JOB HAZARD ANALYSIS WORKSHEET

Project Name : Metrojet New Hangar Improvement Works Conducted by: JHA No: 2021-001

Job Location & Details: Apron Backfilling and Side Wall Make
Date Prepared: 06 sure
this is
Dec 2021
Approved by:
signed by the one
JSA Participants: Site Engineer, Foreman, Works Personnel Who conducted the analysis? Why this is blank? who prepare and
Mark Langbein
approved on your
Responsible Supervisor: Site Engineer Date: 06 Dec 2021
part
PPE Required Hard Hat Safety Boots High vis clothing Gloves Safety Glasses
Hearing Protection Safety Harness Face Shield Dust Mask Long Sleeve/Trouser
Cotton Clothing

Dont forget to
1. Hazard Identification You will be working 2. Risk Evaluation 3. Risk Control
1a. 1b. 1c. 1d. 2a. 2b. 2c. 2d. require
3a. them to 3b.
with Equipments so
No Possible Accident / Ill Existing Risk Control wear Risk
Additional a Safety Action Officer,
.
Work Activity Hazard
Health & Persons-at-Risk please check the
(if any)
Severity Likelihood Risk Level
Control
Designation
Glass for this (Follow-up
one date)
1 Transport workers, Traffic accident Fatality/ body injury Proper
VehiclePPE
driven by personnel with Major Rare Moderate (4) Supervisor to ensure Engineer or Supervisor
as Eye Hazard is
equipment and materials to Required only;
valid license compliance
site & vice versa No speeding & observe traffic very High on this
rules & regulations;
Regular maintenance of vehicles activity
Workers fall off back of Fatality/ body injury Do not exceed number of Major Rare Moderate (4) Workers do not sit on Engineer or Supervisor
trucks passenger allowed; loads higher than
Barrier to prevent fall; barrier of trucks
Proper space for worker to sit
Material fall off trucks Injury to other motorist Secure materials; Moderate Rare Moderate (4) Do not load materials Engineer or Supervisor
No overloading. higher than barrier on
trucks unless
properly secured
2 Movement of trucks Personnel/ structure hit by Physical injury/ fatality/ Vehicles operated by licensed Major Rare Moderate (4) Supervisor to enforce Engineer or Supervisor
vehicles property damage driver; Reverse alarm installed on on speed limit;
heavy vehicles; No speeding Deploy traffic
marshal to guide
driver of heavy
Risk Assessment Matrix Consequences
Likelihood Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Almost Certain (5) Moderate (5) High (10) High (15) Catastrophic (20) Catastrophic (25)
Likely (4) Moderate (4) Moderate (8) High (12) Catastrophic (16) Catastrophic (20)
Possible (3) Low (3) Moderate (6) Moderate (9) High (12) High (15)
Unlikely (2) Low (2) Moderate (4) Moderate (6) Moderate (8) High (10)
Rare (1) Low (1) Low (2) Moderate (4) Moderate (4) Moderate (5)
For all the equipments Conduct an
to be use please make What about the
equipment
JOB HAZARD ANALYSIS WORKSHEET
sure that there will be a
Spotter/Flagman to inspection prior to respiratory
assist the equipment in start of the activity protection?
moving to avoid any to prevent any Asphyxiation
injury and property accidents
damage vehicles when
reversing
3 Operation of dumper Topple of dumper Serious injury or death to Approved and trained operator to Major Rare Moderate (4) Supervisor to ensure Engineer or Supervisor
workers operate; No speeding compliance
Brake lost Serious injury or death to Approved and trained operator to Major Rare Moderate (4) Supervisor to check Engineer or Supervisor
workers and properties operate; Ensure dumper and ensure
maintained regularly compliance
Knocking into workers Serious injury or death to Approved and trained operator to Major Rare Moderate (4) Supervisor to ensure Engineer or Supervisor
workers operate; Impose speed limit compliance
Extreme hot weather in Heat exhaustion/ Workers to drink more water; Moderate Rare Moderate (4) To be monitored Engineer or Supervisor
outdoor condition dehydration Interval break
4 Movement of heavy Personnel/ structure hit by Physical injury/ fatality/ Vehicles operated by licensed Major Rare Moderate (4) Supervisor to enforce Engineer or Supervisor
vehicles vehicles property damage driver; Reverse alarm installed on on speed limit;
heavy vehicles; No speeding Deploy marshal to
Ergonomics guide driver of heavy
Hazard vehicles when
reversing
5 Mixing mortar The with
Contact riskmortar
for
using Dermatitis / Irritation to skin Wear safety rubber gloves, Moderate Rare Moderate (4) Refer to MSDS and Engineer or Supervisor
and eye infection goggles, rubber safety boots and implement control
the hand tools? protective clothing measures accordingly
Tripping & falling Strain ankle / minor bruises Workers are to wear safety boots Minor Rare Low (2) To be monitored Engineer or Supervisor
with adequate grip; Maintain
good housekeeping at work areas
Orient people om
Bad weather/ lightning Strike by lightning Stop work during bad weather Major the
Rare proper way(4)of Supervisor to ensure
Moderate Engineer or Supervisor
compliance
6 Soil loosening using hand Extreme hot weather in Heat exhaustion/ Workers to drink more water; Moderate lifting
Rare toModerate
prevent (4) To be monitored Engineer or Supervisor
tools outdoor condition dehydration Regular breaks for workers any injuries
Bad weather/ lightning Strike by lightning Stop work during bad weather Major Rare Moderate (4) Supervisor to ensure Engineer or Supervisor
compliance
Prolonged repetitive digging Backache/ muscle ache Workers given regular breaks Moderate Rare Moderate (4) To be monitored Engineer or Supervisor
action
7 Installation of metal wire Heavy Load Back injuries, pains At least 2 person to carry heavy Major Rare Moderate (4) SWP for manual Engineer or Supervisor
mesh and metal bars load; Use of mechanical means or handling
transportation if reasonably
practicable
Sharp edges Cuts on hand and other body Wear hand gloves, overall and Minor Rare Low (2) To be monitored Engineer or Supervisor
parts safety boots

Prepared By: __???? Reviewed by: ______?? Approved By: _________??

Additional Comment: Risk Assessment Matrix Consequences Take note: MEC will be the
-Include installation of signages and Likelihood Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5) one to approve the JHA.
Almost Certain (5) Moderate (5) High (10) High (15) Catastrophic (20) Catastrophic (25)
barriers at the work location Likely (4) Moderate (4) Moderate (8) High (12) Catastrophic (16) Catastrophic (20)
This has to be approved
-Conduct a safety meeting prior to start Possible (3) Low (3) Moderate (6) Moderate (9) High (12) High (15) first prior to start the work
Unlikely (2) Low (2) Moderate (4) Moderate (6) Moderate (8) High (10) activity
the activty Rare (1) Low (1) Low (2) Moderate (4) Moderate (4) Moderate (5)
-Check the proper PPE Required based