U.P. Jal Nigam (Urban), Ballia
Necessity of project
Ballia Nagar Palika parishad 24x7 water supply scheme for Harpur ward (W.No.-7),
Dist-Ballia
Design period Projected Water Water supplied Gap
pop. demand
Base year, 2025 10619 1.649 MLD 0 MLD 1.649 MLD
Mid stage, 2040 12860 1.997 MLD 0 MLD 1.997 MLD
Design year, 2055 17268 2.681 MLD 0 MLD 2.681 MLD
5 Households with water connection after execution of AMRUT 2.0 1313 100%
Project
Index plan
Proposed works
❖ Considering the topography & technical requirement, word is divided into 2 DMAs.
❖ Outcome: After completion of above works the word shall have 100% coverage of water
supply.
Abstract of cost
SL.N0. DESCRIPTION OF WORK QTY. UNIT AMOUNT (Rs. In lacs)
1 2 3 4 5
A. Civil work :
1 Pump house & Chlorinating room (3.6x3.0x3.0 & 2.0x1.8x3.0) 3 Nos 21.54
2 Rising main (125mm DI K-7) 1165 Rmt 42.34
3 RCC OHT (700KL/26.M Staging) 1 Nos 127.55
Distribution system (HDPE - 110 - 160 & DI K-7 of Dia 200MM-
4 300MM) 15427 Rmt 436.13
5 Boundary wall 308 Rmt 23.93
6 Approach roads and ancillary civil works 1 Job 18.93
7 Staff quarter 1 Job 10.58
Total (A) 681.00
B. E&M
1 Cost of Tubewell construction 3 Nos 60.540
2 Cost of pumping plant, Voltage stabilizer & Internal Electrification 3 Set 32.610
3 SCADA for New T/W 3 Job 36.450
4 Iron & Arsenic removal plant 3 Job 244.050
5 For ESR and distribution network 1 Job 25.400
6 For OHT 1 Job 1.200
7 Trial & Run for 3 month 1 Job 16.150
8 Master Control satation 1 Job 30.200
Total (B) 446.61
Total (A+B) 1127.61
Mar-25
May-24
Mar-24
Nov-24
Feb-25
Apr-25
Aug-24
Dec-24
Feb-24
Apr-24
Sep-24
Oct-24
Jun-24
Jan-25
Jul-24
S. N. Name of Activity
1 Tendering of scheme
4 Construction of OHT
5 Laying of distribution
6 House connection
9 Power connection
1 Base Year-2025
2 Mid Year-2040
3 Design Year-2055
4 Type of pipes-HDPE-100 (PN-6) Dia-110 mm to 160 mm, D.I.Pipe-200 mm dia. to 300
mm dia.-15427 Rmt,
Depth- 1.0 m + Dia. of Pipe (In Mtr.)
5 Smart Element – Provision of SCADA for remote operation of system is made.
6 Outcome/service level improvement –
Current status of covered household – 0.00% (As per actual site condition)
After completion this scheme, household coverage - 100%
Augmentation and Extension of Nagar
Panchayat Saidpur Water Supply Scheme,
District-Ghazipur
Under
AMRUT 2.0
Construction Division,
U.P. Jal Nigam (Urban), Ghazipur
Saidpur Nagar Panchayat
Necessity of Project
Augmentation and Extension of Nagar Panchayat Saidpur
Population
Water Supply Scheme
Design Period Projected Water Water Gap
Popn Demand Supplied
Base Year, 2025 30812 4.784 MLD 1.344 MLD 3.440 MLD
Mid Stage, 2040 39374 6.113 MLD 1.344 MLD 4.769 MLD
Design Year, 2055 49726 7.720 MLD 1.334 MLD 6.376 MLD
Existing Water Supply Infrastructure in NP.
• Water Supply of city is mainly based on Ground Water.
• Existing OHT – 1000 KL/18 M.
• Existing T.W – 02 No.
• Present House Connections - 2646
Saidpur Nagar Panchayat Coverage Status
Water House Connections
❖ Outcome: After completion of above works the town shall have 100% coverage of water
supply.
Abstract of Cost
AUGMENTATION AND EXTENSION OF NAGAR PANCHAYAT SAIDPUR WATER SUPPLY SCHEME
UNDER - AMRUT 2.0 PROGRAMME
DISTRICT - GHAZIPUR
GENERAL ABSTRACT OF COST (COMPREHENSIVE)
SL. Amount (Rs. In Lacs)
Description of Work Qty. Unit Total
No. Zone-I Zone-II Zone-III Zone-IV
1 2 3 4 5 6 7 8 9
A. Civil work :
1 Pump House cum Chloronome 7 Nos 6.84 13.68 13.68 13.68 47.88
2 Cost of Repair of Existing Pump House 2 Nos 2.63 2.64 0.00 0.00 5.27
3 Pillar girder type structure for rebore 2 Nos 1.35 1.35 0.00 0.00 2.70
4 Rising Main & Bye Pass arrangement 3425.00 Rmt 16.47 48.11 81.86 3.03 149.47
5 Over Head Tank 3 Nos 193.80 0.00 170.36 60.99 425.15
6 Cost of Repair of Existing R.C.C. Over Head Tank 1 Nos 0.00 13.78 0.00 0.00 13.78
7 Distribution System 42008.00 Rmt 490.74 374.32 264.97 118.06 1248.09
8 Boundary wall, Gate, Site development & approach Road 771.20 Rmt 12.41 22.60 22.60 14.28 71.89
9 Staff Quarter 3 Nos 19.54 19.54 19.54 19.54 78.16
10 Ground Water Recharge 4 Nos 7.86 11.79 3.93 7.86 31.44
11 Construction of new Master Control station 1 Nos 0.00 26.01 0.00 0.00 26.01
TOTAL (A) 751.64 533.82 576.94 237.44 2099.84
B. E&M Work :
1 Cost of Tubewell 9 Nos 45.30 67.94 45.30 42.59 201.13
Cost of Pumping Plant and Instrumentation - 7 No. New
2 9 Nos 28.33 41.25 25.83 24.63 120.04
tubewell & 2 No. Rebore TW
3 Required Equipement to be installed at OHT 4 Nos 5.05 5.05 5.05 3.65 18.80
4 Cost of Three Months Trial and Run 8 Job 7.22 10.83 7.16 5.30 30.51
SCADA for T/W- 7 Nos. New TW and 2 Nos rebore
5 9 Nos 9.90 14.85 9.90 9.90 44.55
tubewell
6 SCADA for OHT 4 Nos 1.20 1.20 1.20 1.20 4.80
7 SCADA for LCS (All Zone) 1 Nos 0.00 18.25 0.00 0.00 18.25
TOTAL (B) 97.00 159.37 94.44 87.27 438.08
TOTAL (A+B) 848.64 693.19 671.38 324.71 2537.92
8 Power connection with transmission line 7 Job 15.07 30.15 30.15 27.65 103.02
GRAND TOTAL (A+B+7+8) 863.71 723.34 701.53 352.36 2640.94
Per Capita Cost
May-24
Mar-24
Mar-25
Aug-24
Apr-24
Nov-24
Feb-24
Jun-24
Dec-24
Jan-25
Jan-24
Sep-24
Oct-24
Jul-24
Feb-5
Sr No Activity
1 Tendering of project
Mobilization of Manpower
3
and M/c
4 Tubewell Boring
7 Pump House
8 Distribution System
10 Boundary Wall
12 Road Reinstatement
1
Base Year-2025 Mid Year-2040 Design Year-2055
Parameter
pH 6.5-8.5 7-8
BOD 30 25-30
COD 100 80-100
TSS 50 30-40
Fecal Coliform N.A. CCT Work under
Progress
CWAP & DPR Cost Comparisona
Amount Rs. in Lacs
Proposed Cost of Project as Proposed Cost of Project as
per CWAP per DPR
CAPEX OPEX TOTAL CAPEX OPEX TOTAL
79.00 21.00 100.00 66.29 33.60 99.89
1 1 30 1 2 25 1
Cost of Proposed Works Under The Project
EXECUTIVE ENGINEER,
CONSTRUCTION DIVISION
U.P. JAL NIGAM (URBAN),
RAMPUR
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
NAGAR PANCHAYAT, SHAHABAD
174
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
EXISTING WATER SUPPLY SYSTEM
Old area has a intermittent water supply
system with huge losses at connection point
175
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
WARDS OF NAGAR PANCHAYAT SHAHABAD CONSIDERED IN PROJECT
SHAHABAD, RAMPUR
Ward No Ward Name Population (2011)
1 Ward No - 1 2095
2 Ward No – 2 2700
3 Ward No – 3 1677
4 Ward No – 4 2228
5 Ward No – 5 2128
6 Ward No – 6 2278
7 Ward No – 7 3507
8 Ward No – 8 2578
9 Ward No – 9 2976
10 Ward No – 10 1760
11 Ward No – 11 1753
12 Ward No – 12 2016
13 Ward No – 13 2510
14 Ward No – 14 2021
15 Ward No – 15 1716
16 Ward No – 16 2245
17 Ward No – 17 2088
Total 38276
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
POPULATION DETAILS OF OPERATIONAL ZONES
S.N. NAME SERVED POPULATION
Shahabad Nagar
2025 2040 2055
Panchayat
1 Zone-1 20982 26531 32947
03 nos
New Proposed
1 03 64.57 Km 9680 No’s 1 set
(1750 KL/20.0 M
1550 KL/22.0 M
750 KL/20.0 M)
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
5 Years O&M
Cost of Work Centage Total Capex
Cost
180
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
• MILAK
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
Geoinfo
SHAHABAD WATER SUPPLY REORGANIZATION SCHEME
Geoinfo
SAIFANI WATER SUPPLY SCHEME
EXECUTIVE ENGINEER,
CONSTRUCTION DIVISION
U.P. JAL NIGAM (URBAN),
RAMPUR
SAIFANI WATER SUPPLY REORGANISATION SCHEME
NAGAR PANCHAYAT, SAIFANI
• Population (2011) – 20145
• Population Base Year (2025) –
26100
• Total nos of Wards – 15
• Total nos of Households (2011) –
3360
Year 2025 2040 2055
188
SAIFANI WATER SUPPLY REORGANISATION SCHEME
EXISTING WATER SUPPLY SYSTEM
Old area has a insufficient water supply
system with several areas not feeded, also
with huge losses at connection point
189
SAIFANI WATER SUPPLY REORGANISATION SCHEME
Challenges
House Under
Utility Life NRW Supply Hours Meters Ground
Connections
Water is used
Large Number
Approx 20 % of Hand
with certain Intermittent
> 25 Years 50– 70 % Supply with No Metering Pumps and
existing Bore wells
arrangements 4-5 Hours
with No
Treatment
SAIFANI WATER SUPPLY REORGANISATION SCHEME
WARDS OF NAGAR PANCHAYAT SAIFANI CONSIDERED IN PROJECT
193
SAIFANI WATER SUPPLY REORGANISATION SCHEME
SCADA
Over Head Tanks Distribution system for
Sl. ZONES House Connection
Network T.W. and
O.H.T.
01 nos New
1 02 Proposed 43.28 Km 5220 No’s 1 Nos
850 KL/24m
SAIFANI WATER SUPPLY REORGANISATION SCHEME
5 Years O&M
Cost of Work Centage Total Capex
Cost
195
SAIFANI WATER SUPPLY REORGANISATION SCHEME
2 Population
26100 34000 43100
Geoinfo
Agenda 11
ve`r 2-0 dk;ZØe ds VªkWUp&2 ds vUrxZr xksM+/kb;k ukys ds pSusykbts”ku ,oa jkex<+rky ds th.kksZ)kj rFkk bUVjlsI”ku]
Mk;otZu ,oa VªhVesUV dh iqujhf{kr ;kstuk esa jkT; Lrjh; rduhdh Lohd`fr lfefr dh 18oha cSBd fnukad 10-11-2023
}kjk fuxZr funsZ”kksa ds Øe esa enu eksgu ekyoh; izkS|ksfxdh fo”ofo|ky;] xksj[kiqj ls dk;ksZa dh xq.krk dk izHkkoh ,oa
fu;fer vuqJo.k djus gsrq ,e0vks0;w0 djkus ls lEcfU/kr Ldksi vkWQ odZ ,oa njksa dh Lohd`fr ds laca/k esaA 201
ve`r 2-0 dk;ZØe ds VªkWUp&2 ds vUrxZr xksM/+ kb;k ukys ds pSusykbts”ku ,oa jkex<+rky ds th.kksZ)kj rFkk bUVjlsI”ku] Mk;otZu ,oa VªhVesUV
dh iqujhf{kr ;kstuk esa jkT; Lrjh; rduhdh Lohd`fr lfefr dh 18oha cSBd fnukad 10-11-2023 }kjk fuxZr funsZ”kksa ds Øe esa enu eksgu
ekyoh; izkS|ksfxdh fo”ofo|ky;] xksj[kiqj ls dk;ksZa dh xq.krk dk izHkkoh ,oa fu;fer vuqJo.k djus gsrq ,e0vks0;w0 djkus ls lEcfU/kr Ldksi
vkWQ odZ ,oa njksa dh Lohd`fr ds laca/k esaA
ve`r 2-0 dk;Zdze ds vUrxZr xksM+/kb;k ukys ds pSusykbts”ku ,oa jkex<+rky ds th.kksZ)kj rFkk bUVjlsI”ku] Mk;otZu ,oa VªhVesUV dh iqujhf{kr ;kstuk
vuqekfur ykxr :0 49564-83 yk[k lsUVst lfgr ,oa 44890-57 lsUVst jfgr VªkUps 2 esa fnukad 10-11-2023 dks jkT; Lrjh; rduhdh lfefr dh 18oha
cSBd esa vuqeksnu iznku djus gsrq fopkjkFkZ izLrqr dh x;hA cSBd ds dk;Zo`r la[;k 6820@ukS&05&23&69lk@2022&dEI;wVj la[;k&1645731] uxj
fodkl foHkkx&5 y[kuÅ fnukad 29-11-2023 ds }kjk ,tsaMk fcUnq la[;k&3 ij funsZf”kr fd;k x;k fd mDr ;kstuk gsrq enu eksgu ekyoh; izkS|ksfxdh
fo”o fo|ky;] xksj[kiqj ls dk;ksZ dh xq.krk dk izHkkoh ,oa fu;fer vuqJo.k djus gsrq vks0,e0;w0 dj fy;k tk;sA
Mªk¶V ,e0vks0;w0 ds vuqlkj enu eksgu ekyoh; izkS|ksfxdh fo”ofo|ky;] xksj[kiqj dks Scope of work/ Responsibility of University fuEufyf[kr
jgsxh%&
Responsibility of UNIVERSITY:
(1) UNIVERSITY shall play an advisory role and provide expertise and consultancy on projects and area of work mutually agreed upon.
(2) UNIVERSITY shall provide its infrastructural facilities for conducting activities of mutual interest on mutually agreed upon terms and
conditions.
(3) UNIVERSITY will prepare project reports of their visits and all other works related with the MOU.
(4) UNIVERSITY shall assist “EENKUPJNUGKP” in maintaining quality of construction and safe and successful timely completion of
project in reference to its work under MOU.
(5) UNIVERSITY shall assist the “EENKUPJNUGKP” necessary assistance through its experts as per their need for activities under MOU.
(6) UNIVERSITY shall collect samples from the site and get it tested in its own lab. 2
0
2
ve`r 2-0 dk;ZØe ds VªkWUp&2 ds vUrxZr xksM/+ kb;k ukys ds pSusykbts”ku ,oa jkex<+rky ds th.kksZ)kj rFkk bUVjlsI”ku] Mk;otZu ,oa VªhVesUV
dh iqujhf{kr ;kstuk esa jkT; Lrjh; rduhdh Lohd`fr lfefr dh 18oha cSBd fnukad 10-11-2023 }kjk fuxZr funsZ”kksa ds Øe esa enu eksgu
ekyoh; izkS|ksfxdh fo”ofo|ky;] xksj[kiqj ls dk;ksZa dh xq.krk dk izHkkoh ,oa fu;fer vuqJo.k djus gsrq ,e0vks0;w0 djkus ls lEcfU/kr Ldksi
vkWQ odZ ,oa njksa dh Lohd`fr ds laca/k esaA
A faculty of not below the rank of Associate Professor and having specialization of Structural Engineering
2 Two faculty member each having specialization in Structural Engineering and One Faculty Member having Soil Mechanics and Foundation
Engineering.
3 One faculty member from mechanical engineering of expert in relevant field
4 One faculty member from electrical Engineering of expert in relevant field
5 Other faculty member of departments may also be included as per the need of work.
The team leader/coordinator shall co-ordinate all the correspondences and other activities on behalf of the university.
enu eksgu ekyoh; izkS|ksfxdh fo”ofo|ky;] xksj[kiqj }kjk iz”uxr ;kstuk ds dk;ksZa dh xq.krk dk izHkkoh ,oa fu;fer
vuqJo.k djus gsrq MOU djus gsrq iqujhf{kr dk;Z ykxr :0 32411-73 yk[k dk 0-25 izfr”kr ftlds lkis{k dqy /kujkf”k :0 81-03 yk[k $
18 izfr”kr th0,l0Vh0 vFkkZr~ dqy /kujkf”k :0 95-62 yk[k] dh Lohd`fr iznku fd;s tkus gsrq lfefr ds le{k fopkjkFkZ izLrqr gSA 2
0
3
AMRUT 2.0 MISSION PROGRESS
204
AMRUT
AMRUT 2 Progress
2.0: Progress
CWAP for 106 projects (WS/ Sewerage) under Tranche 3 with Capex of Rs. 4807.84 Cr has been approved by SHPSC dated
20
22.12.2023. 5
AMRUT 2 Progress
350 341
300
278
268
250 231
220 223
200
150 133
100
50
0
Total Projects Approved by SLTC Approved by SHPSC EFC/PFAD Go Issued NIT Issued Work Started
Approved by Apex
106 Water Supply / Sewerage Projects of Tranche 3 under AMRUT 2.0 approved by SHPSC on 22/12/2023
AMRUT
AMRUT 2 Tendering
2.0: Status
Tendering Status
Bid Status
250 232
223
200
168
150 133
100
55
50
20
11 4
0
Total NIT to be Issued NIT Issued Technical bid to be Technical bid opened Technical bid under Financial bid Financial Bid Send to On hold
against opened including Evaluation At approved by SLTC SMD for Approval
P.F.A.D./E.F.C. Done retender Different Level
20
AMRUT 1.0 MISSION PROGRESS
208
AMRUT 1.0 – Project Snapshot
158,
93% 48, 98%
88, 80%
Category Total Tender cost Total Tender cost Total Tender cost
Number of Projects (With GST) ( In Cr) Number of Projects (With GST) ( In Cr) Number of Projects (With GST) ( In Cr)
Financial Progress
12000
10927.35
10000 9476.54
8000
6852.42
6450.22
6000
4074.93
4000
3026.32
2000 1450.81
1048.61
402.20
0
Ongoing Schemes [34] Completed Schemes [294] Total Schemes [328]
Tender Cost Expenditure Balance Fund
34 294 328
210
Household Connections – AMRUT 1.0
900848 819884
5 sewerage schemes listed under AMRUT are dependent on STPs being constructed under Namami Gange, affecting around 90,000 house connections.
• Moradabad Sewerage, Phase-2 (zone-2)
• Ayodhya Sewerage District-1 Part-1
• Sewerage Works in Mirzapur Zone of Mirzapur (NPP) for Abatement of pollution of River Ganga, District-Mirzapur
• Ghazipur Sewerage Phase-1
• Ghazipur Sewerage Phase-2
212
Project Status Update (AMRUT 1.0)
294
29
4 1
Tranche 3
214
Summary
Total 20 45 31 10 106
215
Tranche-3 Project Summary
Central New
No of Estimated CAPEX Cost (₹ Estimated O&M
Category Assistance (in Connection
Project crore) cost (₹ crore)
Cr) Proposed
Aspirational District 20 486.61 51.80 233.72 159111
Bundelkhand,
Sonbhadra,
45 1,751.31 416.98 827.67 312040
Chandauli &
Mirzapur
Other Proposed
10 858.46 82.27 281.20 141669
Scheme
Coverage Status
217
100% W/S Coverage Status – Post implementation of Tranche 1, 2 & 3
Total No. ULBs – 762
218
Coverage
AMRUT 2.0:Status ( Post
Tendering implementation of Tranche 1,2 and 3 )
Status
• All 72 ULBs under the Bundel Khand Region along with Mirzapur, Chandauli and Sonbhadra will
be saturated after Tranche 3
21
Action 2.0:
AMRUT Plan for Saturation
Tendering Status of Balance 448 ULBs
Estimated Amount of Capex Required for saturation of 11 Nagar Nigam– Rs 9,600 Cr Approximately
• Estimated Amount of Capex Required for Saturation of remaining 437 ULBs – 18,500 Cr Approximately
The State is planning for 100 % Drinking water supply saturation through financial assistance from
Central Special Infrastructure Development Fund, State Urban Infrastructure Development
Fund, Loans from ADB,JICA, KfW, SIDBI, PPP, Convergence etc.
22
Household Coverage Summary – Water Supply
Households Covered with water tap Connections before AMRUT 2.0 : 52.87 Lacs
New House Connections Proposed Under AMRUT 2.0( Tranche 1,2&3) : 43.04 Lacs
Total Households covered with water tap Connections after AMRUT2.0 : 95.91 Lacs
221
Household Coverage Summary – Sewerage
Households Covered with Sewer Connections before AMRUT 2.0 : 22.90 Lacs
New House sewer connections Proposed Under AMRUT 2.0( Tranche 1,2&3) : 5 Lacs
Total Households covered with house sewer connections after AMRUT2.0 : 27.90 Lacs
222
AMRUT 1 – Ongoing Schemes
223
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Including Expenditur l l
# District Project Name Project Type Start Date Issues Target Month Target
GST (In e Till Date Progress Progres
Month
Lakhs) (In Lakhs) (%) s (%)
* Sewer laying completed
* 4000 house connection
Etah City Sewerage Scheme
1 Etah Sewerage 02/06/2020 8,861.23 8,246.20 93.06 98 Pending 31-12-2023 31-1-2024
Phase- III
* Limit of Rs 1.5Cr
required.
* Railway permission
applied
Saharanpur Sewerage Scheme * Approx 1.75 month
2 Saharanpur Zone-1 sub Zone-1 Saharanpur Sewerage 16/02/2019 9,476.47 9,063.53 95.64 97.55 required after railway 31-10-2023
Nagar Nigam Distt Saharanpur permission.
* Variation approved.
* Go Awaited
Aligarh Reog WS Scheme Part- Water * Short closure to be done.
3 Aligarh 05/03/2019 12,428.40 11,152.52 89.73 95.5 31-12-2023 15-2-2024
3 Supply * 1Cr Penalty imposed
SITC of Automation ( PLC
SCADA with all others
electrical instrumentation * 50% Software work is
items /hardware) for SPSs completed. Web page yet
4 Varanasi MPSs STPs and Online Sewerage 10/06/2021 709.85 574.86 80.98 95 to be developed. 31-1-2023
Continuous Influent/Effluent * Third party vendor
Monitoring System (OCEMS) doing customization
of Dinapur Bhagwanpur
Goithaha STP Dist Varanasi
224
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Project Including Expenditur l l Target
# District Project Name Start Date Issues Target
Type GST (In e Till Date Progress Progres Month
Month
Lakhs) (In Lakhs) (%) s (%)
* Connection Completed
Lalitpur Reorg Water Supply Water * NOC required from Hydel
5 Lalitpur 01/09/2019 3,990.42 3,867.63 96.92 95 31-12-2023 31-1-2024
Scheme Supply for Pole
* ULB Share of 3.43Cr pending
* Completion of 15000
Connection by Feb-24
Gorakhpur Sewerage Scheme Sub
7 Gorakhpur Sewerage 28/03/2022 14,589.41 14,911.48 102.21 95 * 8.5Cr payment made to 31-1-2024 28-2-2024
Zone C-2 Part-1
Hydel
* ULB Share pending
*Namami Gange STP to be
Moradabad Sewerage Phase-2
8 Moradabad Sewerage 07/01/2020 18,106.50 10,018.27 55.33 94 completed by Dec. 24. 31-1-2024 15-2-2024
(zone-2)
* Variation Approval required
Ayodhya Sewerage District-1 Part- * Dependency on Namami
9 Ayodhya Sewerage 27/08/2021 18,411.34 17,005.48 92.36 93 30-6-2024
1 Gange STP
Bareilly Central zone Phase III
10 Bareilly Branch sewer and House Sewerage 26/06/2020 3,910.76 3,772.20 75.84 93 *Inter-connection pending. 31-1-2024 15-2-2024
connection
225
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Project Including Expenditur l l Target
# District Project Name Start Date Issues Target
Type GST (In e Till Date Progress Progres Month
Month
Lakhs) (In Lakhs) (%) s (%)
* Survey done
Kanpur
14 District-III Zone-I Kanpur Sewerage Sewerage 28/03/2018 10,177.15 7,809.54 76.74 89 * Dependent on State sector 31-12-2023
Nagar
trunk line project.
226
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Project Including Expenditur l l Target
# District Project Name Start Date Issues Target
Type GST (In e Till Date Progress Progres Month
Month
Lakhs) (In Lakhs) (%) s (%)
227
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Project Including Expenditur l l Target
# District Project Name Start Date Issues Target
Type GST (In e Till Date Progress Progres Month
Month
Lakhs) (In Lakhs) (%) s (%)
228
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
229
Ongoing Schemes – AMRUT 1.0 (99 - 76 %)
Tender Cost Total Financia Physica
Revised
Project Including Expenditur l l Target
# District Project Name Start Date Issues Target
Type GST (In e Till Date Progress Progres Month
Month
Lakhs) (In Lakhs) (%) s (%)
230
Ongoing Schemes – AMRUT 1.0 (75-51%)
Total
Tender Cost Financia Physica
Expenditu Revised
Project Including l l Target
# District Project Name Start Date re Till Issues Target
Type GST (In Progress Progres Month
Date (In Month
Lakhs) (%) s (%)
Lakhs)
* Railway NOC: Permission
Lucknow Water Supply Scheme of Water pending for crossing of
30 Lucknow 20/04/2021 2,792.60 1,972.95 70.65 71 31-12-2023
Smart City Qaisarbagh ABD Area Supply * Rakabganj railway bridge
from Railway Department
231
Ongoing Schemes – AMRUT 1.0 (75-51%)
Total
Tender Cost Financia Physica
Expenditu Revised
Project Including l l Target
# District Project Name Start Date re Till Issues Target
Type GST (In Progress Progres Month
Date (In Month
Lakhs) (%) s (%)
Lakhs)
* Dependent on another
scheme
Sewer House connection Sewerage * Approval on variation is
33 Lucknow Sewerage 02/08/2019 8,120.83 2,134.37 26.28 54 31-12-2023
District-4 zone-4 Phase-II Lucknow required
*Connection work will start
after 15-Jan-24
232
Ongoing Schemes – AMRUT 1.0 (50 - 25%)
Total
Tender Cost Financia Physica
Expenditu Revised
Project Including l l Target
# District Project Name Start Date re Till Issues Target
Type GST (In Progress Progres Month
Date (In Month
Lakhs) (%) s (%)
Lakhs)
233
AMRUT 2.0 – Ongoing Schemes
234
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
SAINTHAL NAGAR
PANCHAYAT
CD Water
3 BAREILLY SAINTHAL (NP) REORGANIZATION 10-3-2023 924.79 58 58.56
BAREILLY Supply
WATER SUPPLY SCHEME,
DISTRICT - BAREILLY
MEERGANJ NAGAR
CD Water PANCHAYAT
4 BAREILLY MIRGANJ_B (NP) 10-3-2023 932.02 52 61.33
BAREILLY Supply REORGANIZATION
WATER SUPPLY SCHEME
Fatehganj (East) Nagar
CD FATEHGANJ PURVI Water Panchayat Reorganisation
5 BAREILLY 10-3-2023 800.18 45 42.53
BAREILLY (NP) Supply Water Supply Scheme ,
District - Bareilly
23
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement with Financial Progress
# District Division ULB Form Type Project title Project Start Date Progress
GST (in Lakhs) (%age)
(%age)
GANGAPUR NAGAR
CD-I Water PANCHAYAT
8 VARANASI GANGAPUR (NP) 10-3-2023 633.06 37 52.69
VARANASI Supply REORGANISATION
WATER SUPPLY SCHEME
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
THAKURDWARA Water Thakurdwara Nagar Palika
11 MORADABAD MORADABA 1-4-2023 2,858.94 47 54.94
(NPP) Supply Water Supply Scheme
D
23
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
Water Khanpur Water Supply
16 BULANDSHAHAR BULANDSAH KHANPUR (NP) 1-4-2023 1,013.30 70 64.16
Supply Scheme
AR
AGARWAL MANDI
CD AGARWAL MANDI Water TATIRI WATER SUPPLY
17 BAGHPAT 1-4-2023 701.19 45 47.16
BAGHPAT (TATIRI) (NP) Supply REORGANIZATION
SCHEME
MAWANA WATER
Water SUPPLY
19 MEERUT CD MEERUT MAWANA (NPP) 1-4-2023 6,644.98 23 38.38
Supply REORGANIZATION
SCHEME
HASTINAPUR WATER
Water SUPPLY
20 MEERUT CD MEERUT HASTINAPUR (NP) 1-4-2023 3,284.44 24 37.48
Supply REORGANIZATION
SCHEME
VIJAYGARH
Water
21 ALIGARH CD ALIGARH VIJAIGARH (NP) REORGANIZATION 6-4-2023 611.61 45 43.44
Supply
WATER SUPPLY SCHEME
23
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
SHISHGARH NAGAR
PANCHAYAT
CD Water
22 BAREILLY SHISHGARH (NP) REORGANIZATION 6-4-2023 1,310.41 46 54.11
BAREILLY Supply
WATER SUPPLY SCHEME,
DISTRICT- BAREILLY
REORGANIZATION OF
Water
24 ETAWAH CD ETAWAH LAKHNA (NP) LAKHNA WATER 8-4-2023 996.65 32 35.58
Supply
SUPPLY SCHEME
SIKANDRA NAGAR
PANCHAYAT WATER
CD KANPUR Water
25 KANPUR DEHAT SIKANDRA (NP) SUPPLY RE- 15-5-2023 1,226.79 28 36.78
DEHAT Supply
ORGANISATION
SCHEME
23
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement with Financial Progress
# District Division ULB Form Type Project title Project Start Date Progress
GST (in Lakhs) (%age)
(%age)
Bisharatganj Nagar
BISHARATGANJ Water Panchayat Reorganization
29 BAREILLY CD BAREILLY 4-6-2023 948.18 36 41.35
(NP) Supply Water Supply Scheme ,
District - Bareilly
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
Water Dhakia Nagar Panchayat
32 MORADABAD MORADABA DHAKIA (NP) 27-6-2023 828.58 64 68.80
Supply Water Supply Scheme
D
RAJPUR NAGAR
CD KANPUR Water PANCHAYAT WATER
34 KANPUR DEHAT RAJPUR (NP) 7-7-2023 930.02 17 32.89
DEHAT Supply SUPPLY RE-
ORGANISATION SCHEME
Pachperwa Nagar
CD Water Panchayat Piped Water
36 BALRAMPUR PACHPERWA (NP) 1-8-2023 2,049.39 22 30.89
BALRAMPUR Supply Supply Reorganisation
Scheme
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
GAURIGANJ NAGAR
PALIKA PARISHAD
CD Water WATER SUPPLY
37 AMETHI GAURIGANJ (NPP) 4-8-2023 4,182.25 25 36.06
SULTANPUR Supply REORGANIZATION
SCHEME FOR ZONE
(1,2,3,4) DISTRICT AMETH
Water Supply
Water Reorganization and House
40 BARABANKI CD-I Ayodhya FATEHPUR (NP) 25-8-2023 3,601.50 19 26.02
Supply Service Connections In
Nagar Panchayat Fatehpur
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
SARDHNA WATER
SUPPLY
Water
41 MEERUT CD MEERUT SARDHANA (NPP) REORGANIZATION 25-8-2023 4,122.29 12 24.92
Supply
SCHEME DISTRICT
MEERUT
KHARKHODA WATER
Water SUPPLY
42 MEERUT CD MEERUT KHARKHODA (NP) 25-8-2023 944.93 30 42.78
Supply REORGANIZATION
SCHEME
KARNAWAL WATER
Water SUPPLY
43 MEERUT CD MEERUT KARNAWAL (NP) 1-9-2023 997.22 18 24.04
Supply REORGANIZATION
SCHEME
PARIKSHITGARH WATER
PARIKSHITGARH Water SUPPLY
44 MEERUT CD MEERUT 1-9-2023 1,406.58 23 32.10
(NP) Supply REORGANIZATION
SCHEME
CD
Water MANDAWAR WATER
45 BIJNOR MORADABA MANDAWAR (NP) 5-9-2023 1,223.08 19 24.42
Supply SUPPLY SCHEME
D
CD
MORADABAD (M. Water Water Supply Scheme in
46 MORADABAD MORADABA 9-9-2023 6,479.27 32 45.07
Corp) Supply Moradabad Nagar Nigam
D
CD
Water Kanth Nagar Panchayat
47 MORADABAD MORADABA KANTH_M (NP) 16-9-2023 1,529.95 34 48.52
Supply Water Supply Scheme
D 24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
LUCKNOW WATER
SUPPLY FOR DISTRICT
LUCKNOW (M. Water
48 LUCKNOW CD HARDOI 'D's PART-1 WARDS 19-9-2023 14,534.76 6 23.71
Corp) Supply
SAROJINI NAGAR- I & II
AND IBRAHIMPUR-I
CD NPP Dataganj
Water
50 BUDAUN SHAJAHANP DATAGANJ (NPP) reorganisation water supply 12-10-2023 1,663.82 9.25 23.61
Supply
UR scheme
Muradnagar
CD-II MURADNAGAR Water
51 GHAZIABAD Reorganozation Water 12-10-2023 4,075.00 10 24.69
GHAZIABAD (NPP) Supply
Supply Scheme
CD
Water Samdhan Reorganization
52 KANNAUJ FARRUKHAB SAMDHAN (NP) 15-10-2023 2,876.84 15 26.69
Supply Water Supply Scheme
AD
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
Water Shamshabad Reorgnization
54 FARRUKHABAD FARRUKHAB SHAMSABAD (NP) 15-10-2023 3,590.82 15 24.91
Supply W/s Scheme
AD
Kaptanganj nagar panchayat
Water
55 BASTI CD BASTI Kaptanganj (NP) re-organisation water supply 18-10-2023 2,303.31 12 20.29
Supply
scheme
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
Physcial
Cost of Agreement with Financial Progress
# District Division ULB Form Type Project title Project Start Date Progress
GST (in Lakhs) (%age)
(%age)
WATER SUPPLY OF
CD
BULANDSHAHR Water BULANDSHAHR NAGAR
67 BULANDSHAHAR BULANDSAH 5-12-2023 780.15 10 25.27
(NPP) Supply PALIKA ZONE 4 UNDER
AR
AMRUT 2.0
CD
Water Water Supply of Naraura
68 BULANDSHAHAR BULANDSAH NARAURA (NP) 5-12-2023 879.56 12 27.43
Supply (NP).
AR
Sewerage/S
Nagar Palika Parshad Ballia
eptage
69 BALLIA CD BALLIA BALLIA (NPP) Sewerage Reorganisation 5-12-2023 6,897.52 3 17.60
Manageme
Scheme
nt
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
24
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
MUZAFFARNAGA CHARTHAWAL Water Charthawal Reorganization
82 MUZAFFARN 13-12-2023 749.45 2 22.63
R (NP) Supply water supply scheme
AGAR
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
BAHSUMA WATER
Water SUPPLY
88 MEERUT CD MEERUT BAHSUMA (NP) 15-12-2023 864.86 4 26.09
Supply REORGANIZATION
SCHEME
NAGAR PALIKA
GOLA GOKARAN Water PARISHAD GOLA
91 KHEERI CD SITAPUR 15-12-2023 5,012.20 2 18.15
NATH (NPP) Supply GOKARANNATH WATER
SUPPLY SCHEME
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
INTERCEPTION AND
Sewerage/
DIVERSION OF DRAIN
CD AYODHYA Septage
92 AYODHYA AND SEWAGE 15-12-2023 883.38 5 21.41
AYODHYA (M.CORP.) Manageme
TREATMENT PLANT IN
nt
FAIZABAD CANTT DRAIN
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
Water Supply
Water Reorganization and House
97 BARABANKI CD-I Ayodhya ZAIDPUR (NP) 22-12-2023 1,936.01 9 21.95
Supply Service Connections In
Nagar Panchayat Zaidpur
BUDHANA WATER
CD SUPPLY
MUZAFFARNAGA Water
99 MUZAFFARN BUDHANA (NP) REORGANISATION 28-12-2023 2,701.65 2 24.74
R Supply
AGAR SCHEME UNDER AMRUT
2.0 PROGRAMME
CD
Water Shikarpur Water Supply
101 BULANDSHAHAR BULANDSAH SHIKARPUR (NPP) 16-2-2024 1,540.99 0 9.95
Supply Scheme
AR
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD
MUZAFFARNAGA Water Purkazi Water Supply
103 MUZAFFARN PURQUAZI (NP) 1,735.61 1 15.01
R Supply Reorganization Scheme
AGAR
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
BAGHPAT WATER
SUPPLY
CD Water
108 BAGHPAT BAGHPAT (NPP) REORGANIZATION 3,884.55 0 0.00
BAGHPAT Supply
SCHEME UNDER AMRUT
2.0
KITHORE WATER
Water SUPPLY
110 MEERUT CD MEERUT KITHAUR (NP) 1,582.70 2 9.74
Supply REORGANIZATION
SCHEME
Sewerage/
House Sewer connection in
Septage
111 Agra CD-II AGRA AGRA (M. Corp) existing HCC of Agra 12-1-2024 1,537.80 2 10.08
Manageme
Nagar Nigam
nt
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
CD UN Water Supply
Water
113 SHAMLI MUZAFFARN UN (NP) Reorganisation Scheme 942.25 1 8.01
Supply
AGAR Under Amrut 2.0 Programe
AUGMENTATION AND
Water STRENGTHENING OF
114 JHANSI CD JHANSI JHANSI (M. Corp) 12,751.01 2 8.47
Supply NAGAR NIGAM JHANSI
WATER SUPPLY SCHEME
REHABILITATION AND
Water AUGMENTATION OF
115 LALITPUR CD JHANSI LALITPUR (NPP) 11,298.25 2 8.47
Supply LALITPUR WATER SUPPLY
SCHEME
Water Supply
Reorganization and House
Water
116 BARABANKI CD-I Ayodhya HAIDERGARH (NP) Service Connections in 1,412.27 12 21.86
Supply
Nagar Panchayat
Haidargarh
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
Reorganization of Samthar
Water
123 JHANSI CD JHANSI SAMTHAR (NPP) NPP Water Supply 1,545.19 0.5 8.47
Supply
SchemeDist Jhansi
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Physical & Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
Sewerage/
Septage RE-USE Treated water of 72
128 MEERUT CD MEERUT MEERUT (M Corp) 64.66 0 0.00
Manageme MLD STP
nt
KADIPUR NAGAR
CD Water PANCHAYAT
129 SULTANPUR KADIPUR (NP) 591.31 0 0.00
SULTANPUR Supply REORGANIZATION
WATER SUPPLY SCHEME
AMETHI NAGAR
PANCHAYAT
CD Water REORGANIZATION
130 AMETHI AMETHI_A (NP) 1,306.57 0 0.00
SULTANPUR Supply WATER SUPPLY SCHEME
(ZONE 1 , ZONE 2 )
AMETHI
25
AMRUT
AMRUT 2 Scheme
2.0: Tenderingwise Financial Progress
Status
Physcial
Cost of Agreement Financial
# District Division ULB Form Type Project title Project Start Date Progress
with GST (in Lakhs) Progress (%age)
(%age)
RE ORGANISATION OF
Water
132 AURAIYA CD ETAWAH Auraiya (NPP) NPP AURAIYA WATER 4,049.24 0.5 0.00
Supply
SUPPLY SCHEME
Water Supply
RAMPUR Water
133 JAUNPUR CD JAUNPUR Reorganisation in Nagar 1,352.41 0 0.00
(JAUNPUR) (NP) Supply
Panchayat Rampur
26
AMRUT 2.0 – Pending DPRs
261
AMRUT 2 Pending DPR- Tranche 1 [2]
Estimated Instruction
SWAP DPR Expected
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category in Last
Tranche Date
crore) meeting
Meet with
JALESAR JALESAR NPP WATER DPR under DM and close
1 1 ETAH Water Supply 42.8 Finding Source of Water 5-2-2024
(NPP) SUPPLY PROJECT prepration the issue on
high priority
Survey will be
Project for recycle of
Sewerage/Sept Forest Land (70 completed in
AGRA (M. used water of 2.25 DPR under
1 2 AGRA age 10.1 Hectare) kakreta 20-2-2024 10 days. Final
Corp) MLD Budhi ka Nagla prepration
Management survey going on DPR by
STP, Agra
20.02.2024
Aligarh Municipal
PPRBD Under
ALIGARH (M. Limit Extension Water Close in one
2 2 ALIGARH Water Supply 72.4 Observation/Apprais 5-2-2024 PPRBD
Corp) Supply Scheme Group- week
al
A
Harduaganj Nagar
Land issue: Land
HARDUAGA Panchayat Refused
4 2 ALIGARH Water Supply 18.6 previously given has 5-2-2024 Land Issue
NJ (NP) Reorganization Water providing land
been altered
Supply Scheme
Strengthening,
Automization and
AZAMGARH Reorganisation of Land identification DPR under
5 2 AZAMGARH Water Supply 77.62 7-2-2024 07-02-2024
(NPP) Water Supply System completed. prepration
in Azamgarh City
Distt Azamgarh
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
Land issue. All the
lekhpals will submit
the report of
availability/
Water Supply
unavailability of land Meet with DM
6 2 BALLIA BALLIA (NPP) Water Supply Reorganisation in NPP 120.334 Land Issue
in 3 days. Matter is close the issue
Ballia
Under DM
consideration. 1.7
hectare land required
for WTP
Water Supply PPRBD Under Final will be
DPR under
7 2 BALLIA BARIYA (NP) Water Supply Reorganization in 31.733 Observation/Apprais 5-2-2024 sent by
prepration
Nagar Panchayat Bairia al (Under Correction) 05.02.2024
Water Supply
Reorganization and
NAWABGANJ House service DPR under prepration DPR under
8 2 BARABANKI Water Supply 185.2 12-2-2024 12.02.2024
_BB (NPP) connection in Nagar (Designing) prepration
Palika Parishad
Nawabganj (Baraba
Construction of 7 MLD
Tertiary Treatment
Sewerage/Sept MoU not Done
BAREILLY (M. Plant & Distribution DPR under
9 2 BAREILLY age 13 (Railway Moradabad 7-2-2024 07.02.2024
Corp) System to supply prepration
Management & Nagar Nigam)
treated waste water,
Dist- Bareilly
Land Issue. (out of 22
BHADOHI NPP
BHADOHI location land is
10 2 BHADOHI Water Supply REORG. W/S 110 Land Issue Meet with DM
(NPP) available for 8 site).
SCHEME
Recheck technical part
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
water supply
reorganization and
PPRBD Under
house connection in
MUGHALSAR Observation/Apprais DPR under
11 2 CHANDAULI Water Supply North zone of NPP Pt. 10.87 5-2-2024 05.02.2024
AI (NPP) al (Returned for prepration
Deen Dayal Upadhaya
Correction)
Nagar , Chandauli
Phase-1
Ramnath Deoria Land not available in Submit DPR in
DEORIA
12 2 DEORIA Water Supply (Deoria NPP) Water 18.2 urban area. Available 7-2-2024 Land Issue one week.
(NPP)
Supply Scheme in rural area Meet with DM
1 OHT Land
identified out of 4 for
ETAH NAGAR
remaining land Meet with DM
PALIKA PARISHAD
regular persuance is DPR under and close the
13 2 ETAH ETAH (NPP) Water Supply REORGANISATION 72.5 5-2-2024
in progress with ULB prepration issue on high
WATER SUPPLY
and District priority
SCHEME
Administration.
Survey completed.
Farrukhabad land identification is Meet with DM
FARRUKHAB FATEHGARH DPR under
14 2 Water Supply Reorganisation Water 121 under progress. 7-2-2024 and close the
AD CANTT. prepration
Supply Scheme Survey completed. issue.
Fatehpur
Reorganization Water
FATEHPUR DPR submitted in
15 2 FATEHPUR Water Supply Supply Scheme Nagar 124.74 5-2-2024 PPRBD -
(NPP) PPRBD on 31.01.2024
Palika Parishad
Fatehpur.
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
NAGAR PALIKA
PARISHAD
SHIKOHABA Project will be covered
16 2 FIROZABAD Water Supply SIKOHABAD WATER 164.5 - Dropped -
D (NPP) under State Sector
SUPPLY SCHEME (A-
2.0)
Meet with DM
and close the
Land issue. Put up
GAUTAM Dankaur issue. Land can
DANKAUR fresh letter to District
17 2 BUDDHA Water Supply Reorganization Water 14.43 Land Issue be procurred
(NP) Administration for the
NAGAR Supply Scheme under Deen
resolution of the issue
Dayal
Upadhya
Meet with DM
and close the
GAUTAM Rabupura issue. Land can
RABUPURA Land issue. NOC of
18 2 BUDDHA Water Supply Reorganization Water 13.85 Land Issue be procurred
(NP) land required
NAGAR Supply Scheme under Deen
Dayal
Upadhya
Meet with DM
and close the
Land issue. Put up
GAUTAM Bilaspur issue. Land can
BILASPUR fresh letter to District
19 2 BUDDHA Water Supply Reorganization Water 10.66 Land Issue be procurred
(NP) Administration for the
NAGAR Supply Scheme under Deen
resolution of the issue
Dayal
Upadhya
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
Meet with DM
and close the
GAUTAM issue. Land can
JAHANGIRPU Jahangirpur Water Land issue. Land for 1
20 2 BUDDHA Water Supply 10.01 Land Issue be procured
R (NP) Supply Scheme Tubewell is pending
NAGAR under Deen
Dayal
Upadhya
GHAZIPUR WATER
SUPPLY PPRBD Under Final will be
GHAZIPUR
21 2 GHAZIPUR Water Supply REORGANISATION 81.85 Observation/Apprais 5-2-2024 PPRBD sent by
(NPP)
SCHEME UNDER al 05.02.2024
AMRUT 2.0
Sewerage/Sept
GORAKHPUR Gorakhpur Sewerage DPR under
22 2 GORAKHPUR age 747.3 under revision 15-2-2024 15.02.2024
(M. Corp) Scheme Zone A-3 prepration
Management
Reorganization of
GORAKHPUR Gorakhpur Water DPR under
23 2 GORAKHPUR Water Supply 118.8 DPR under prepration 5-2-2024 05.02.2024
(M. Corp) Supply Scheme (Phase prepration
- 4) under AMRUT 2.0
Reorganization of Meet with DM
GORAKHPUR Gorakhpur Water Land Issue. Land and close the
24 2 GORAKHPUR Water Supply 103.0 Land Issue
(M. Corp) Supply Scheme (Phase required for intake issue by
- 3) under AMRUT 2.0 07.02.2024
Reorganization of Meet with DM
GORAKHPUR Gorakhpur Water Land Issue. Land and close the
25 2 GORAKHPUR Water Supply 86.4 Land Issue
(M. Corp) Supply Scheme (Phase required for intake issue by
- 2) under AMRUT 2.0 07.02.2024
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
Reorganization of Meet with DM
GORAKHPUR Gorakhpur Water Land Issue. Land and close the
26 2 GORAKHPUR Water Supply 78.8 Land Issue
(M. Corp) Supply Scheme (Phase required for intake issue by
- 1) under AMRUT 2.0 07.02.2024
Land issue. DPR
Prepared / To be
Hamirpur NPP Submitted but Meet with DM
HAMIRPUR
27 2 HAMIRPUR Water Supply Reorganization W/s 69.73 encroachment on the Land Issue to close the
(NPP)
Scheme land, alternate land issue
not avaiable. Explore
alternate land
land identification
Hapur water supply and survey done. DPR DPR under
28 2 HAPUR HAPUR (NPP) Water Supply 15.125 7-2-2024 -
scheme part 2 preparation in prepration
progress
Land issue. land
Hapur water supply identification in Meet with DM
29 2 HAPUR HAPUR (NPP) Water Supply 14.756 Land issue
part 1 progress. Against 11 and expedite
land, 7 identified
Mauranipur
MAURANIPU DPR under
30 2 JHANSI Water Supply Reorganization water 78 DPR under prepration 5-2-2024 05.02.2024
R (NPP) prepration
supply scheme
Extension of Gursaraye To be Dropped. Work
GURSARAI
31 2 JHANSI Water Supply Nagar Palika parishad 7 Done Allready Under - Dropped -
(NPP)
water supply scheme State Sector.
Extention of Garautha
GARAUTHA Under Checking in
32 2 JHANSI Water Supply NP water supply 1.9 5-2-2024 PPRBD 05.02.2024
(NP) PPRBD
scheme
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
Exen to
explore
whether
Sewerage/Sept Gap depletion in
KANPUR (M. DPR under feasibility of
33 2 KANPUR age Sewerage System of 90 DPR under prepration 7-2-2024
Corp) prepration the scheme
Management Sewerage District-I
and submit
finding by
07.02.2024
SIRATHU Sirathu Nagar 100% covered already
34 2 KAUSHAMBI Water Supply 10.48 - Dropped -
(NP) Panchyat (Saturated)
Land issue at Kabrai. Pursue with
Reorganization of
35 2 MAHOBA KABRAI (NP) Water Supply 16.87 0.7 hectare additional Land Issue DM for the
Kabrai W/s Scheme
land required for WTP closure of issue
Construction of 120 Explore the
MATHURA- DPR will be submitted
MLD WTP at Gokul DPR under viability of
36 2 MATHURA VRINDAVAN Water Supply 200.0 only after allocation of 10-2-2024
Barrage in Mathura prepration using yamuna
(M. Corp) Ganga Water
City water also
DPR is dependent on Explore the
MATHURA- Trans Yamuna Water
allocation of Ganga DPR under viability of
37 2 MATHURA VRINDAVAN Water Supply Supply Reorganisation 47.0 10-2-2024
water. No water prepration using yamuna
(M. Corp) Scheme in Mathura
source found water also
Meet with DM
Nagar Palika Parishad Land issue. 4 land along with EO
MAUNATH
Maunath Bhanjan Re- identified, 6 land for resolution
38 2 MAU BHANJAN Water Supply 242.74 Land Issue
Organization Water pending. Resolution of issue
(NPP)
Supply Scheme in 7 days (coverage 44%
only)
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
DAURALA WATER
DAURALA SUPPLY PPRBD (Returned for DPR under
39 2 MEERUT Water Supply 13 5-2-2024 -
(NP) REORGANIZANTION correction) prepration
SCEME
MUZAFFARNAGAR
WATER SUPPLY
Land identified.
MUZAFFARN MUZAFFARN REORGANIZATION DPR under
40 2 Water Supply 111.3 Distribution design 15-2-2024 -
AGAR AGAR (NPP) SCHEME ZONE 1,2,3,4 prepration
under process
& 5 UNDER AMRUR
2.0
MUZAFFARNAGAR
WATER SUPPLY
Land identified.
MUZAFFARN MUZAFFARN REORGANIZATION DPR under
41 2 Water Supply 108.96 Distribution design 15-2-2024 -
AGAR AGAR (NPP) SCHEME ZONE 6,7,8,9 prepration
under process
& 10 UNDER AMRUT
2.0
Explore possibility of
BELA
PRATAPGAR Belha Pratapgarh water ganga water from
42 2 PRATAPGAR Water Supply 140 Feasibility -
H supply scheme prayagraj and share
H (NPP)
with Jaunpur
PRAYAGRAJ water supply project in land noc due for DPR under
43 2 PRAYAGRAJ Water Supply 233.68 5-2-2024 -
(M. Corp) Jhunsi Extended area surface water prepration
Sewerage/Sept
PRAYAGRAJ Water reuse project Nagay ayukt DPR under
44 2 PRAYAGRAJ age 32 5-2-2024 -
(M. Corp) Numayadahi STP signature pending prepration
Management
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
USE OF TREATED
MOU with NTPC
EFFLUENT FROM
Unchahar done, PFR
Sewerage/Sept 18.00 MLD STP IN
RAE BARELI Submitted, concent DPR under
45 2 RAEBARELI age GARDENING / ROAD 46.54 5-2-2024 -
(NPP) from NTPC is still prepration
Management WASHING/TRAIN
awaiting on
WASHING AND FOR
Submitted PFR
NTPC UNCHAHAR.
Reuse of Effluent water
Sewerage/Sept of 40 MLD STP in
SHAHJAHAN SHAHJAHAN Reliance Power has DPR under
46 2 age Shahjahanpur to 70 5-2-2024 -
PUR PUR (NPP) not yet signed MOU prepration
Management Railway Track & Roza
Thermal Power Plant.
Katra Nagar Panchayat Land issue. For OHT.
SHAHJAHAN KATRA_S Reorganization Water Land available in
47 2 Water Supply 27 Land Issue -
PUR (NP) supply scheme (under kasturba gandhi
Amrut 2.0) school
KAIRANA WATER
SUPPLY
KAIRANA Returned from PPRBD DPR under
48 2 SHAMLI Water Supply REORGANIZATION 69.73 5-2-2024 -
(NPP) for correction prepration
SCHEME UNDER
AMRUT 2.0
SIDDHARTHNAGAR
NAGAR
SIDDHARTH SIDDHARTH DPR under
49 2 Water Supply PANCHAYAT 54.5 under checking SE 5-2-2024 -
NAGAR NAGAR (NPP) prepration
WATER SUPPLY
SCHEME
DALA BAZAR DALA BAZAR NP Ultratech, 2000Sq DPR under
50 2 SONBHADRA Water Supply 27.5 5-2-2024 -
(NP) W/S SCHEME meter land required, prepration
AMRUT 2 Pending DPR- Tranche 2 [55]
Estimated
SWAP DPR Expected Instruction in
# District ULB Form Type Project title CAPEX Cost (₹ DPR Status Category
Tranche Date Last meeting
crore)
24X7 water supply
project in Ghasiganj
SULTANPUR DPR under
51 2 SULTANPUR 24X7 ward(SITAKUND) of 4.3 5-2-2024 -
(NPP) prepration
Nagar Palika Parishad
Sultanpur
Trans Varuna Water
Supply Scheme in
Under
VARANASI extended area of Nagar DPR under
52 2 VARANASI Water Supply 124.09 PPRBD/Appraisal 5-2-2024 -
(M. Corp) Nigam Varanasi prepration
(under correction)
(Phase-1 Part A
Dinapur)
Cis Varuna Water
Supply Scheme in
VARANASI extended area of Nagar Land issue. Out of 13
53 2 VARANASI Water Supply 106.22 Land Issue -
(M. Corp) Nigam Varanasi land, 6 are available
(Phase-1 Part A
Lahartara Zone )
Cis Varuna Water
Supply Scheme in
Land issue. Out of 10
VARANASI extended area of Nagar
54 2 VARANASI Water Supply 94.75 land, 3 land are Land Issue -
(M. Corp) Nigam Varanasi
available
(Phase-1 Part B
Chitaipur Zone )
Trans Varuna Water
Supply Scheme in
Land issue. Out of 9
VARANASI extended area of Nagar
55 2 VARANASI Water Supply 66.61 land, 5 land are Land Issue -
(M. Corp) Nigam Varanasi
available
(Phase-1 Part B Lamhi
Zone)