Professional Documents
Culture Documents
TKP3501 (196626) Assignment 1
TKP3501 (196626) Assignment 1
ASSIGNMENT 1
TFC= V x W
10
TFC= (10 x 4) / 10
= 4 ha/hr
FE = EFC x 100
TFC
80= (EFC/ 4) x 100
EFC = (80x4) / 100
= 3.2 ha/hr
II. If 10% time is lost in turning, loading and unloading, calculate the
harvested area in 5 hours, and the farm machinery index (FMI). {2 marks}
TFC= 4 ha/hr
III. What can be expected when the speed is reduced by half from the initial speed?
{1.5 mark)
● Effective Field Capacity (EFC) and Actual Field capacity will be in half
values which is 1.6 and 1.8.
IV. Briefly explain, how you can improve the actual field efficiency? {1.5 marks}
● Reduce turning time. Farmers should strive to make fields large, long, and
narrow by eliminating fence rows, ditches, or other barriers.
V. List down three factors contributed to the low efficiency during such operation.
{1 marks}
● Operator Availability
● One Operator Multi-Tasking
● Limited Output
VI. If we assume the field is perfectly square, calculate how many paths of
the combine made to harvest the crop? Please give a brief explanation.
(Tips: consider the area and the width of the combine).
{2 marks}
● Assume the length of the field is 400m and the width is 400m too.
● So, the are of the field is 4ha.
● Assume the width of the implement is 4m
● To calculate path 400m is divided by the width of the implement.
● 400/4 = 100 path. And the number of turning is 99.