POPULATION

SN Subject STAGE I STAGE II STAGE III


1/2/3
1 Coal Portal data UPDATED
2 Unit load coal flow (MW/MT) 490/277 487/300 491/296 489/272 O/H 495/311
3 Generation (MU) 23.138 23.548 11.7 58.386
4 Coal consumption (MT) 14809 15020 7339 37168
5 Sp. Coal (kg/kWh) 0.64 0.638 0.627 0.635
6 SAPC (KWH/MT) 0.9519 1.3863 2.8192 1.7191
7 TH Conv UF > 55% 41.18 59.31 66.02
8 Bunker Conv UF > 55% 36.42 59.30 51.35

9 Fire water pressure 8.5/7.5/4.5/1.0 11/4/4/4 12/8/8/4

9a Sprinkler water pressure 11 10 12


10 Bunker level (m) 2 2 2 2 2 2
11 Coal crushed (MT) 10295 16013 6933 33241
12 Coal bunkered (MT) 9559 15807 6933 32299
13 Coal stacked (MT)/ Zones 736 Z-2 700 Z-3,5 0 Z-2 1436
14 Coal Reclaimed (MT)/ Zones 0 Z-1 494 Z-4 0 Z-5 494
15 Net stack/reclaim (MT) STACKED 942
16 P&I Status OK OK OK
17 MD/MS/SM status OK OK OK
18 DFDS OK OK OK
19 PA system status 11A HEAD & MIDDLE OK 41B H&T,45 T, 44M, S/R CABIN
20 CCTV camera status OK OK 33H,34H,WT1/2,TH SAMPLING POINT,
21 Dragon light OK OK OK
22 Ventilation fan ok OK OK
46A/B MIDDLE TO TAIL, 38T , 39M NEAR
23 Lighting status OK C-26A (TI-28 TO 52)
PA
24 Pump status OK OK OK
25 Coal sampler status JH-5 CSU B N/W OK OK
26 CSSP-Stg 1,2&3 PIT PIT JAMMED OK
27 Compressor temp NA
28 Wagon Tippler NA

FV-12A 03L OIL TOP UP DONE STILL


FORWARD MOTION IS VERY SLOW, ALSO BW 27A SHOWING 200TPH LESS READING C-46A PTW ON HOLD FOR BRKR WORK
AFTER FEW MINUTES LS FEEDBACK IS LOST

C-42A 13 NOS FOR RI MISSING, BELT


TS-2B1 TRIPPING ON O/L ABOVE 700 FEED C-24A WEDLING DAMAGE, HI VIB
RUNNING WITH TOUCHING STRINGER POST

ZLD PUMP AT TP-18 UNDER PERMIT FOR


CR-2B2 HIGH SPEED SEAL OIL LKG
MOTOR REPL WORK

29 Defects :
C-12A GB OIL LKG FROM HI SPEED END BF-03 DECK PLATE DAMAGE

CR-04 SCOOP ACTUATOR GETTING STUCK


DURING OPERATION , LS MALFUNCITON

37B BRAKE BYPASSED SINCE 09.02.24

30 Belt weighers OK OK OK 3
31 Coal yard zone wise OK ,NIL OK ,NIL OK,NIL
Electric Arc Suit: Stage- 1&2 -Total:03(02 -40 cal/cm2, 01-75 cal/cm2) , 2 nos Electric Arc Suit: Total:03(2-40 cal/cm2,
32 Safety (A)
non-contact voltage tester available 8 cal/cm2)

33 Safety (B) OK OK
34 Any Bus Couplers I/S Indiv. Chrg Indiv. Chrg Indiv. Chrg
35 Dozers N/a 8 OK

36 S/R - 1/2/3 OK OK OK

37 Tunnel Seepage NONE NONE OK

38 Belt condition OK OK OK 11

39 VGF/TS OK OK OK
40 PF's Cable OK OK OK
41 TBT / PEP TALK 11 H 37 H 2
42 MAN POWER 41+2+2+8=53 44+2+2+2+6=56 112
43 JSA COMPLIANCE OK OK OK
APC 0.0098 0.0244 0.0226