Introduction to Construction
Management
PROJECT PRODUCT
3
Phases of a Construction Project
Briefing Stage
• Report Stage
• Stage where ideas originated by individuals are studied with
regard to cost and benefits so as to establish the economic
viability / social; utility of a project.
4
Phases of a Construction Project
Briefing Stage
Activities:
• To appoint a project committee, if necessary
• To appoint a project manager who will have a continuing
responsibility to the client through out the construction project.
• To carry out technical and non-technical investigation so
that alternative proposals may be given due consideration
• To study the various alternatives and identify the most
feasible one.
• To prepare the project report which is the outcome of the
first stage 5
Phases of a Construction Project
Design Stage
6
Phases of a Construction Project
Design Stage
Activities:
• To develop a summary for the final adoption of the most
suitable alternative.
• To carry out technical investigations such as
• Soil investigation
• Topographic investigation
• Material survey
• Market survey
7
Phases of a Construction Project
Tender Stage
Activities:
• To prepare detailed design working drawings, specifications,
bills of quantities, final cost estimate and preliminary
construction program.
8
Phases of a Construction Project
Tender Stage
9
Phases of a Construction Project
Tender Stage
Activities
• To invite tenders from the contractors for the construction work
and to award the contract.
• Prequalification of contractors involves an investigation of the
potential of contractor’s financial, managerial and physical
resources, contractor’s experience of handling similar projects,
etc.
10
Phases of a Construction Project
Tender Stage
Activities
• To prepare contract documents, to be signed by the client and
contractor.
• Holding a pre-bid conference and providing the necessary
information.
• Negotiating contract price with qualified contractor.
• Reviewing documents submitted by the contractor.
11
Phases of a Construction Project
Construction Stage
12
Phases of a Construction Project
Construction Stage
13
Phases of a Construction Project
Construction Stage
14
Phases of a Construction Project
Commissioning Stage
15
Phases of a Construction Project
Commissioning Stage
Activities
• To keep various records of actual work
• To inspect the construction work thoroughly and have any
defects rectified.
• To prepare operating instructions and maintenance manuals.
• To carry out test for performance, such as water tightness and
etc.
16
Importance of Construction and Industry
17
Importance of Construction and Industry
18
PROJECT CONSTRUCTION
MANAGEMENT MANAGEMENT
19
Phase / Function of a Construction Management
Planning
20
Phase / Function of a Construction Management
Scheduling
21
Phase / Function of a Construction Management
Organizing
22
Phase / Function of a Construction Management
Staffing
23
Phase / Function of a Construction Management
Directing
24
Phase / Function of a Construction Management
Controlling
25
Phase / Function of a Construction Management
Coordinating
26
Construction Project Categories
01 02 03 04
28
Stakeholders for the Construction Project
Owner
Professionals Contractor
Goals &
Objectives
29
SPECS 512
End of Presentation
SPECS 512
ACTIVITY #1: Operational Readiness Plan
Outline: Objective
Project Brief
Operational Readiness
-Regulatory Compliance
-Basic Life Support (Security,
Water and Sewer, Electrical,
Elevator, Fire Safety)
-Minimum Disturbance Plan
SPECS 512