Professional Documents
Culture Documents
Screenshot 2023-08-26 at 11.48.55 AM
Screenshot 2023-08-26 at 11.48.55 AM
maintenance TBM
strategy
:
maintenance plant
=
1203
page
5 Enter the maintenance code
.
6 .
Check Plan Date & Call Date . ICall date is 30 days before
plan date 3
7 .
AMP dates can be changed from "iN38" .
.
8 Double click the order and the date and
no .
change
time in "Header" tab .
9 . Click Save .
NOTE :
change of date can be done before crossing of
"Call date" .
PERMIT PTW SFT
A- Permit *
To find functional
taking stages : location :
1 . Initiation ->
IH 1
.
2 Site level approval ->
Enter common plant code
3 .
Issue (Remotely -
5 .
Return
6 .
Cancel (Remotely -
RTAMC)
7 .
Confirmation
8 .
Closing .
* Procedure :
T
-
a
INITIATION : (PTI Initiator) 2G01 General maintenance
1 INS'1 Order
.
<
type 2GO3 AMPs .
2 .
Enter functional location and equipment no . ) It
3 .
Enter maintenance text Start time & End time .
4 .
"Enhancement" tab Select PTW or SFT) Select Isolation require -
5 .
Enter last 4 field
6 .
Click "Release" "
-
Click "Save" INITIATED
321)
->
7 IN rder no.
pre-entered <
Status
8 .
Repeat steps 4 and 5 Click Save .
triggered .
no .
I
-
SITE LEVEL APPROVAL : (Approver Log in)
1 .
Inbox > Workflow > Click permit Workflow
* 2 .
Scroll till bottom) Select RTAMC) Enter Remarks -
Approved
3 .
Click Approve .
APPROVED
->
Status
* # RTAMC "issue"
.
has to the permit
.
1 Inbox) Workflow Y Select permit Workflow
2 .
Scroll I Click Yes button beside "Receive" .
1 .
IN38< Select date
range) Check permit type
Ongoing
2 .
Enter maintenance plant [12033
3 .
Find permitY Double click rder No .
4 .
"Enhancement" tab Work done - YES Restriction -
NIL
Details of confirmation -
NA
CANCELLED
5 Click "Initiate Return" button
-
Status
. .
* RTAMC Will
6 .
has to cancel .
take 1-2
days .
#
-
- CONFIRMATION : (Any login at SS level)
1 .
IN41 < Enter Order No & < Enter personal no
3 Save
.
.
-> CNF
Status ↑ P
.
2 Enter actual dates and time .
3 .
Click "Complete Technicaly" OR [CFUL+-F123
4 .
Popup appears : AMP Done ,
Test Results , DCRM On . Click
&
6
Again 132
page will come .
Press
7
.
Status
CALLING 2903 PERMITS
1 .
Tcode-2pm-preventive
Maintenance Plant Plan dati "From" and "To"
2 . Enter
Planning Plant , , of
that Financial Year .
Execute
3 . Find equipmentthe
of concur and not the "Maintenance Plan" no
5 .
Select the latest plan date and click "Fixcall" at bottom menu .
7 .
Save *
00 Wait
for 5 minutes and open Tcode-iW38 .
9 .
Find the
permit of the particular Amp and double click the order no .
⑧
A nor is there
If any the permit ,
Continue #
point from Pamit
procedure .
while
saving 3-4
times .
L
Enter save
press automatically
It will
*
For
closing sub
permits of 2403 permis :
.
4 * DO NOT Enhancement tab Realease & Save
go to .
6 .
Closing to be done
by Station I/C .
CLOSING OF PERMIT WO WORK DONE
I 2 "Plant"
. .
Select instead of RTAMC .
# .
Work flow will move
Incharge
to Station .
Put all
necessary info (NBFC/RLDC code can be kept "0"(
All other info can be kept YES/NA .
2 .
Click Issue
3 .
Continue Step # .
# . CANCELLATION :
1 .
Work flow will move to Station
Incharge after E 5 . .
2 .
Go to Inbox Workflow > Cancel permit) Double click
-
.
.
3 Enter all YES
4 .
Click Cancel
#. 2 If actual times
already there then
something
.
Do it
Wrong .
again .
CONSUMPTION IN PERMIT
E to be done before cancelling of permit]
[N38 Open the permit Check whether "Received"
.
2 Take material code of the item to be consumed from
mb52 and 1011
storage location .
(Item should be
Enter Batch
3 .
4 .
Click General Data (Note down Reservation No . ) .
migo Issue
Template
*
Terminology Points
Measuring
A Measuring Point is a numeric code for each kind of
value to be measured for each equipment .
PROCEDURE 8
1 .
The measuring points are required to be downloaded from IH01 .
.
2 Download the template in which is accepted by SAP
to
upload test result values ·
in
.
3 Copy the
measuring points template .
.
4 Enter the measured values and other details .
6 .
* MEASURING POINTS
1 .
in 1 suz-udptc
.
2 Select Equipment Double click
3 .
More > Environment Export
2pm ik11-
Click "Download Template"·
->
Enter
Measuring Points ,
Date and measured values ·
) Save .
->
2pm ik 11
-
uploading results .
iK 12 Measuring point
of Test Results
m
Take respective
1 .
2 .
IK22
Measuring Document (Entel
Measuring pr &
Check the current value
3 .
Double Click the
measuring doc no .
in IH12
page .
4 Reversal Indicator
.
Go to More
Measuring Doc Functions Set
Click "Set"
5 .
[K22
Measuring Document L Enter
Measuring pt &
Check whether current value deleted .
6 .
Make new
file with corrected values and upload .
ERIP
NOTIFICATION
① Zi creation in SAP 3
pre requisites s
a normalization data
) Tripping Time
3) z0 from SAP
be created
20
contage notification No .) + will
by RTAMe
cul
- 24M -
Report -> Select Trip Report & &
- Select Outage -
->
2T creation in SAPS
page---will open ,
select type : It
↳ Enter
Coding , Subject ,
Start/End Details ,
Han->
Object Part ,
H
Damage ,
Cause , Check Breakdown .
⑧ outage - Enter to no
-,
Scheme ,
In Service ,
CB details .
->
upload Doc .
->
will be
Doc no
displayed .
6 .
Closing 27 : IW22
Enter IT no
IT is closed