This document is a drawing that was modified by Lycopodium as part of their current scope of work. Lycopodium accepts no responsibility for the accuracy of any information on the pre-existing drawing, except for aspects that were modified by Lycopodium according to their scope of work. The drawing is related to a 5MTPA expansion project for a mine in Indonesia and shows a process flow diagram.
This document is a drawing that was modified by Lycopodium as part of their current scope of work. Lycopodium accepts no responsibility for the accuracy of any information on the pre-existing drawing, except for aspects that were modified by Lycopodium according to their scope of work. The drawing is related to a 5MTPA expansion project for a mine in Indonesia and shows a process flow diagram.
This document is a drawing that was modified by Lycopodium as part of their current scope of work. Lycopodium accepts no responsibility for the accuracy of any information on the pre-existing drawing, except for aspects that were modified by Lycopodium according to their scope of work. The drawing is related to a 5MTPA expansion project for a mine in Indonesia and shows a process flow diagram.
Lycopodium has modified this pre-existing drawing, produced by others, as part
of the current scope of work, Lycopodium accepts no responsibility
for the validity or accuracy of any information on this pre-existing drawing, other than those aspects which have been modified by Lycopodium in accordance with the current scope of work.
PT TAMBANG TONDANO NUSAJAYA
SCALE CHECKED DESIGN ENG. LEAD ENG. DESIGN APP'D PROJ. APP'D CLIENT APP'D 4 02.10.23 RE-ISSUED FOR DESIGN ( 5 MTPA UPGRADE ) GGT MSM TOKA TINDUNG 5MTPA EXPANSION PROJECT DRAWING TITLE 3 11AUG17 RE-ISSUED FOR DESIGN JD MG MG SM MS CB 2 07JUL17 ISSUED FOR DESIGN AD MG MG SM MS CB 5Mtpa EXPANSION PROJECT 1B 05JUN17 UPDATED WITH COMMENTS JR MG MG SM MS CB PROCESS PLANT 1A 10.05.17 ISSUED FOR CLIENT REVIEW CB MG MG SM MS CB Lycopodium Minerals Pty Ltd ABN: 34 055 880 209 Level 5, 1 Adelaide Terrace, East Perth, Western Australia 6004 PROCESS FLOW DIAGRAM 1 28.12.09 TOKA AND KOBA RAW WATER ADDED NG PMA DB T: +61(0) 8 6210 5222 www.lycopodium.com.au SCALE : JOB No. DRG No. REV. NTS XX XXX 0 21.02.07 ISSUED FOR CONSTRUCTION JK GS BWB This drawing and its contents are confidential, are subject to return on demand and may DRG No REFERENCE DRAWINGS REV. DATE DESCRIPTION DRN CHK'D DESIGN ENG. LEAD ENG. DESIGN PROJ. APP'D APP'D CLIEN APP'D not be copied or disclosed to any third party or used directly or indirectly for any other purpose than as determined in writing by Lycopodium Minerals Pty Ltd. CB 02MAY17 1981 DWG-00-BF-1001 4