q36220 00 000 Umgc 4500008005 Qa g120 00002 Itp Structural Concrete and Grouting
q36220 00 000 Umgc 4500008005 Qa g120 00002 Itp Structural Concrete and Grouting
07/27/23 C.
RAH R.
BAR
Date Description - Revision Subject Prepared by Checked by Approved by Cont Rev JESA Rev
REQUISITION REFERENCE :
UMGC-4500008005-QA-G120-
00002
JESA Document Number
JESA
JESA S.A, Shore 27, Casa Nearshore, 1100 Boulevard Al Qods, Casablanca Tel:
+212(0)522 87 70 00 Fax: +212(0)522 87 72 50
Q36220-00-000-UMGC-4500008005-QA-G120-00002
Email: info@jesagroup.com
N/A
HELP JESA DOCUMENT NUMBERING SYSTEM Project Num Sub Project Area Code Sender Code P.O Number Discipline Code Doc Type Sequence JESA Rev
Please Refer to Annex Q, L &
DC Procedure . Shall you need
Example (Trigram is unique to each contractor) Q36220 00 000 UMGC 4500008005 QA G120 00002 0
UMGC INSPECTION AND TEST PLAN Q36220
Material Certificates,
7 Anchor bolts certificates check Laboratory Test Reports, W W
MRM, RIR.
H DR
13 Grouting (IFC drw. General notes for concrete works) Grout Inspection Reports W W
H
compliance to standard
15 Grout Materials Testing W W
Review Report H
16 Grout Placement (IFC drw. General notes for Grouting works) Visual inspection Report W W
H
17 Grout Curing (IFC drw. General notes for Grouting works) Visual inspection Report W H W
compliance to standard
18 Grout Void Testing W W
Review Report H
19 Complete Installation checklist Grouting Log (IFC drw. General notes for Grouting works) Approval checklist W W
H
20 Concrete Masonry Materials Testing (IFC drw. General notes for concrete works) compliance to standard W W
H
22 Concrete Masonry Testing (IFC drw. General notes for concrete works) compliance to standard W W
AFTER INSTALLATION
From Work Inspection
1 Removal of form work. W S
Report
Repair work
3 MOS Quality Document W S
For small holes 20x20mm filled with mortar
DRAW INGS
5 Finishing inspection Final Inspection Repot W W
S
Site Work Instruction
6 Structure Release for Installation Works Site W orkInstruction Release inspection report / H H
Punch List
Surveillance (S):
Observing or monitoring the work, inspection or test, random attendance at site, no signature required on the Inspection Request (ITN) or its accompanying documentation.
Caractéristiques à contrôler
Moyen ou
Reprise
N° Caractéristiques à controler Tolérance outil de C NC Observation
NC
Contrôle
Contrôle visuel
La verticalité, l'horizontalité et le
3
positionnement sont-ils corrects
TOTAL
Visa du responsable des travaux : Visa du responsable Qualité Visa maitre d'ouvrage délégué
Systéme de management de la Qualité E508C
Caractéristiques à contrôler
Moyen ou
Caractéristiques à Reprise
N° Tolérance outil de C NC Observation
controler NC
Contrôle
Qualité du coffrage
le coffrage et sa mise en
1 œuvre sont-ils adaptés au
type du parement ?
Contrôle de la mise en
œuvre:
2 Propre
3 Plan
4 Etanche
5 Rigide
Caractéristiques à contrôler
Moyen ou
Caractéristiques à Reprise
N° Tolérance outil de C NC Observation
controler NC
Contrôle
la température du béton
3 frais est-elle conforme au
contrat ?
TOTAL
Visa du responsable des travaux : Visa du responsable Qualité Visa maitre d'ouvrage délégué
Systéme de management de la Qualité E515C
Caractéristiques à contrôler
Moyen ou
N° Caractéristiques à controler Tolérance outil de C NC Reprise NC Observation
Contrôle
TOTAL
Visa du responsable des travaux : Visa du responsable Qualité Visa maitre d'ouvrage délégué