Paae 1 of 2: 050426-0000-DAOO-FRM-0001 Rev A
Paae 1 of 2: 050426-0000-DAOO-FRM-0001 Rev A
50489-530-450- Procedure for Fabrication, Erection, and Testi ng of field Erected storage
PR0-2105 Tanks
Return Code 8 Comments.
1) WPS shall be submitted together with weld map
2) Details of back welding run and its welding parameters shall be indicated.
3) During tank fabrication and erection all field activities shall adhere to KOC's
fire and safety regulations and its health, safety and environment policies.
4) Primers applied principally to protect plate's surface and shall be locally
removed by grinding or brushing prior to the welding of attachments etc.
5) The shell to bottom plate weld shall be wet magnetic particle inspected on
the inside and outside, after the first pass each side and after hydro test on
the completed welds prior to lining.
6) When nozzle neck are fabricated from welded plate, the longitudinal weld
shall be 100% radiographed .
7) Typing error in EDDITION in clause 5.12 is to be corrected .
8) Most of the attachment pages are not legible.
I ~:~:ived:
EF1902/GC30/LNT- Date
Transmittal No.: 02-J ul-15 I 05-Jul-15
KOC/D-1856 I Issued:
50489-530-450- Procedure for Post Weld heat treatment for storage tanks
PR0-2106 Comments.
Return Code 8 1) In accordance with clause 10.10.2 of the company standard KOC-MV-
007 clean out door and other assembly requiring stress relief shall be
furnace heat treated as per API 650.
Approved by:
M-L!\y fe:---l ? Z-1.( r· ~Wlv
1.)
·/~
;;·. . . ., \. KUWAIT OIL COMPANY (K.S.C.)
A Subs idiary of Kuwait Petroleum Corporation
Page No:
0 t 07 j
1
of
2015
13
I S
I L..rsen & Toubro
~' . /#"' ae : - une-
~ a .. to«"
- -:-~
Heavy Engineering Industries and Shipbuilding Co.K.S.C.(Public)
I I
P.O Box 10155,
Shuaiba 65452,
Kuwait
HEISCO
/
/
A Issued for Review/Comments PM .L ):.:t: QCM joM 07-June-2015
\
~~-