B2017505
Address of the Client Tangenziale Sud – Fraz. San Grato – 26900 Lodi (LO)
Tested samples/items Three-phase metal-clad switchgear, Ring Main Units for medium voltage, composed by
No. 3 sections, one circuit breaker and two disconnectors
The results reported in this document relate only to the tested samples/items.
Partial reproduction of this document is permitted only with the written permission from CESI.
Prepared
Prepared PPR
TCE –- Levati Mario
M. Levati
B2017505 2961 AUT
Verified
Verified Alunni Roberta,
TCE – R. Alunni PPR - Garolfi Dario
B2017505 3083 VER B2017505 1800809 VER
Approved
Approved PMI
TCE -–The Manager
L. Arcidiaco
B2017505 821814 APP
- Arcidiaco Lorenzo
D1000IG rev.06
CESI Via R. Rubattino 54 Capitale sociale 8 550 000 Euro Registro Imprese di Milano
Centro Elettrotecnico 20134 Milano - Italia interamente versato Sezione Ordinaria
Sperimentale Italiano Telefono +39 022125.1 Codice fiscale e numero N. R.E.A. 429222
Giacinto Motta spa Fax +39 0221255440 iscrizione CCIAA 00793580150 P.I. IT00793580150
http://www.cesi.it
CESI
B2017505
Tests witnessed by
Mr. Roberto Magnani SAREL S.r.l.
Test evaluation
With reference to the Standards/Specifications listed in the first page and the characteristics of the tested sample assigned by
manufacturer, the carried out tests passed SUCCESSFULLY.
Only for laboratory requirement, in order to reproduce the test conditions, all the laboratory data are contained in the
document marked: —
The measurement uncertainties of the main test results reported in the document comply with the following limits:
• voltage: ± 3,3 % (document A9029227)
• current: ± 2,6 % (document A8014653)
• time: ± 1,8 % (document A9030624)
The measurement uncertainties are estimated at the level of twice the standard deviation corresponding, in the case of normal
distribution, to a confidence level of about 95 %.
Laboratory information
Receipt date of the sample March 27, 2012
D1269IG
CESI
B2017505
D1205IG
rev.01
CESI
B2017505
Test arrangement
The test arrangement (choice of the functional units, their number, equipment, position in the room and place of the initiation of
the arc) was indicated by the client.
The complete board was placed in the hall in observance of the dimensions of the actual installation in service.
The room was represented by the floor, the ceiling and two perpendicular walls, as shown in the following figures:
i : Position of indicators
A : 200 cm
B : 50 cm
C : 30 cm
D : 10 cm
E : 196 cm
F : 216 cm
G : 10 cm
The indicators for observing the thermal effects of the gases were fitted vertically, placed up to a height of 2 m and at distance of
30 cm from the metal enclosure.
Other indicators were placed horizontally at a height of 2 m above the floor and between 30 cm and 80 cm from the enclosure.
The indicators used during the tests consisted of pieces of black cretonne (150 g/m2), fitted in frames of steel sheet having
dimensions 150 mm × 150 mm.
D1205IG
rev.01
D1232IG
B2017505
Test Report CESI Approved Page 5
CESI
B2017505
D1110IG
D1107IG rev.02
Condition of the apparatus after the tests: see assessment of the test on page 9
The pressure was measured on the lower part of the lateral and rear corner in the left side
TEST PASSED
B2017505
Test Report CESI Approved Page 7
D1107IG rev.02
Condition of the apparatus after the tests: see assessment of the test on page 9
The pressure was measured on the lower part of the lateral and rear corner in the left side
Note 1: Current involve the phase T for the last 20 ms due to the main compartment was with-out SF6.
TEST PASSED
B2017505
Test Report CESI Approved Page 8
CESI
B2017505
Test Criterion
(Fulfilled - See note No. - Not applicable)
No. No.1 No.2 No.3 No.4 No.5
1 Fullfield Fullfield Fullfield Fullfield Fullfield
2 Fullfield Fullfield Fullfield Fullfield Fullfield
The following criteria listed in the mentioned Standard have been allowed for the assessment of arcing effects:
Criterion No.1
Correctly secured doors and covers do not open. Deformations are accepted, provided that no part comes as far as the
position of the indicators or the walls (whichever is the closest) on every side. The switchgear and controlgear do not
need to comply with its IP code after the test.
To extend the acceptance criterion to an installation mounted closer to the wall than tested, two additional conditions
shall be met:
- the permanent deformation is less than the intended distance to the wall;
- exhausting gases are not directed to the wall.
Criterion No.2
No fragmentation of the enclosure occurs.
No ejection of fragments or of other parts of the switchgear of an individual mass of 60 g or more occur
Objects of an individual mass of 60 g or more falling to the floor in the immediate vicinity of the switchgear are
accepted (in the case of accessible sides, this means between the switchgear and the indicator rack).
Criterion No.3
Arcing does not cause holes by burning through in the classified sides up to a height of 2000 mm.
Note: Holes in the enclosure which are created after the duration of test by other effects than burning through, are disregarded.
Criterion No.4
Indicators do not ignite due to the effect of hot gases or burning liquids.
If indicators have been ignited, the assessment criterion may be regarded as having been met, if proof is established of
the fact that the ignition was caused by glowing particles rather than hot gases. Pictures taken by high-speed cameras,
video or any other suitable means can be used by the test laboratory to establish evidence.
Indicators ignited as a result of paint or stickers burning are also excluded.
Criterion No.5
The enclosure remains connected to its earthing point. Visual inspection is generally sufficient to assess compliance.
In case of doubt, the continuity of the earthing connection shall be checked (refer to 6.6, point b)).
Notes :
D1243IG
rev.01
CESI
B2017505
Photo no. 1
M2009IG
CESI
B2017505
Photo no. 2
Internal view of the main compartment
before test no.1
Photo no. 3
Initiation arc point for main compartment
before test no.1
M2009IG
CESI
B2017505
Photo no. 4
Front view
before test no.1
Photo no. 5
Lateral side
before test no.1
M2009IG
CESI
B2017505
Photo no. 6
Front view
after test no.1
Photo no. 7
lateral view
after test no.1
M2009IG
CESI
B2017505
Photo no. 8
lateral view
after test no.1
M2009IG
CESI
B2017505
Photo no. 9
Initiation arc point on the cable compartment
before test no.2
Photo no. 10
Front view
Before test n.2
M2009IG
CESI
B2017505
Photo no. 11
Lateral view
before test no.2
Photo no. 12
front view
after test no.2
M2009IG
CESI
B2017505
Photo no. 13
Lateral view
after test no.2
M2009IG
CESI
B2017505
Symbols used in this diagram are the same as those on the oscillograms.
D0010IG
CESI
B2017505
Symbols used in this diagram are the same as those on the oscillograms.
D0084IG
CESI
B2017505
Frequency Hz
X-14-1 mΩ
X-14-2 Ω
TA 14-1 ratio K
Supply
Ref. No. 1 to 6
Ratio K 130+130 / 30+10
Connection Type YY/dd
Transformers
No.
Circuit
Transformers K
Neutral condition T–I
R (resistance) Ω
Connection / Neutral S-D / T-I
X (reactance) Ω
Load
Current kA
Results
Uc kV
t3 µs
td µs
D1094IG
rev.01
CESI
B2017505
Ir B1 5000 B4 S4 4
Is B2 5000 B5 S5 5
It B3 5000 B6 S6 6
Additional instrumentation:
D1095IG
rev.01
CESI
B2017505
Laboratory P140
Measuring system characteristics (1st)
Pos.
Ref. Type CESI No.
or K
D1 Capacitive divider DC(220)1-Ur 4233,1 4924
D2 Capacitive divider DC(220)1-Us 4288,7 4923
D3 Capacitive divider DC(220)1-Ut 4277 4922
D4 Capacitive div. DC(220)1 Vrs 4261 4924-3
D5 Capacitive div. DC(220)1 Vst 4282 4923-2
D6 Capacitive div. DC(220)1 Vrs 4255 4922-4
A1 Shunt AT1 60 kA – Ir 50,263µΩ 22020
A2 Shunt AT1 60 kA – Is 50,118µΩ 22021
A3 Shunt AT1 60 kA – It 50,169µΩ 22022
A4 Shunt AT2 4 kA –Ir 4,003mΩ 22018
A5 Shunt AT2 4 kA –Is 3,994mΩ 22024
A6 Shunt AT2 4 kA –It 4,004mΩ 22028
D7 Capacitive divider DC(30)1-Ur 432 4931
D8 Capacitive divider DC(30)1-Us 417 4930
D9 Capacitive divider DC(30)1-Ut 418 4929
D10 Capacitive divider DC(30)1-Vrs 426,90 4931-0
D11 Capacitive divider DC(30)1-Vst 429,46 4930-29
D12 Capacitive divider DC(30)1-Vtr 428,65 4929-31
B1 Current transformer TA(30)1-R 0,5÷20K 9302
B2 Current transformer TA(30)1-S 0,5÷20K 9303
B3 Current transformer TA(30)1-T 0,5÷20K 9304
B4 Shunt x TA 200mΩ – Ir 210,7 mΩ 56797
B5 Shunt x TA 200mΩ – Is 212,5 mΩ 56796
B6 Shunt x TA 200mΩ – It 214,3 mΩ 56795
E1 Shunt 200µΩ – 60kA – 0,5s 5796
E2 Shunt 200µΩ – 60kA – 0,5s 5797
E3 Shunt 200µΩ – 60kA – 0,5s 200,7 µΩ 5798
E4 Shunt 50 kA x 1s 19,90µΩ 5556
E5 Shunt 50 kA x 1s 19,80µΩ 5557
E6 Shunt 50 kA x 1s 19,98µΩ 5558
D13 RCR divider 100kV 4621 4908
D14 RCR divider 100kV 4909
D15 RCR divider 250kV 4160 31158
D16 RCR divider 250kV 4180 31157
D17 RCR divider 250kV 4180 31156
D18 RCR divider 400kV 4918
D19 RCR divider 600 kV 19635 4919
D20 RCR divider P&V 100 kV 4000 13454
D1229IG
rev.01
CESI
B2017505
Laboratory P140
Measuring system characteristics (2nd)
Pos.
Ref. Type CESI No.
or K
R1 Shunt x TA 160mΩ 2A – Ir 0,1612 Ω
R2 Shunt x TA 160mΩ 2A - Is 0,1609 Ω 9886
R3 Shunt x TA 160mΩ 2A - It 0,1620 Ω
Q1 Shunt x TA 160mΩ 2A - Ir 0,1625 Ω
Q2 Shunt x TA 160mΩ 2A - Is 0,1615 Ω 9782
Q3 Shunt x TA 160mΩ 2A - It 0,1616 Ω
R4 Shunt x TA 60mΩ 5A – Ir 0,0577 Ω
R5 Shunt x TA 60mΩ 5A – Is 0,0618 Ω 9885
R6 Shunt x TA 60mΩ 5A – It 0,0615 Ω
Q4 Shunt x TA 60mΩ 5A – Ir 0,0618 Ω
Q5 Shunt x TA 60mΩ 5A – Is 0,0628 Ω 9783
Q6 Shunt x TA 60mΩ 5A – It 0,0617 Ω
R7 Shunt x TA 0,5 Ω 5A - Ir 0,506 Ω
R8 Shunt x TA 0,5 Ω 5A - Is 0,507 Ω 17676
R9 Shunt x TA 0,5 Ω 5A - It 0,506 Ω
R10 Shunt x TA 1 Ω 5A - Ir 1,067 Ω
R11 Shunt x TA 1 Ω 5A - Is 1,065 Ω 17681
R12 Shunt x TA 1 Ω 5A - It 1,059 Ω
G1 Shunt 2mΩ – 2kA 1,826 Ω 28964
G2 Shunt 2mΩ – 2kA – 0,2s 5808
C1 Current transformer 1000/5 11291
C2 Current transformer 1000/5 11293
C3 Current transformer 1200/5 6812
C4 Current transformer 10 14191
C5 Current transformer 10 17056
C6 Current transformer 10 17057
C7 Current transformer 10 17058
C8 Current transformer 800 14383
C9 Current transformer 20-40/5 14822
C10 Current transformer 20-40/5 14823
C11 Current transformer 20-40/5 14824
C12 Current transformer 600 13403
TV1 Voltage transformer 30 kV - Vrs 300 9306
TV2 Voltage transformer 30 kV - Vtr 300 9305
M1 Multimeter Fluke 77 4523
M2 Multimeter Fluke 1587 56772
P1 PXI 6368 16 channels (HF) 56679
P2 PXI 6368 16 channels (MF) 56678
P3 Clock PXIe 8431/e 56673
D1275IG
CESI
B2017505
Laboratory P140
Measuring system characteristics (3rd)
Pos.
Ref. Type CESI No.
or K
H1 Isolation amplifier n.1 0,1÷1000 56891
H2 Isolation amplifier n.2 0,1÷1000 56893
H3 Isolation amplifier n.3 0,1÷1000 56892
H4 Isolation amplifier n.4 0,1÷1000 56896
H5 Isolation amplifier n.5 0,1÷1000 56894
H6 Isolation amplifier n.6 0,1÷1000 56895
S1 Optical link (30) Ur 1÷250/5 56381
S2 Optical link (30) Us 1÷250/5 56375
S3 Optical link (30) Ut 1÷250/5 56377
S4 Optical link (30) Ir 0,1÷25/5 56365
S5 Optical link (30) Is 0,1÷25/5 56365
S6 Optical link (30) It 0,1÷25/5 56365
J1 Optical Link (office) n.1 1÷300/10 4805
J2 Optical Link (office) n.2 1÷300/10 4807
J3 Optical Link (office) n.3 1÷300/10 4809
J4 Optical Link (office) n.4 1÷300/10 4817
J5 Optical Link (office) n.5 1÷300/10 4813
J6 Optical Link (office) n.6 1÷300/10 4815
J7 Optical Link (office) n.7 1÷300/10 4811
J8 Optical Link (office) n.8 1÷300/10 4819
J9 Optical Link (office) n.9 1÷300/10 4821
K1 Optical Link (shunt 50µΩ) Ir 0,1÷10/10 22333
K2 Optical Link (shunt 50µΩ) Is 0,1÷10/10 22332
K3 Optical Link (shunt 50µΩ) It 0,1÷10/10 22331
K4 Optical Link (shunt 4mΩ) Ir 0,1÷10/10 38225
K5 Optical Link (shunt 4mΩ) Is 0,1÷10/10 38337
K6 Optical Link (shunt 4mΩ) It 0,1÷10/10 38223
V1 Optical link (float) n.3 1÷300/10 5974
V2 Optical link (float) n.8 1÷300/10 5970
V3 Optical link (float) n.9 1÷300/10 5968
V4 Optical link (float) n.10 1÷300/10 5990
V5 Optical link (float) n.11 1÷300/10 5986
V6 Optical link (float) n.12 1÷300/10 5956
V7 Optical link (float) n.13 1÷300/10 5978
V8 Optical link (float) n.15 1÷300/10 5982
V9 Optical link (float) n.18 1÷300/10 5988
D1269IG