Description

SEPTICK TANKER
EXCAVATION
SITE CLEARANCE
1 1 5.5 2.5*4
7 38.50 M2 AREA
BULK EXCAVATION
0-1.5
1 1 3.65
5.15
1.5 28.20 M3
1.5-3
1 1 3.65
5.15
1.15 21.62 M3
BACK FILLING
TOTAL EXCAVATION-SEPTICK TANKER VOLUME
49.81 TOTAL EXCAVATION
-1 1 3 SEPTICK TANKER VOLUME
4.5
2.65 -35.775
14.04 M3 BACK FILLING
CONCRETE WORK
1 2 3 SLAB ( TOP AND BOTTOM)
1.5
0.1 0.9 M3
MASONARY WORK
1 2 4
0.75
2.5 15 M3
1 2 0.5
0.75
2.5 1.875 M3
16.875 M3 MASONARY WORK
EXTERNAL AND INTERNAL MASONARY PLASTERING WORK
1 1 13
2.5 32.5 M2
1 1 9
2.5 22.5 M2
55 M2 AREA FOR PLASTERING WORK
WATER PROOFING WORK
55 M2 AREA DITTO AS PLASTERING WORK
DOUBLE LAYER BRICK WORK FOR INTERNAL PARTITION
1 2 1.5
1.9 5.7 M2 BRICK WORK
Qun. Bar Length No. of Total Length of Reinforc
Structural Member
(pcs) Dia. (m) Memb. 6mm
sub structure
footing column
SLAB BOTTOM
16 8 1.5 1
9 8 31
TOP SLAB 16 10 1.5 1
TOP SLAB 16 10 31

Total length -
Wt/m 0.22
Total wt -
6mm
Total Length of Reinforcement Bar (m)
8mm 10mm 12mm 14mm 16mm 20mm 24mm 32mm

24.00

24.00
48.00
24.00 72.00 - - - - - -
0.39 0.61 0.88 1.20 1.56 2.44 3.52 6.26
9.39 44.00 - - - - - -
8mm 10mm 12mm 14mm 16mm 20mm 24mm 32mm

You might also like