The Audit was conducted on (Feb 01, 2023) at 13MSS with comments, photos, and instruction given to EPC Contractor (SSEM) for
compliance. The site is generally in a good condition with some exceptions as listed below:
1. A ten tons boom truck with plate no. (7605 UHA) was observed attempting to lift heavy concrete pipes out of the ditch (refer to attached
pictures). Considering the following deficiencies: A. no permit to work. B. No PTB. C. No supervision by SSEM site engineer/ Forman. D.
no hard barricades around the circumference of lifting. E. no daily checklist of the equipment. F. many leaks were observed coming out of
the hydraulic lifting arm. G. using damaged, un-coded, and un-inspected lifting rob. Based on violations above, lifting was suspended. A
verbal warning was given to the site engineer, a swap between two civil engineers (Mahmood & Sayed) was agreed at site, and intensive
training on lifting was requested to be provided to the team.
2. Two cars were observed driving recklessly by violating the limit of speed in the access road (refer to attached picture, corrective action
is required).
3. During the audit, three different groups (12 workers) were observed working inside a manhole excavation along with a wheel loader.
The first group consists of 8 workers who were working in a mandrel test for MV duct bank. The second group, is the surveyor and his
helper who were working in surveying the level of the excavation verses backfilling by the wheel loader. Third group, is the compaction &
backfilling team. A wheel loader and Civil Forman. All associated activities were stopped due to interference between activities. No
construction activities shall be taken place around any moving equipment and especially in trenches. A verbal warning was given to the
PM and CM. Safety Manager was instructed to analyze all hazards involved in this situation and release flyers to all workers at site in order
to spread the awareness on “interference in construction works” & “working near to moving equipment”.
1.4 Scaffolding
Comments / Notes: complaint at visited locations Score: 7.5 out of 10
1.5 Ladders
Comments / Notes: compliant at visited locations Score: 8.5 out of 10
Score % 52
2. Safety - General
2.1 Education & Training
Comments / Notes: in general, more training sessions are required for all workers Especially on Score: 4.5 out of 10
“interference in construction works” & “working near to moving equipment”.
2.2 Storage
Comments / Notes: it was not part of this week's inspection. Score: N/A out of 10
2.3 Documentation
Comments / Notes; it was not part of this week's inspection. Score: N/A out of 10
2.4 Fire
Comments / Notes: Accumulation of combustible materials (wooden pallets) at laydown area Score: 4.5 out of 10
2.6 Electricity
Comments / Notes: complaint at visited loactions. Score: 7.5 out of 10
2.8 PPE
Comments / Notes: partially complied. Score: 5 out of 10
2.10 Man-lifts
Comments / Notes: No Man-lift operations was observed during the site visit. Score: N/A out of 10
Score % 53
3. Health
3.1 Welfare
Comments / Notes: All work locations must be provided with rest shelters and potable water points. Score: 6.5 out of 10
3.2 Medical
Comments / Notes: compliant; there is a registered nurse at site Score: 8.5 out of 10
Score % 75
4. Environment
4.1 Spill Prevention
Comments / Notes: complaint at visited locations. Score: 7.5 out of 10
4.3 Noise
Comments / Notes: Noise is limited at the visited loactions; compliant. Score: 10 out of 10
(Signature) (Name)
LIFE CRITICAL 52
GENERAL 53
HEALTH 75
ENVIRONMENT 73
OVERALL 61
0 - 25% Extremely Poor COMPLETED COPIES TO:
20 - 40% Poor SAPL Program Manager
41 - 60% Fair SAPL Operations Manager
61 - 75% Good SAPL Construction Manager
76 - 85% Very Good SAPL HSE Manager
86 - 100% Excellent
PROJECT:
PIC P-7719
2. Two cars were observed driving recklessly by Safe driving training provided to all
2 violating the limit of speed in the access road (refer to 2.7 7/2/2023 the drivers. Speed limit signage
attached picture, corrective action is required) increased.
Note: Contractors Project Manger is to provide date of completion of each item, have project SAPL SRCM sign-off to close the items, sign and return this sheet to
the SAPL HSE Manager.
SIGNATURE: DATE:
DD MM YYYY
Spoil is kept a distance of at least the depth away The Lift: Outriggers deployed/sand pad being used?
Method Statement approved for - Piling, Tunnel Boring,
Man-basket - 3rd party certified, workers wearing harness
etc
Permit to Dig issued, confined space permit issued (if
Lifting gear condition, color coded, tag lines
applicable)
O/H power lines nearby, Utility Company permit required,
Exposed underground services supported
goalposts erected?
Daily/Weekly checks carried out ? Operators manual
available.
Lifting equipment – slings / shackles – 3rd party inspection
cert.
Risers, Floor & Wall Openings covered, barricaded, Scaftags - correct color, filled in, weekly inspection details on
signage? rear
Lifeline - approved, wire rope, anchor points, 3 clamps on
Base: sole boards and sole plates on firm even surface
each end.
8/13
Senior Management HSE Evaluation Guide
Only recognized, factory supplied, scaffold components used.
Each ladder uniquely numbered, ladder register Flashing beacons , back up alarms
Non-slip stoppers attached - top & bottom Spotter / Flagman physically protected
Suitably
No site-fabricated ladders, no domestic grade ladders
stored, Daily/weekly inspections (copy in vehicle cab)
also
defective Operators - licensed / 3rd party cert
Condition of plant?
SAFETY - General
2.1 Education & Training 2.2 Storage
Bulletin boards: prominent area(s) & well presented,
No mixing of Fuels/Chemicals/Gases
effective
Materials stored/ stacked neatly / safely / protected from
Toolbox talks carried out & appropriate to risks on site.
elements.
Safe Working incentive reward scheme Stores not overloaded, stacked too high, step ladders available
Posters - Good & Bad practice displayed Material Safety Data Sheets available
9/13
Senior Management HSE Evaluation Guide
Lighting covered
Incident Records
Ventilation & lighting where needed - RCD for 230v systems, GFCI's for 110v systems
All metal housings that may come into contact with electricity
Hazards from actual work activities considered &
must be grounded - electrical boards, metal clad offices, stores
controlled (working at height, welding, painting etc)
containers etc
Lock-out tag-out system where needed
10/13
Senior Management HSE Evaluation Guide
Trailing cables (buried in pipes, or raised)
HEALTH
3.1 Welfare 3.2 Medical
Toilets - clean, soap, towels, running water H/C. Roster.
Signed as 'First Aid Room' & 'Red Crescent' sign
Septic tank.
Chilled drinking water available. Disposable cups? Biohazard bin, medical bed with disposable paper cover
11/13
Senior Management HSE Evaluation Guide
Water coolers sealed/dated.(designated cleaning area,
Ramp access & stretcher
Disinfectant)
Sun Shades / rest areas. Sufficient size/number Hot & cold running water, soap, paper towels. Cleaning roster
Food Hygiene
Sufficient medical supplies - For size of population
Trained First Aiders (+ kits) for remote sites, or sites over 300m
Medicines - over counter only, sufficient supplies. Inventory
displayed.
Suitable PPE provided for task Original containers, lids fitted, labeled as to contents
Heavier materials stacked at waist height MSDS copies - Safety Dept, Stores, First Aid Room
ENVIRONMENT
4.1 Spill Prevention 4.2 Waste Management
Concrete Wash-out Pit Septic Tanks Effective water management Timely waste removal
Concrete Fuel Storage Bund Spill Kits Dumpsters / Skips No machine idling
Emergency Spill
Evidence of spill training Excessive damaged materials? Office energy management
Procedure
4.3 Noise
Wispa-lite Generators Warning / Cautionary
Signs
12/13
Senior Management HSE Evaluation Guide
Audiometry records for noise intensive activities