BILL OFF QUANTITY

Proyek :WWTP
Pemilik :PT SREEYA SEWU INDONESIA
Lokasi :PT SREEYA SEWU INDONESIA,Balaraja
Tgl :04-01-2023

No Jenis pekerjaan Unit Qty Harga Matrial Upah Jumlah


wwtp sat jumlah sat jumlah
1 Bowplang m 14.00 35,000.00 490,000.00 15,000.00 210,000.00 700,000.00
2 Gali tanah m3 7.00 - 115,000.00 805,000.00 805,000.00
3 Buang tanah bekas galian ke samping m3 7.00 - 250,000.00 1,750,000.00 1,750,000.00
4 Bongkar pondasi tangki air dan towernya lot 1.00 - 850,000.00 850,000.00 850,000.00
5 Pasang kembali pondasi tangki air - - -
dan towernya,instalasi air nya lot 1.00 - 2,000,000.00 2,000,000.00 2,000,000.00
6 Pasang dinding bata merah m2 19.00 165,000.00 3,135,000.00 50,000.00 950,000.00 4,085,000.00
7 Plester aci dinding bata merah m2 38.00 90,000.00 3,420,000.00 25,000.00 950,000.00 4,370,000.00
8 Sloop 15x20cm m1 20.00 150,000.00 3,000,000.00 50,000.00 1,000,000.00 4,000,000.00
9 Ring balok 15x15cm m1 29.00 150,000.00 4,350,000.00 50,000.00 1,450,000.00 5,800,000.00
10 Tiang kolom 15x15cm m1 14.00 135,000.00 1,890,000.00 50,000.00 700,000.00 2,590,000.00
11 Kranjang bola bola 1.5mx1mx1.2m - - -
siku 30x30cm,kawat nyamuk ss unit 1.00 2,350,000.00 2,350,000.00 650,000.00 650,000.00 3,000,000.00
12 Kranjang bola bola 0.80mx1mx1.m - - -
siku 30x30cm,kawat nyamuk ss unit 1.00 2,250,000.00 2,250,000.00 650,000.00 650,000.00 2,900,000.00
13 Kranjang bola bola 0.80mx1mx1.m - - -
siku 30x30cm,kawat nyamuk ss unit 1.00 2,250,000.00 2,250,000.00 650,000.00 650,000.00 2,900,000.00
14 Instalasi ,pralon air lot 1.00 2,200,000.00 2,200,000.00 600,000.00 600,000.00 2,800,000.00
15 Pompa air unit 1.00 2,500,000.00 2,500,000.00 250,000.00 250,000.00 2,750,000.00
16 Tutup bak wwtp baru lot 1.00 1,500,000.00 1,500,000.00 550,000.00 550,000.00 2,050,000.00
17 Cor lantai 1.4 lot 1.00 750,000.00 750,000.00 150,000.00 150,000.00 900,000.00
Di Ajukan Oleh Total Matrial 30,085,000.00 Total Upah 14,165,000.00

S U J I M A N Total Matrial dan Upah 44,250,000.00


Bio Putra Pratama cv
Nb. Dp. 30%
sisa setelah pekerjaan selesai 100%
Pekerjaan sesuai BQ