9/4/2020 : Quiz Submissions - Quiz 2.

5 - Non-Credit 2019-2020 - Principles Constr Document (CNST-002-O4A) - SAIT

Quiz Submissions - Quiz 2.5


Brandon Gemme (username: 000850759)

Attempt 1
Written: Jun 17, 2020 8:06 PM - Jun 17, 2020 8:10 PM
Submission View

Your test has been submitted successfully.

Question 1 0 / 1 point

Explain why an addendum should not be issued too close to the bid closing date.

Because a Bidder requires enough time to ensure that they can meet the new project
requirements,

This question has not been graded.

The correct answer is not displayed for Long Answer type questions.

Hide Feedback

It can put undue hardship on bidders to react to the changes. (M2, L5: Addenda)

Question 2 0 / 1 point

Where should the conditions for disqualifying a bid be included?

Instruction to Bidders

This question has not been graded.

The correct answer is not displayed for Long Answer type questions.

Hide Feedback

In the Instructions to Bidders. (M2, L5: Bidding Requirements)

https://learn.sait.ca/d2l/lms/quizzing/user/quiz_submissions_attempt.d2l?isprv=&qi=887618&ai=6708576&isInPopup=0&cfql=0&ou=383786 1/3
9/4/2020 : Quiz Submissions - Quiz 2.5 - Non-Credit 2019-2020 - Principles Constr Document (CNST-002-O4A) - SAIT

Question 3 0 / 1 point

What type of information should be included in the Instructions to Bidders?

All information required by a bidder to intelligently prepare and submit a bid, including:
Project Identification; Documents; Examination of Documents and Site; Resolution of
Discrepancies and Ambiguities, and Issuing Clarifications; Substitution of Products;
Basis of Bids; Preparation of Bids; Bid Security Information; Requirements for Bonding;
Subcontractor Listing; Identification and Submission of Bid; Modification or Withdrawal
of Bid; Disqualification of Bidders; Governing Laws and Regulation; Opening of Bids;
Award of Contract; and, Execution of Contract.

This question has not been graded.

The correct answer is not displayed for Long Answer type questions.

Hide Feedback

The requirements with which a bidder must comply before and during submission of a
bid.

The conditions for awarding a bid.

Similar information as the Invitation to Bid, including:

project identification
information about document availability and returning documents
requirements for examining bid documents and project site
a description for how discrepancies will be dealt with during the bid period, how
questions should be raised, and how clarification will be issued
a description of requirements related to proposed substitutions
a description of the basis of the bid (if required)
a description of how to prepare and submit the bid
bid security requirements
bonding requirements
how to modify or withdraw a bid
what conditions would disqualify a bid
what laws and regulations govern the project
time and place for bid opening; whether it’s private or public
procedures for awarding the contract
requirements related to contract execution (M2, L5: Instructions to Bidders)

https://learn.sait.ca/d2l/lms/quizzing/user/quiz_submissions_attempt.d2l?isprv=&qi=887618&ai=6708576&isInPopup=0&cfql=0&ou=383786 2/3
9/4/2020 : Quiz Submissions - Quiz 2.5 - Non-Credit 2019-2020 - Principles Constr Document (CNST-002-O4A) - SAIT

Attempt Score:0 / 3 - F
Overall Grade (highest attempt):0 / 3 - F

Done

https://learn.sait.ca/d2l/lms/quizzing/user/quiz_submissions_attempt.d2l?isprv=&qi=887618&ai=6708576&isInPopup=0&cfql=0&ou=383786 3/3

You might also like