sIRASPUR hOSPITAL - HPD - PWD - 09-03-2020

You might also like

Download as pdf
Download as pdf
You are on page 1of 10
/ F No, 21-77/20194Asll 4ovemment of india Ninity of Epdronment, Forest and Climate Change (ALI Section) Indira Paryavaran Bhawan, Jor Bagh Road, New D Hg] tozen fe 09 Marah! 20207 10; Zo [PS Pra - 18 Lae Mls Public Works Department (GNCTD) MAR 2ge0 Health Project Division (North), Dr. BSA Hospital Campus, Sector-6, Rohini, Delhi - 110085 = E-Mail: skaspurhosptaidelhi@qmeil.com Subject: Proposed Construction of Super Specialty Hospital at Siraspur, New Delhi by M's Health Project Division (North), PWD - Environmental Clearance - reg. Sir, This has reference to your online proposal No. IWDUMIS/123025/2019 dated 25.10.2019, submitted to this Ministry for grant of Environmental Clearance (EC) in terms of the provisions of the Environment Impact: Assessment (EIA) Notification, 2006 under the Environment (Protection) Act, 1986, 2. The proposal for grant of environmental clearance to the project ‘Proposed Construction: of Super Speciztty Hospital’ at Sirespur, New Delhi by M/s Health Project Divsion (North), PND, was consisted by the Expert Aparasal Committee (Infia2) in is meeting held during 25-26 November, 2019 and 48” meeting held during 28-29 ena 2020. The details of the project, as per the documents submitted by the project ye ee and also es informed duting the above meeting ere as under:- fiz do | ‘The project is located at Siraspur, New Delhi, Latitude 23°45'28.68"N and Longitude Ze) 7770845 38°E. (i) The project is new. The total plot area is 80,838 sqm. FSI area is 60,561 sqm and total builtup area of 94,778 sqm. The project comprisas of Hospital Block (1168 Beds), Nurse Staton, Diagnostic Cantor and Food Court Maximum height of the building is 41.2 m. (ii) The total water requirement for the construction Project is estimated to be approx. 490 ML. The water supply during Construction phase will be met through STP Treated water/Private water tanker. During the consiruction phase, soak pits and ‘septic tanks are provided for disposal of waste waler. Temporary toilets will be provided for labourers. (Ww) During operaton phase, total water requirement will be 1278 KLD and will be’ met from Delhi Jal Boerd (487 KLD fresh water) and recycled water (411 KLD) and 379 KLD treated water from other sources. The treated water (411 KLD) from STP shall be recycledire-used for flushing (172 KLD), gardening (42 KLD) and HVAC (197 KLD) eto). As proposed, excess treated water from ETP (98 KLD) shall be discharged to external sewer (vy) About 3564 kg/day solid waste will be generated trom the project. The biodegradable waste (1425.6 kg/day) will be processed in OWC, Inert waste (356.4 kg/day) will be used for land filing and the non-biodegradable waste generated (1782 ka/day) will be handed over to vendors 8 om we Proposal Ne wrOLMIS/2902820°9 ae Papa otx0

You might also like