Content of Training - Trail Bridge-For TVT Trainers
Content of Training - Trail Bridge-For TVT Trainers
1. Introduction
Training on: Training on Trail Bridge Survey, Design, Construction, & Maintenance
Organized By: HELVETAS – Ethiopia and MoLS
Delivered By: Wasihun M. and Worku B
Contributors: Participants
Duration: January 29/2024 to February 07/2024 (Ten Days)
Place of Training: Addis Ababa, Ethiopia
Participants: Participants from TVT Institutes throughout the country Ethiopia
2. Objective of the Training
The objective of the training program on trail bridge construction and maintenance is to equip participants
with the knowledge, skills, and tools necessary to design, construct, and maintain trail bridges effectively
and safely. The training aims to provide a comprehensive understanding of best practices, technical
aspects, and considerations involved in trail bridge projects, enabling participants to contribute to the
development of reliable and accessible trail bridge infrastructure.
5. Training Methodology
The training will have both theoretical and practical design sessions.
Approaches:
Presentation with the supporting photos and videos
Group work discussion, exercises and reflection
Field onsite trainings and exercises
Question and Reflection
Experience sharing among trainees
1
Training on Trail Bridge, Design,
Construction, Maintenance and
Standards
Training Schedule
Presenter 10:30 12:00 15:00
10:00 – 15:45 - 16:00 –
Date Days 8:30 – 10: 00 - 10:45 - 12:00 – 13:00 - 14:00 14:00 – 15:00 –
10:30 16:00 17:00
10:45 13:00 15:15
Wasihun Opening Course D & N type major bridge
Introduction to D & N type major bridge
29.01.2024 Monday M.& Ceremony & Content components
Trail Bridges components
Worku B. Introduction
Wasihun Site Investigation Site Investigation &
General arrangement
30.01.2024 Tuesday M.& & Topography Topography Survey Construction Materials
drawing
Worku B. Survey
Wasihun
Wednes
31.01.2024 M.& Site Visit Site Visit Report preparation Report preparation
day
Worku B.
Wasihun
Thursda
01.02.2024 M.& Presentation Presentation SSTB D Type Design SSTB D Type Design
y
Worku B.
Wasihun D-Type Steel and
D-Type Steel and N-Type Steel and Construction N-Type Steel and
02.02.2024 Friday M.& Construction
Construction Drawing Drawing Construction Drawing
Lunch Break
Worku B. Drawing
Tea Break
Tea Break
Wasihun
Saturda Setting out D Type Construction D Type Construction
03.02.2024 M.& Setting out Exercise On-site
y Exercise On-site Methodology Methodology
Worku B.
Wasihun D Type
M.& N-type Construction N-type Construction
05.02.2024 Monday Presentation Construction
Worku B. Methodology Methodology
Methodology
Wasihun SSTB D Type
SSTB D Type Quantity and SSTB N Type Quantity and SSTB N Type Quantity
06.02.2024 Tuesday M.& Quantity and Cost
Cost estimation Cost estimation and Cost estimation
Worku B. estimation
Wasihun
M.& Discussion,
Wednes Discussion, question, and
07.02.2024 Worku B. Trail bridge Maintenance question, and Certification and closing
day answer
answer