Tanggal KODE MATERIAL MATERIAL TARGET SHIFT 1 SHIFT 2 TOTAL SELISIH

1-Apr-23 2960 Swing arm 1400 650 700 1350 50 KODE MATERIAL
1-Apr-23 3267 Wheel Rim 1150 900 300 1200 -50 3021 Steering handle
1-Apr-23 3021 Steering handle 900 650 250 900 0 2960 Swing arm
1-Apr-23 3022 Front Frame 1750 900 810 1710 40 3022 Front Frame
1-Apr-23 3492 Sub Frame 275 150 125 275 0 2833 Main Stand
2-Apr-23 3492 Sub Frame 2330 1160 1170 2330 0 3267 Wheel Rim
2-Apr-23 2833 Main Stand 770 400 350 750 20 3492 Sub Frame
2-Apr-23 3022 Front Frame 1200 600 600 1200 0
2-Apr-23 3021 Steering handle 1100 600 550 1150 -50
2-Apr-23 2960 Swing arm 900 500 400 900 0
2-Apr-23 3267 Wheel Rim 850 400 450 850 0
3-Apr-23 3022 Front Frame 2100 1100 1000 2100 0
3-Apr-23 3492 Sub Frame 300 150 150 300 0
3-Apr-23 2833 Main Stand 1500 700 800 1500 0
3-Apr-23 3021 Steering handle 500 350 130 480 20
3-Apr-23 3267 Wheel Rim 500 200 300 500 0
3-Apr-23 2960 Swing arm 800 400 400 800 0

Tanggal - all -
SOAL
1. Isi nama material MATERIAL Sum of TOTAL
2. Hitung total produksi per material per hari Front Frame 5010
3. Hitung selisih produksi Main Stand 2250
4. Hitung jumlah produksi setiap material selama 3 hari Steering handle 2530