Engineering Design Work

Phase Project

1. Conceptual Development & Feasibility


2. Front End Engineering Design (FEED)
3. Detail Engineering Design (DED)
4. Procurement
5. Construction
6. Check Out & Commissioning
7. Operation
Phase Project

• Pada phase tahap 2 (FEED) sudah di mulai untuk


Deliverable dari beberapa discipline untuk di review
oleh Owner/Client.
• Pada Tahap 3 (DED) hanya mendevelop beberapa
deliverable dari actual yang di terima dari Vendor
Print ( jika ada tambahan informasi dari
manufacture)
Phase Project

• FEED (atau kadang biasa juga disebut dengan Basic


Engineering) lebih ditujukan untuk budgetary Client.
• FEED bertujuan agar Client bisa meminta penawaran
(dalam bentuk tender) dan memperoleh penawaran
(bidding).
• Setelah tender close, pemenang sudah ditetapkan, maka
ada tahap selanjut nya yang harus dilakukan oleh
pemenang tender adalah DED (Detail Engineering
Design).
• Output DED yaitu detail design yang bisa
diimplementasikan.
• Tingkat ketelitian FEED sekitar 90%, selanjutnya
disempurnakan dengan DED agar mencapai 100%.
Basic Design
Deliverable List (Basic Design)
Gantt Chart
Gantt Chart (cont’d)
Gantt Chart (cont’d)
Load List
One Line Diagram
LAYOUT PERALATAN
Layout routing kabel elektrikal dan instrumentasi
Layout rencana tata penerangan dan
air conditioning
Layout rencana sistem penangkal petir
Rencana Sistem Pentanahan
Material Take Off
DED
Deliverable List (DED)
Design Phylosophy

1. IFR (Issued For Review)


2. IFA (Issued For Approval)
3. IFC (Issued For Construction)
4. IFD (Issued For Design)
Design Philosophy - IFA
1.0 Introduction
1.1 Project Description
1.2 Scope
1.3 General
1.4 Abbreviations
1.5 Terminology
2.0 Reference
2.1 Project Specification
2.2 Codes and Standard
2.3 Order of Precedence
Cont’d
3.0 SYSTEM DESIGN PHILOSOPHY
3.1 GENERAL
3.2 DESIGN LIFE
3.3 ENVIRONMENTAL CONDITION
3.4 AREA CLASSIFICATION AND EQUIPMENT SELECTION
3.5 POWER SYSTEM DESIGN
3.6 CAPACITY OF ELECTRICAL SYSTEM
3.7 SYSTEM VOLTAGE
3.8 POWER SUPPLY DISTRIBUTION SYSTEM
3.9 VOLTAGE DROPS
3.10 SYSTEM GROUNDING
3.11 SHORT CIRCUIT CAPACITIES
3.12 INSULATION SYSTEM
3.13 PROTECTION AND METERING SYSTEM
3.14 DC POWER SUPPLY
3.15 EMERGENCY POWER SUPPLY
3.16 UNINTERRUPTIBLE POWER SUPPLY (UPS)
3.17 POWER FACTOR IMPROVEMENT
3.18 POWER SOURCE DETAILS
Cont’d
4.0 Equipment design philosophy
4.1 General
4.2 Transformer
4.3 Switchboards
4.4 Power Factor Correction Capacitors
4.5 Gas Engine-Driven Generator
4.6 Uninterruptible Power Supply (UPS
4.7 Battery Charger and Distribution Boards
4.8 Batteries – DC supplies
4.9 Motors (Booster Pump)
4.10 Emergency Diesel Engine-Driven Generator
4.11 Automatic Transfer Switch
4.12 Grounding
4.13 Electrical Cables
4.14 Local Motor Control Station
4.15 Convenience Receptacles
Cont’d
5.0 Substation design philosophy
6.0 Installation Design
6.1Cabling System
6.2Lighting System
6.3Grounding & Lightning Protection System
7.0 Misscellaneous
7.1Cathodic Protection
7.2Fire Alarm System
8.0 Inspection, Testing, Commisioning, and Start-up
Spesifikasi Umum di Lingkup
Pekerjaan Elektrikal
Spesifikasi Gas Engine Generator
5.0 Technical Requirements
5.1 General
5.2 Gas Engine
5.3 Synchronous Generator Set
5.4 Engine and Generator Control Panel
6.0 Miscellaneous
6.1 Nameplates
6.2 Site Support
6.3 Protective Coating
6.4 Spares and Special Tools
6.5 Packing, Preservation and Transportation
6.6 Performance Guarantee & Warranty
7.0 Inspection and testing
7.1 General Requirements
7.2 Acceptance Test
7.3 Performance Test
7.4 Report and Acceptance Certificate
7.5 Inspection, Testing and Pre-Commissioning
Kalkulasi
KALKULASI (Preliminary Study)
1. Load list.
2. Load Flow.
3. Short Circuit.
4. Cable Sizing.
5. Distribution & Protection System.
6. Grounding System.
7. Lightning System.
8. Sistem suplai tenaga listrik (Utilitas, Generator, dan
UPS).
9. Cathodic Protection.
10. Hazardous Area Classification.
Load Flow
Short Circuit
Cable Sizing
Lightning System
Cathodic Protection
Hazardous Area Classification
1.0 Introduction
1.1 Project Description
1.2 Scope
1.3 Abbreviations
1.4 Definition of terms
2.0 Reference
2.1 Project Specification
2.2 Codes and Standards
2.3 Order of Precedence
3.0 Principles
3.1 Plant Design
3.2 Area Classification Basis
3.3 Flammable and Combustible Liquids, Gases, and Vapors
3.4 Source of Release
3.5 Ventilation
3.6 Source of Hydrogen Release
4.0 Specific Situation
4.1 Common Application
4.2 Production Facilities on Land
4.3 Petroleum Pipeline Transportation Facilities
5.0 Summary
5.1 Flammable and Combustible Liquids Class
5.2 Equipment Groups
5.3 Temperature Class
Drawing
Drawing
Drawing
Drawing
Work Schedule
Tugas
• Gunakan AutoCAD ME, desain ulang basic
design di atas.

You might also like