ITP-MEP-006 Dismantling of MEP
ITP-MEP-006 Dismantling of MEP
Project Name: NAKHEEL MALL EAST WING REFURBISHMENT, DUBAI, UAE Project No.: UPR377 Ref. No.: UPR377-ITP-MEP-006 Rev No.: 00
Risk Assessment Method Statement Elec. Spec Section No, Materials submittal, Relative construction standards and local RAMS and ITP RAMS and ITP document Submittal
2 Every 3 months H W/R A
(RAMS) & Inspection & Test Plan(ITP) method Statement authorities codes document Submittal Approval
Elec. Spec Section No., IFC drawings, design Condiition survey report Inspection
3 Site validation report As built and design drawings Site survey Once H R A
drawings Request (IR) Approval
4 Isolation Elec. Spec Section No,/RAMS/Permits Visual Inspection Material Submittal Once Material Submittal Approval H R R A
Strip out electrical supports and Elec. Spec Section No, Materials submittal,
6 Approved shop drawing and RAMS Site Inspection Once Inspection Request (IR) Approval H R A
containment method Statement
Strip out Cables and wires pulling, and Elec. Spec Section No, Materials submittal,
7 Approved shop drawing and RAMS Site Inspection Once Inspection Request (IR) Approval R R A
final fixtures method Statement, Shop Drawings
Handover Documents Specification - Section- Closeout/Handover- Transmittal Approval/Signed copy As per Project Closeout/Handover
9 Visual Inspection Transmittal Once H R R A
SECTION through email Requirements
FORM REF: HSQE-ITP-XX1 AUTHORISED BY: Head of HSQE | DEPARTMENT: HSQE | DATE OF ISSUE: February 2019 | ISSUE NUMBER: 02 PAGE NUMBER 1 of 1