TECHNICAL REPORT
1 GENERIAL
2 AUTHORITY
3 INTRODUCTION
A TOPOGRAPHIC SURVEY :
(a) Establishment of temporary Bench Marks
(b) Total Station traverse
(c) Leveling
(d) Detailed Survey and rendering
(e) Preparation of Longitudinal section of the river
( f ) Ground verification
C SUB SOIL INVESTIGATION : The sub soil investigations were also carried at
each abutment location and the foundations are
designed for a Safe Bearing Capacity 50 t/m2 .
7 SPECIFICATIONS :
(c) Foundation :
Open foundation : RCC M25 grade
Superintending Engineer
P.W.D. Circle Karauli