ETP MCC

FEEDER DETAILS POWER CABLE CONTROL CABLE REMARKS


SIZE IN
SL.NO APPLICATION SIZE IN SQMM ACTUAL LENGTH ACTUAL LENGTH
SQMM
1 47. SLUDGE TRANSFER FOR EQUILISATION-1 3C*6SQMM*1R 56 4C*1.5*1R 56 CONNECTION DONE
2 47. SLUDGE TRANSFER FOR EQUILISATION-2 3C*6SQMM*1R 56 4C*1.5*1R 56 CONNECTION DONE
3 48. SLUDGE TRANSFER FOR BUFFER TANK PUMP-1 3C*6SQMM*1R 82 4C*1.5*1R 82 CONNECTION DONE
4 48. SLUDGE TRANSFER FOR BUFFER TANK PUMP-2 3C*6SQMM*1R 82 4C*1.5*1R 82 CONNECTION DONE
5 49. SLUDGE TRANSFER PRIMARY CLARIFIER PUMP-1 3C*6SQMM*1R 98 4C*1.5*1R 98 CONNECTION DONE
6 49. SLUDGE TRANSFER PRIMARY CLARIFIER PUMP-2 3C*6SQMM*1R 98 4C*1.5*1R 98 CONNECTION DONE
7 50. SLUDGE TRANSFER PRIMARY CLARIFIER PUMP-1 3C*6SQMM*1R 98 4C*1.5*1R 98 CONNECTION DONE
8 50. SLUDGE TRANSFER PRIMARY CLARIFIER PUMP-2 3C*6SQMM*1R 98 4C*1.5*1R 98 CONNECTION DONE
9 51. SLUDGE TRANSFER SECONDARY CLARIFIER PUMP-1
10 51. SLUDGE TRANSFER SECONDARY CLARIFIER PUMP-2
11 52. SLUDGE TRANSFER ETP & WTP MAINT PUMP-1
12 52. SLUDGE TRANSFER ETP & WTP MAINT PUMP-2
13 53. SLUDGE TRANSFER EXCESS CONDENSATE PUMP-1
14 53. SLUDGE TRANSFER EXCESS CONDENSATE PUMP-2
15 53. SLUDGE TRANSFER EXCESS CONDENSATE PUMP-3
16 53. SLUDGE TRANSFER EXCESS CONDENSATE PUMP-4
17 54. HOT WATER TRANSFER 2ND STAGE PUMP-1
18 54. HOT WATER TRANSFER 2ND STAGE PUMP-2
19 55. TREATED WATER TRANS. ETP PUMP-1 3C*6SQMM*1R 105 4C*1.5*1R 105 CONNECTION DONE
20 55. TREATED WATER TRANS. ETP PUMP-2 3C*6SQMM*1R 105 4C*1.5*1R 105 CONNECTION DONE
21 56. TREATED WATER PUMP TO EWTP PUMP-1
22 56. TREATED WATER PUMP TO EWTP PUMP-2
23 57. TREATED WATER PUMP TO EWTP PUMP-1
24 57. TREATED WATER PUMP TO EWTP PUMP-2
25 58. CLEANING DAY TANK TRANSFER PUMP-1
26 58. CLEANING DAY TANK TRANSFER PUMP-2
27 DE WATERING PUMP
28 ETP AIR BLOWER-1 35 132 (66*2) 4C*1.5*1R 66 CONNECTION DONE
29 ETP AIR BLOWER-2 35 132 (66*2) 4C*1.5*1R 66 CONNECTION DONE
30 ETP AIR BLOWER-3 35 132 (66*2) 4C*1.5*1R 66 CONNECTION DONE
31 ETP AIR BLOWER-4 ( MATANGI COOLING TOWER) 35 420 (210*2) 4C*1.5*1R 210 CONNECTION DONE
32 ETP AIR BLOWER-5 ( MATANGI COOLING TOWER) 35 420 (210*2) 4C*1.5*1R 210 CONNECTION NOT DONE
33 ETP AIR BLOWER-6 ( MATANGI COOLING TOWER)
34 N. PIT STIRRER 6 49 4C*1.5*1R 49 CONNECTION DONE
35 STIRRER 1 1.5 110 4C*1.5*1R 110 CONNECTION DONE
36 STIRRER 2 1.5 110 4C*1.5*1R 110 CONNECTION DONE
37 SPARE FEEDER
38 SPARE FEEDER

40 LIGHTING DB
41 WELDING DB
42
43 ARIATION TANK MOTOR-1 3C*6SQMM*1R 134 4C*1.5*1R 134 CONNECTION NOT DONE
44 ARIATION TANK MOTOR-2 3C*6SQMM*1R 134 4C*1.5*1R 134 CONNECTION NOT DONE
45 ARIATION TANK MOTOR-3 3C*6SQMM*1R 134 4C*1.5*1R 134 CONNECTION NOT DONE
46 MONTHLY WASH TANK MOTOR-1 3C*6SQMM*1R 214 4C*1.5*1R 214 CONNECTION NOT DONE
47 MONTHLY WASH TANK MOTOR-2 3C*6SQMM*1R 214 4C*1.5*1R 214 CONNECTION NOT DONE
48 MONTHLY WASH TANK MOTOR-3 3C*6SQMM*1R 214 4C*1.5*1R 214 CONNECTION NOT DONE
49 HOT WATER TRANSFER PUMP-1 (MATANGI CT) 3C*6SQMM*1R 185 4C*1.5*1R 185 CONNECTION DONE
50 HOT WATER TRANSFER PUMP-2 (MATANGI CT) 3C*6SQMM*1R 185 4C*1.5*1R 185 CONNECTION DONE
51 SPARE (MATANGI CT) MONOBLOCK MOTOR 3C*6SQMM*1R 185 4C*1.5*1R 185 CONNECTION DONE