I - TIME LOG
TIME LOG
Date Time Event
PRODUCT: RON 83
CUBIC METERS AT 15ºC 2.477,442
METRIC TONS (VAC) 1.732,475
CUBIC METERS AT 60ºF 2.479,355
BARRELS AT 60ºF 15.593,020
GALLONS AT 60ºF 654.907
METRIC TONS (AIR) 1.729,750
LONG TONS 1.702,430
DENSITY AT 15°C 0,6993
PRODUCT: RON 83
CUBIC METERS AT 15ºC 2.453,322
METRIC TONS (VAC) 1.715,608 1.715,608
CUBIC METERS AT 60ºF 2.455,216
BARRELS AT 60ºF 15.441,207
GALLONS AT 60ºF 648.531
METRIC TONS (AIR) 1.712,909
LONG TONS 1.685,856
API GRAVITY AT 60ºF 70,80
DENSITY AT 15°C 0,6993
FREE WATER RECEIVED 0,00
1.715,61
FREE WATER
CUBIC METERS METRIC TONS,
SHORE TANK DATE CUBIC VOLUMETRIC METERS (G.O.V.)
@ 15°C VACUO
METERS
201 2/9/2024 2.452,554 1.715,071 0,000 METER 1
Litros a 15 por Despacho 2/9/2024 0,000 0,000 0,000 INITIAL METER 0,000
Litros a 15°C por Reachique 2/9/2024 0,768 0,537 0,000 FINAL METER 0,000
DIFFERENCE 0,000
METER 2
2/9/2024 0,000 0,000 0,000 INITIAL METER 0,000
FINAL METER 0,000
DIFFERENCE 0,000
METER 3
INITIAL METER 0,000
FINAL METER 0,000
DIFFERENCE 0,000
METER 4
INITIAL METER 0,000
FINAL METER 0,000
TOTAL 2.453,322 1.715,608 0,000 DIFFERENCE 0,000
Remarks: TOTAL 0,000
Se deja constancia que el la carga de origen no se verifico agua libre en la barcazas-
GOV, M³ GOV, M³
SHIP'S FIGURES 30,988 0,000
SHORE FIGURES 31,560 0,000
DIFFERENCE 0,572 0,000
PERCENTAGE 1,85% #¡DIV/0!
X - SAMPLES
BEFORE LOAD
TANK No. UPPER MIDDLE LOWER AVERAGE
201 33,60 33,60 33,60 33,60
15,00 15,00 15,00 15,00
#¡REF! 0,00 0,00 0,00 0,00
#¡REF! 0,00 0,00 0,00 #¡REF!
#¡REF! 0,00 0,00 0,00 #¡REF!
#¡REF! 0,00 0,00 0,00 #¡REF!
#¡REF! #¡REF! #¡REF! #¡REF! #¡REF!
AFTER LOAD
TANK No. UPPER MIDDLE LOWER AVERAGE
201 32,40 32,40 32,40 32,40
15,00 15,00 15,00 15,00
#¡REF! 0,00 0,00 0,00 0,00
0,00
SUMMARY M³ @ 15°C
GUILLERMO MATTO
AMSPEC - PARAGUAY
H LOMBARDO - C ARMOA
AMSPEC - PARAGUAY
This form is to be filled out by the Oil Test Internacional representative present at the key meeting.
The form is to returned to the office inspection file.
7. WERE DISCHARGE PROCEDURES AND PLANS REVIEWED AND UNDERSTOOD BY EVERYONE CONCERNED? YES
Includes: Discharge will be stopped as per terminal instructions
Arrangements for sampling from vessel manifold during discharging.
Capacity of shore tanks nominated to receive product.
NOTE:
If any circumstances exist which prevents the inspector / chemist performing his / her inspection in conformance with applicable API guidelines. Job Order,
Local work instructions or Client instructions, inmmediately notify your supervisor / manager.
8. WERE KEY OPERATIONAL PERSONNEL IDENTIFIED, RESPONSIBILITIES DEFINED AND COMMUNICATION PROCEDURES
ARRANGED? YES
9. WAS AVAILABLE THE FIXED EQUIPMENT CALIBRATION ON BOARD BEFORE DISCHARGE NO , IF NOT DELIVERED CERTIFICATE,
ISSUE LETTER OF PROTEST.
REMARKS: .
.
G.S.V. @ 15°C with VEF Loaded. 2.450.089 Liters @ 15,56°C Loaded. 2.451.980 GAUGE TAPE OTIP-C21
OBS. Remarks: …
G.S.V. @ 15°C with VEF Loaded. 0 Liters @ 15,56°C Loaded. GAUGE TAPE OTIP-C21
0
SUMMARY / RESUMEN
BEFORE M3 2.450,089
AFTER M3 0,000
TOTAL DISCHARGE/DESCARGADO M3 2.450,089
SHORE T.O.V. Shell ROOF FREE WATER G.O.V. Density TEMP Thermal V.C.F. G.S.V. Metric
GAUGE
TANK DATE TIME CTS CORRECTION GAUGE VOLUME to Expansion Table 15,0 Tons
Nº mm m³ m³ mm m³ m³ 15,0 °C Coefficient 54B m³ Vac
o 2024-02-08 20:50 970 223,583 1,00000 0,000 33 9,784 213,799 0,70400 33,60 1,00000000 0,97540 208,540 146,812
201
c 2024-02-09 12:05 12000 2.736,814 1,00000 1,895 33 9,784 2.725,135 0,70040 32,40 1,00000000 0,97650 2.661,094 1.863,830
RECEIVED 2.513,230 1,895 0,000 2.511,335 2.452,554 1.717,018
Cant. Por c 2024-02-09 0,786 1,00000 0,000 0 0,000 0,786 0,70040 …….. 1,0000000 ………. 0,768 0,538
reachique … 1,00000 0,000 0 0,000
DELIVERED 0,786 0,000 0,000 0,786 0,768 0,538
Muestras:Mantener en buenas condiciones. Preferiblemente en lugar seco fresco. Evite la luz solar.
OIL TEST INTERNACIONAL conservara las muestras por 90 días, dependiendo del producto o según los requisitos del Cliente.
OSMAR ESCOBAR
VESSEL REPRESENTATIVE
To: AZ 144
Attn: COPETROL
Dear Sir:
We have been appointed as surveyors of the above named vessel by our principals
Acting for and thier behalf, we do hereby protest with you concerning the following:
LINE DISPLACEMENT
GENERAL REMARKS
From Barge To Shore
Tank No. 1B 201
Initial Gauge 3377 970
Final Gauge 3039 1.108
Initial Volume / T.O.V. 310389 223.583
Final Volume / T.O.V. 279.401 255.143
Line on duty 31.560 0
Delivered / Received 30.988 0 31.560
Difference (Volume In liter) 572
Percentage 1,85%
Notes:
If difference exceeds more than 1/8" of the vessel tanks capacity table or more than 1/4" of the shore tanks capacity table,
whichever is greater, a Notice of Discrepancy must be issued.
TO : AZ 144 . , .
Dear Sir
Accordingly, you are hereby notified that further investigation is intended to resolve this discrepancy.
Will you kindly acknowledge receipt on the copy thereof and return it to us. The signatures thus obtained are for
recfeipt only and in no way acknowledge responsibility for the incident.
H LOMBARDO - C ARMOA
AMSPEC - PARAGUAY
Receipt acknowledged
OSMAR ESCOBAR
Vessel Representative
SERGIO CACERES
Terminal Representative
TO : COPETROL . , .
Dear Sir
Accordingly, you are hereby notified that further investigation is intended to resolve this discrepancy.
Will you kindly acknowledge receipt on the copy thereof and return it to us. The signatures thus obtained are for
recfeipt only and in no way acknowledge responsibility for the incident.
H LOMBARDO - C ARMOA
AMSPEC - PARAGUAY
Receipt acknowledged
OSMAR ESCOBAR
Vessel Representative
SERGIO CACERES
Terminal Representative