MAINTENANCE
©Siemens Power Generation 2003. All Rights Reserved
PREVENTIVE
CORRECTIVE MAINTENANCE
MAINTENANCE
ON CONDITION OPERATION
MAINTENANCE MAINTENANCE MAINTENANCE
PROGRAM
*INSPECTIONS and OVERHAULS
*MAINTENANCE LEVELS
Equipment
©Siemens Power Generation 2003. All Rights Reserved
Gas compressor
Date
GT10 Maintenance Program
Power Generation
5
GT10 Maintenance Program
Cx = Stress factor
Cf = Fuel factor
0.5 For operation up to base load
Date
GT10 Maintenance Program
Power Generation
7
©Siemens Power Generation 2003. All Rights Reserved
Date
GT10 Maintenance Program
Power Generation
8
©Siemens Power Generation 2003. All Rights Reserved
Date
GT10 Maintenance Program
Power Generation
9
©Siemens Power Generation 2003. All Rights Reserved
Date
GT10 Maintenance Program
Power Generation
10
©Siemens Power Generation 2003. All Rights Reserved
Date
GT10 Maintenance Program
Power Generation
11
GT10 Maintenance Program
Level A B C D E
Days 2-3 8 16 12 16
©Siemens Power Generation 2003. All Rights Reserved
Damage mechanisms
These elements Can cause
Combustion Pollution
©Siemens Power Generation 2003. All Rights Reserved
Forces Wear
Pressure, rotation, air flow
Cracks (Fatigue, creep)
Temperature
Stationary, alternating
Corrosion
Contaminents
Air borne, fuel Fouling, erosion
Component
©Siemens Power Generation 2003. All Rights Reserved
Diagnosis &
Type of fuel Calculation
recommendation
New CC
Installed
at 20’
©Siemens Power Generation 2003. All Rights Reserved
CC removed
for reconditioning
every 20’
Reconditioned CC
F\gt10\mainpro2\aux\ccrep Installed
at 40’,60’,80’,100’
Down time:
©Siemens Power Generation 2003. All Rights Reserved
Main activities:
- Boroscope inspection of GG and PT
- Check of the auxiliary systems
- Check of the control system
- Test run
Main activities:
- Replacement / reconditioning of CC
- Visual inspection of compressor and hot section
- Check of the auxiliary systems
- Check of the control system
- Visual inspection of gas compressor
- Test run
Level C (40’ h)
Down time:
Approximately 16 working days, 12 h/day
©Siemens Power Generation 2003. All Rights Reserved
Main activities:
- Reconditioning of CC
- Overhaul of gas generator
- Inspection of gear box and couplings
- Check of the auxiliary systems
- Check of the control system
- Inspection of gas compressor
- Check of all alarms and shutdowns
- Test run
Level D (60’ h)
Down time:
Approximately 12 working days, 12 h/day
©Siemens Power Generation 2003. All Rights Reserved
Main activities:
- Reconditioning of CC
- Visual inspection of GG and PT
- Check of the auxiliary systems
- Replacement of GG turbine blades
- Check of the control system
- Visual inspection of gas compressor
- Check of selected alarms and shutdowns
- Test run
Level E (80’ h)
Down time:
Approximately 16 working days, 12 h/day
©Siemens Power Generation 2003. All Rights Reserved
Main activities:
- Overhaul of GG and PT
- Check of the auxiliary systems
- Check of the control system
- Overhaul of the gas compressor
- Check of all alarms and shutdowns
- Test run