Format No: ER 5/10– F2, JOB SAFETY ANALYSIS (JSA), IB THERMAL POWER STATION, OPGC
Serial No. Department Equipment Location Job description:
1 MMDCHP BCN‐ TP‐ ROOF SHEETING AND CLADDING WORK.
JSA performed by: Signature Reviewed & Signature Date of Issue Date of revision Revision No‐
Approved by
01.04.2020 R0
HAZARD TEXT/TYPE ( For reference to identify the Hazard type )
PHYSICAL PHYSICAL PHYSICAL ELECTRICAL CHEMICAL/
EXCAVATION OTHERS
HAZARDS HAZARDS HAZARDS HAZARDS GAS HAZARDS
Flammable/
Shock/
Noise Fall from height Force (Push/Pull) Explosive Collapse/Sliding Fire
Electrocution
substances
Caught in/on or Static Inhalation of Heavy
Radiation Fall (Slip/Trip) Underground live cable damage
between electricity toxic fumes Wind/Rain
Arcflash/ Ingestion/Abso
Confined space Fall down/below Struck by/against ERGONOMICS Dust exposure
blast rption
Exposure to
Fall of Objects Extreme weather BIOLOGICAL Body/Eye
pressurised Poor Posture Oil spill
from height (Hot/Cold) HAZARDS Contact
Steam/Air
Snake/Insect
Contact with Hot Contact with
Poor illumination bite/Virus Spillage Repeatative motion Human factor
surface moving parts
infection
PPEs to be used Hand gloves, Safety Goggles,Dust musk,Safety helmet,Ear plug, welding apron,leather gloves, welding helmet,etc.
Tools required Welding machine, welding rod, grinding machine, gas cutter, hammer, screw driver,spanner,etc.
Important Note‐ While deciding hazard control measures, consider hierarchy of hazard control steps in order of preference.
SAFETY, HEALTH & ENVIROMENT SAFE JOB STEPS / HAZARD CONTROL MEASURES Are control Measures
SEQUENCE OF BASIC STEPS HAZARDS adequate to mitigate
Elimination/ Engineering Administrative PPE the risk (Yes/No)
Substitution
Working on Contact with moving parts N.A ISOLATION OF BCN‐ Electrical isolation and General ppe use YES
MOTOR to be made. LOTO procedure to be
equipment/Conveyor
PTW to be issued. followed.
hand gloves,
Use certified tools and
Safety
Fauilure of Tools/Takels N.A N.A before start work physically YES
Goggles,Dust
verify all tools at site
musk
Scaffolding components to Use Rubber hand
be ensured healthy. Put Red gloves & Safety
colour tag at the time goggle.
N.A YES
scaffolding erection..Certify
Fall hazard the platform before use
from Authorised person
Ensure anchor point of full
Use full body
N.A body harness must be rigid YES
harness.
enough.
Care fully shift the materail. Use Rubber hand
ERRECTION OF SCAFFOLDING Transfer scaffolding gloves & Safety
Struck by/against Tools and components hand to hand goggle.
N.A YES
tackles. or use manila rope. Do not
throw the materilas.
Force (Push/Pull) N.A Use tested & certified tools and hand gloves, YES
before start work physically Safety Goggles,
verify all tools at site Dust musk
ROOF SHEETING AND CLADING
WORK. Cut/Injury N.A Before start work physically hand gloves, YES
verify the hand gloves Safety
Goggles,Dust musk