MD Imran Alam Project & Planning Engg Civil.

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

MD.

IMRAN ALAM
Civil Engineer
Project Engineer/Planning Engineer
Objective:
Seeking a Planning Engineer/Project Engineer role to leverage my
diverse skill set in project planning, execution, and client management.
Excited to contribute my expertise to various projects.
Professional Background:
With seven years of experience in civil engineering, I progressed from
Contact a Site Engineer to a Site Lead Engineer for NHAI projects and later
served as a Project Engineer for Indian Railway projects. Engaging
directly with esteemed clients, including Senior IES officers and PSU
+91 9641437973 officials, I ensured construction quality, effective site management,
and led teams. In the role of Project Engineer, I demonstrated a
mdimrana010@gmail.com comprehensive understanding of rail infrastructure and contributed
Hamid Nagar, Burnpur, Asansol, to project planning.
Dist-Paschim Bardhmaan, West
Bengal, India Pin-713325
Experience
Zetwerk Manufacturing Businesses Pvt. Ltd.
June,2023-Till date Asansol, West Bengal, India
Education Project Engineer
Project: Construction of 120.97 KM boundary wall between km 192.70 to
Bachelor of Technology
Km. 260.20 in the jurisdiction of DEN/I/Asansol in connection with raising
Civil Engineering
Maulana Abul Kalam Azad of sectional speed to 160 KMPH on Howrah - Pradhankhunta section of
University of technology(W.B.U.T)
Eastern Railway.
2012-2016
Roles and Responsibilities:
Project Planning: Collaborate with project managers and design teams
Skills to understand project requirements. Contribute to the development of
Planning & Billing project plans, timelines, and resource allocation.
Project Management Site Execution: Oversee the on-site construction activities, ensuring
Site Management they align with project specifications. Supervise the construction team
Quality Control to guarantee adherence to safety protocols and quality standards.
Document Control Quality Control: Implement and manage quality control processes,
including regular inspections and testing of materials and construction
Software Skills methods.
MS Office Material Management: Coordinate with procurement teams for timely
Primavera P6 sourcing and delivery of construction materials. Monitor and manage
Autocad material usage to prevent wastage and ensure optimal utilization.
OMS Software Daily Progress Monitoring: Maintain detailed Daily Progress Reports
BSF Software (DPR) to track construction milestones and identify potential delays.
Communicate regularly with project stakeholders, providing updates on
Language project status and addressing concerns.
Hindi Subcontractor Coordination: Collaborate with subcontractors and
ensure their work aligns with project requirements and timelines.
English
Billing: Client Billing ,Manage the billing process for subcontractors,
verifying work completed and facilitating timely payments.
Bengali
Provided technical support to Site engineers.
CIEL HR (On Deputation to Zetwerk Manufacturing Businesses Pvt. Ltd.
April,2022-May,2023 Location- Asansol, West Bengal, India
Site Engineer(Site Lead)

Project: Construction of 120.97 KM boundary wall between km 192.70 to Km. 260.20 in the jurisdiction of
DEN/I/Asansol in connection with raising of sectional speed to 160 KMPH on Howrah - Pradhankhunta section
of Eastern Railway.
Roles and Responsibilities:
Project Planning: Collaborate with project managers and design teams to understand project
requirements. Contribute to the development of project plans, timelines, and resource allocation.
Site Execution: Oversee the on-site construction activities, ensuring they align with project
specifications. Supervise the construction team to guarantee adherence to safety protocols and quality
standards.
Quality Control: Implement and manage quality control processes, including regular inspections and
testing of materials and construction methods.
Material Management: Coordinate with procurement teams for timely sourcing and delivery of
construction materials. Monitor and manage material usage to prevent wastage and ensure optimal
utilization.
Daily Progress Monitoring: Maintain detailed Daily Progress Reports (DPR) to track construction
milestones and identify potential delays..
Billing: Client Billing ,Manage the billing process for subcontractors,

M/S Crystal Construction Company.


February 2020 - March 2022 Location- JAISALMER, RAJHASTHAN, India
Site Lead(In charge)

Project: Construction/upgradation of four/two lane with paved shoulder of NH-68 from Tanot- Ramgarh-
Bhadasar-Jaisalmer(Design Ch.0.00to Ch 125.573) and NH from Bhadasar (Mokal)-Sarkaritala upto Pakistan
Border(Design ch 0.00 to 67.950) under phase- 1 of Bharatmala Pariyojana(Total length 193.523)on EPC
mode in the state of Rajasthan.
Roles and Responsibilities:
Site Execution: Oversee the on-site construction activities, ensuring they align with project specifications
and design. Supervise the construction team to guarantee adherence to safety protocols and quality
standards
Quality Control: Quality of Concrete ,FDD, Compaction of soil. Address any deviations from
specifications promptly and effectively
Daily Progress Monitoring: Maintain detailed Daily Progress Reports (DPR).
Subcontractor Coordination: Collaborate with subcontractors and ensure their work aligns with project
requirements and timelines.
Billing: Billing with Client and Manage the billing process for subcontractors, verifying work completed
and facilitating timely payments.
Client Interaction: Act as a point of contact between the project team and the client
Address client concerns, provide progress updates, and ensure client satisfaction.
M/S Punia Construction Company
January 2019 - February 2020 Location- REWARI, HARYANA, India
Site Engineer

Project: : Construction of a 4-lane Road Over Bridge (ROB) to replace level crossing No
46 at 55/1-2 IR km between Narnaul and Amarpur Jorasi stations on the Rewari-Phulera Section of Jaipur
Additionally.
Roles and Responsibilities:
Overseeing the construction of a Reinforced Earth Wall.
Site Execution: Implementing on-site activities in accordance with the project plan.
On site Client Handling: Managing communication and Onsite interactions with the client to ensure the
quality of work and Plan.
Quality Control: Conducting quality control measures such as Field Dry Density (FDD), Maximum Dry
Density (MDD), and compaction tests on soil to maintain construction standards.
Bar Bending Schedule(BBS) Check at site with approve Design and Drawing at site.
BOQ Preparation: Proficiently preparing the Bill of Quantities (BOQ) to accurately resource
requirements.
Subcontractor Billing: Overseeing the billing process for subcontractors.

M/S Punia Construction Company.


January 2019 - February 2020 Location- REWARI, HARYANA, India
Site Engineer

Project: : Construction of a 4-lane Road Over Bridge (ROB) to replace level crossing No 46 at 55/1-2 IR km
between Narnaul and Amarpur Jorasi stations on the Rewari-Phulera Section of Jaipur Additionally.
Roles and Responsibilities:
Overseeing the construction of a Reinforced Earth Wall
Site Execution: Implementing site activities in strict adherence to established plans, with a paramount
focus on quality.

Hobbies
Travelling Cooking Swimming Cricket

Personal Information.
Name-Md. Imran Alam
Fathers Name-Sakir Alam
Date of Birth: 14/02/1994
Gender: Male
Nationality: India.
Marital Status: Single
Address: Hamid nagar, Burnpur,
Asansol, West Bengal,
India Pin-713325

Here by I declare that the above-mentioned details are true to the best of my knowledge.

DATE:
PLACE: Md Imran Alam

You might also like