Professional Documents
Culture Documents
QCR W 2015
QCR W 2015
QCR W 2015
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Pressure Containing Butt welds for Radiography
A1 The initial butt weld of each welder is selected for radiographic testing.
For on-shore piping, at least 10% of the each week's production weld
(circumferential girth welds), or as dictated by item A2 above, are
radiographed for the following: a.
Carbonn steel and low alloy steel for general and hydrocarbon service.
(JERES-W-011, Para. 18.6.1.1) b. Fire
water systems ( NOTE: Interpreted to "normal fluid service"). (JERES-W-
JERES-W-011
A4 011, Para. 18.6.1.2) c. Shop fabricated
Para. 18.5.2.1
pipe materials for low temperature service below -18°C. (JERES-W-011,
Para. 18.6.1.3.1) d. Shop fabricated alloy steel
(EXCEPT P4, P5 & P6), stainless steel, and nonferrous materials for all
services except Category D fluids. (JERES-W-011, Para. 18.6.1.4.1)
(NOTE: Shop is an indoor facility approved by
Company Inspector per (JERES-W-011, Para. 18.6.1.3.1)
c. For field and yard welds of all alloy steel materials (P4 and above),
stainless steel, and nonferrous materials for all services except Cat D
JERES-W-011
A5 fluids. (JERES-W-011, Para. 18.6.1.4.1)
Para. 18.5.2.1
d. Hydrocarbon
service at road crossings (carrier pipe only). (JERES-W-011, Para.
18.6.1.6)
e. Piping with severe cyclic
conditions (as defined in B31.3). (JERES-W-011, Para. 18.6.1.7)
f.
Category M fluid service (as defined in B31.3). (JERES-W-011, Para.
18.6.1.8)
Page 1 of 2
QUALITY CONTROL REPORT QCR FORM NUMBER DATE APPROVED QR NUMBER
d. All open
non-pressure vents and drains
(NOTES: a.
Stainless steel in chlorinated sea water is excluded.
b.
Results
For are interpreted
off-shore piping top to "normal
side pipingfluid service".)
(includes all lines over water, over
tidal flats, or within 30 m of the shoreline), 100% of the welds of piping
systems listed below are selected for radiography:
JERES-W-011
A7 a. All services other than category
Para. 18.5.2.2
D fluids
b. Stainless steel in
chlorinated sea water service.
Weld joints completed by the welder each day of recorded on the Daily
A9
weld production Report, QCR-W-2007
REMARKS:
REFERENCE DOCUMENTS:
1. JERES-W-011, Welding Requirements for On-Plot Piping (10'February'2010)
2. ASME B31.3, Process Piping.
Contractor / Third-Party SATORP
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Page 2 of 2