Subject: Document Submittal For Closeout Repor Submittal Ref.: DMC/HSSE/INS/581/2023. Rev 01

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Review Comment Sheet (Project – 1713AC)

Subject : Document Submittal for Closeout Repor


Submittal Ref. : DMC/HSSE/INS/581/2023. Rev 01

Status: “B” Approved as Noted.


1. Ensure proper housekeeping of the site at all times.
2. All collected waste materials to be removed from site on daily basis.
3. Material storage improved with mandatory signage and barricade.
4. Site must comply with legal and contractual requirements related to Environmental
Health and safety.
5. Ensure that the Project HSE Plan is perfectly implemented at the site.

Regards,
Date: 16/01/2024

______________________________________________________________________________________________________________
Arif & Bintoak Consulting Architects & Engineers, P.O. Box 3670, Dubai – UAE, Tel: +971 (4) 3372888; Fax: +971 (4) 3370352;
Email: artoak@emirates.net.ae

You might also like