QCR FORM NUMBER DATE APPROVED QR NUMBER

QUALITY CONTROL REPORT


Buttering and / or Weld Build-up QCR-W-2033 WELD-
PROJECT TITLE PACKAGE NUMBER CONTRACTOR / SUBCONTRACTOR

JER PACKAGE # 3, Aromatics Unit 3 SAMSUNG


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

COMPANY USE ONLY


JERITP NUMBER COMPANY ACTIVITY NUMBER WORK PERMIT REQUIRED?

COMPANY INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
A General:
WPSs and PQRs used for repair/build-up/buttering was approved JERES-W-011
A1 by Company Representative. Para. 8.1.1
Welders are qualified in accordance with ASME SEC IX and
JERES-W-011
A2 JEREP-324, for all welding, including tack, temporary, and repair
Para. 9.1
welds.

Welder(s) have been issued Job Clearance Card, and that range
A3 of qualification shown matches the application of WPS being used.
JEREP-324,

Company Representative's approval has been obtained when


buttering or weld build-up exceed the lesser of 1/3 of the base JERES-W-011
A4 metal thickness or 10mm. (NOTE: This requires witnessing by Para. 12.3.5.1
Company representative.- JERES-W-011, Para. 11.3.5.1a)

Buttering or buid-up exceeding the lesser of 1/3 of the base metal


JERES-W-011
A5 thickness or 10mm is/are examined by PT or MT after completion
Para. 12.3.5.1b
of the build-up, but before final welding of the joint.

Page 1 of 2
QCR FORM NUMBER DATE APPROVED QR NUMBER
QUALITY CONTROL REPORT
Buttering and / or Weld Build-up QCR-W-2033 WELD-
PROJECT TITLE PACKAGE NUMBER CONTRACTOR / SUBCONTRACTOR

JER PACKAGE # 3, Aromatics Unit 3 SAMSUNG


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

COMPANY USE ONLY


JERITP NUMBER COMPANY ACTIVITY NUMBER WORK PERMIT REQUIRED?

COMPANY INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
Buttering of joints between disimilar metal joints requires prior
JERES-W-011
A6 approval by Company Representative. Approval is obtained
Para. 12.3.5.2
through the welding procedure review process.

REMARKS:

REFERENCE DOCUMENTS:
1. JERES-W-011, Welding Requirements for On-Plot Piping (10'February'2010)
2. JEREP-324, Certification Review and Registration of Project Welders and Brazers.

Contractor / Third-Party SATORP


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector CQT Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2