Doc No: 01A SUBJECT : Installation ductable units with PI ducts for MC8 Drier 27/10/2023
Cabins
Rev 00
PROJECT : MC8 DRIER CABINS
Task (Steps) Potential Hazard Who might be Existing Control Responsible Current Risk Additional Control Responsible Final Risk
affected person Con Prob Risk person Cons Prob `
Demonstrate
competency in
performing the task
safely.
✓ Scaffolding inspection to
beconducted. ✓ Monthly inspection of
✓ Scaffolding tag system ladders to be conducted.
to be followed.
✓ Scaffolding should be
inspected by certified person.
✓ Tool box talk Training to
workers prior to start work
about ladder use.
✓ Ladder must be
installed on firm & level footing.
✓ Leveling device to be used
if required.
✓ Straight ladder to be tied
on top,
✓ Do not use the top two steps.
✓ During working on
ladder one person should
hold the ladder
✓ Always face the ladder and
hold on with both hands
When climbing up or down.
Monthly inspection of ladders to
be conducted,